Ikorodu Vs Sanwo - Olu

Поделиться
HTML-код
  • Опубликовано: 5 ноя 2024

Комментарии • 7

  • @OLAOLAROYALTV
    @OLAOLAROYALTV 2 дня назад

    Good job baba

  • @kiniunakewiakoniomoibarapatv01
    @kiniunakewiakoniomoibarapatv01 3 дня назад

    Kudos dad

  • @olayiwolakehinde8749
    @olayiwolakehinde8749 3 дня назад

    Despite all efforts of Ikorodu residents performance during general election especially presidential and gubernatorial elections. Governor Sanwo Olu did not complete Igbogbo - Bayeku road and Igbogbo - Igbe Ilara road respectively. Those two road projects have been intermittently handled by government contractors over two years and five years respectively.

  • @AkinseyeAkinwale-w5t
    @AkinseyeAkinwale-w5t 4 дня назад +1

    Akinseye Akinwale

  • @aramideoluwatoyin3363
    @aramideoluwatoyin3363 3 дня назад

    Hnnnnnn did we need Shop rite in Ikorodu most especially at that place -Local Government.
    Can't they go to somewhere else to build their Shop Rite?
    Why?Why?Why?
    Please kindly be considerate now
    This is unfair to us in Ikorodu.
    Please let our legislator stand up on this issue.

  • @ultimateone
    @ultimateone 3 дня назад

    Nkan hun se Arakunrin yi.