Driving the Entire Bay Bridge (Both Directions) During Shutdown 400% Real Speed

Поделиться
HTML-код
  • Опубликовано: 29 авг 2013
  • Access to the Bay Bridge is severely limited during the Labor Day Weekend closure. Mark Jones, who is part of the documentation team, drove the length of the bridge in both directions, including both spans, to document the construction zone. The drive was conducted at speeds under 25 miles per hour and slower near construction. The video has been sped up 400% so you can make the nearly 16-mile drive across the new East Span and the historic West Span, and then back to Oakland, in just 13 minutes.

Комментарии •