Connecting current transformers for 3 phase metering

Поделиться
HTML-код
  • Опубликовано: 14 окт 2024
  • In this one I'm connecting current transformers and meter modules for some 3 phase sub mains.
    This video follows up on the day i spent with john Bagley, checkout that video here: • Fitting 3 phase molded...
    If you enjoy electrical content please subscribe to the channel and checkout my links below 👇
    M Y W E B S I T E ⚡
    residualcurren...
    M Y L O A D O U T 🛠️
    residualcurren...
    B I G B O O T S D I S C O U N T 🥾
    bigboots.co.uk... - Use code RESIDUAL
    U N I L I T E D I S C O U N T 🔦
    unilite.co.uk/... - Use code RESIDUAL
    J O I N T H E C H A N N E L 🤝
    / @residualelectrical
    I N S T A G R A M 📷
    / residualcurrent
    T I K T O K ♪
    vm.tiktok.com/...
    The works carried out in the video and the opinions shared are my own, and not representative of the associates and companies in the video.
    This content is purely for entertainment purposes and is in no way a "how to", tutorial or educational video.
    Please consult an electrician when dealing with any electrical installations.
    #electricianlife #electrical #electricalengineering

Комментарии • 53

  • @JohnDop
    @JohnDop 2 года назад +11

    "going to go to cities and get ripped off..." love it 😂

  • @travishamilton1659
    @travishamilton1659 2 года назад +5

    Love the videos man . And love the fact that you take pride and passion in your work

  • @joshuaarmstead5787
    @joshuaarmstead5787 2 года назад +4

    When I'm doing the Schneider DBs I swap the bottom with the top lids so you can gland to the centre, then you can also add the other armoured cables where ever you want, without having to use the knockouts provided. Just a tip I use myself 👍 top content by the way

  • @JRCElectrical
    @JRCElectrical 2 года назад +3

    Really enjoy your videos mate, class editing and awesome content.

  • @robertoconnor616
    @robertoconnor616 2 года назад +5

    Great content would love to see you doing conduit bending tutorials. 👍

  • @morganarmstrong967
    @morganarmstrong967 2 года назад +2

    Last time I installed those they required 6a fuses on the CTs and 250mA fusing on the voltage side to protect the meters. Pretty sure the drawings specify this in the greyed out A and B sections. Unless they are LVCT but they usually use patch leads

    • @morganarmstrong967
      @morganarmstrong967 2 года назад

      @@residualelectrical Nice, I need to look at using those next time. Its a pig of a job trying to get CTs on in the tight cableways! Would save a few headaches. Out of interest, What is the Veto bag you are using to carry your multifunction? Looks like a giant version of my MB3

  • @DjMaidenV
    @DjMaidenV 2 года назад

    that slow-mo montage at 2:00 was a thing of beauty

  • @three-phase562
    @three-phase562 2 года назад +4

    Interesting current transformer. In general voltage transformers have a high impedance on the primary and low impedance on the secondary, current transformers are the other way around. You can have multiple turns on a current transformer winding to change the ratio if desired.
    Was the wiring for the secondary premade by the manufacturer? We would only ever allow ring terminals on current transformer secondary wiring to reduce the danger of an open circuit secondary, although the module may have open circuit protection built in. One side of the secondary is usually earthed so the output isn't floating.

    • @mattyclark1981
      @mattyclark1981 2 года назад

      Is there any sort of shorting link on the secondary side of those Schneider modules? Didn't look like it, but you need it if you ever have to change the meter out.

  • @jpelectrical7677
    @jpelectrical7677 2 года назад +3

    You can get double pole RCBOs for the Acti9 boards but they take up 2 ways and you have to fit a distributed neutral kit as the don't use the neutral pick up for the Isobar P RCBOs. Hopefully Schneider look at that soon.

    • @uplightuk8924
      @uplightuk8924 2 года назад

      Interesting that the Schneider RCBOs don’t isolate both poles - I’ve been using them this whole time assuming that they were like any other RCBO. Good job I’m mainly a domestic spark so in most cases isn’t the end of the world if it isn’t DP lol

  • @АртемМаркин-й5э
    @АртемМаркин-й5э 2 года назад

    Hello, Michael. It's always great to watch videos you film. Let me ask how old are you? You seem to be experienced sparky but you look pretty young man.

  • @ForTheBirbs
    @ForTheBirbs 2 года назад

    I tuna'd in and thought there's something fishy going on. But saved your bacon.... Good luck with continuing to work out the new cam. Cheers

  • @iknowmyfootball3901
    @iknowmyfootball3901 2 года назад +1

    Your channel is blowing up you and jointech cabling are the governor's

  • @dipdobdab9202
    @dipdobdab9202 2 года назад

    Hi, whoever has installed the mccbs hasn't installed the terminal shields, you have to order these seperatley. You now have a PB that should be form4 that is now potentially dangerous as it has exposed parts when the front cover is removed. You can obviously install a label on the front to highlight the danger, but it is not a proper job.
    Also, you're using the wrong type of crimper for the type of cable, the "nut cracker" is for flexible/h07 cable with fine strands (class 5 cable). You need to use the hex type crimper for the cable type you have used (class 2 cable).
    Hope this helps 👍

    • @dipdobdab9202
      @dipdobdab9202 2 года назад

      Yes you are right, it is 3b when configured as 3 pole.
      When my company installs powerpacts we usually install the 4 pole system, which is normally within our clients spec. Maybe I just assumed the PBs were form4 due to the name (powerpact4) 😖.
      I suppose it also makes sense to bin the neutral bar in case of any potentials.
      ETS normally have good hire rates for crimpers. Cheapest I can think of to buy is the HT51, but is obviously not an electric one 🤙

  • @rscelectrical7091
    @rscelectrical7091 2 года назад

    Great video mate, quick question: How do you find the Kewtech 2 pole tester ?. My Fluke T90 has died on me.

  • @jonathanInLondonUK
    @jonathanInLondonUK 2 года назад

    Video after video, Mike looks like the cat that's got the cream :)

  • @BlueButtonFly
    @BlueButtonFly 2 года назад

    2:35. What's happening with the handle of the screw driver? Just manhandling wire into shape or am I missing something?

  • @jordansalkeld1
    @jordansalkeld1 2 года назад

    Question bud, usually for me when doing a DB like that. I would have taken the main earth from the 5 core armour upto the earth bar at the top of the DB and connected a fly lead from the banjo to the DB case with some brass hardware at the banjo and the supplied hardware to mount to the case.
    Do you have any earth up at the bar?

  • @HDJoergensen
    @HDJoergensen Год назад

    Shouldn't you have mounted the CT's with Torque wrench?

  • @electrician247
    @electrician247 2 года назад

    Proper sparky work 🙌💪

  • @anthonybragg
    @anthonybragg 2 года назад

    We found those meters a nightmare, give me Eaton any day all you have to do is plug a pre-made lead from one to another and the CT is a plug-in data patch leed

  • @kristiangoransson6104
    @kristiangoransson6104 2 года назад

    Is it completely forbidden to work on a board thats live?
    As long as all circuits are mounted or the live parts are covered it shouldn’t be a problem?
    I know that i’m a bit sloppy with safety sometimes but it’s common over here to work within live boards as long as we’re trained and the level of safety is good enough. Working next to live parts in distribution cabinets is almost impossible to avoid.

  • @kevinpickett7249
    @kevinpickett7249 2 года назад

    Ref the banjos all we ever use to do was make sure you had good contact to the board ( scrap the paint ) ( not a banjo in site 😁) now it’s brass banjo must have brass nut and bolt ref bringing the 25 mm directly under the main switch yes u only do it once 😂

  • @Trentass136
    @Trentass136 2 года назад

    Talking about “pride” how come you left so much slack on the CT control cables in the board?

  • @daniski6476
    @daniski6476 2 года назад

    tuna is the best.. best prank on site is opening a tin of tuna of hiding in someones van. as the heaters are on in the van it creates a grim smell 😂😂😂😂

    • @Richardincancale
      @Richardincancale 2 года назад +2

      Can I recommend prawns if you’re visiting someone’s house who’s got big hollow curtain rails. A few prawns stuffed in there can lead to a malodorous problem for months, and not too easy to track down 😊

  • @peanutpotion
    @peanutpotion 2 года назад

    Class video pal👍🏼

  • @ghspaelectricalservices9296
    @ghspaelectricalservices9296 2 года назад

    Nice one mate, top work

  • @krishtheobald4227
    @krishtheobald4227 2 года назад

    Quick question Mike- why do you put the banjo for the SWA on the outside of the DB and not the inside?

    • @declannocher2049
      @declannocher2049 2 года назад +1

      I've been been instructed by certain project engineers to do this in all cases so that they can confirm that it's there. My reply was to say that if there's a brass bolt sticking up it should be pretty fucking obvious, but as it is, who cares, I guess it's preference of some people.

    • @impactvision
      @impactvision 2 года назад +5

      if you are not using brass locknuts then it is good practice to have the banjo with brass on brass contact with the cable gland body especially if you are using it as a cpc.

    • @declannocher2049
      @declannocher2049 2 года назад

      @@impactvision Sound, makes perfect sense, and me kind of embarrassed to have never thought of this from a connection standpoint.

  • @anddrewb1367
    @anddrewb1367 2 года назад

    How are the meters read, are they connected via ethernet or modbus or something. Or do they have to do it locally?

    • @jordansalkeld1
      @jordansalkeld1 2 года назад +1

      These ones look at be locally read. No network cables present. Pretty sure they have an RJ45 port on the top to plug in for ENMS remote reading

  • @ELECTRICLIFE4U
    @ELECTRICLIFE4U 2 года назад

    Nicely worked👍👍

  • @piotrlobacz
    @piotrlobacz 2 года назад

    Not sure about this but aren't CTs now semi conductor based using hall effect sensors?

    • @fohdeesha
      @fohdeesha 2 года назад

      Hall effect sensor based CTs exist, but they're more expensive, more complex, and typically have a very strict current monitoring range, so not a good fit in load panels where faults could cause very high temporary currents - in a typical transformer CT, large transient currents like faults and motor starts etc would only cause a split second of transformer saturation and nothing else, whereas a hall effect sensor would be damaged. The big advantage of hall effect sensing for current is that they can measure DC currents, so DC applications is where you'll mostly find them

  • @brianoneill3244
    @brianoneill3244 2 года назад

    Great job, great content.

  • @iankerr4380
    @iankerr4380 2 года назад

    Hi Mike, where do you get your gloves from?

    • @iankerr4380
      @iankerr4380 2 года назад

      @@residualelectrical cheers mate

  • @mikethemask1525
    @mikethemask1525 2 года назад

    Do I see you in the latest professional electrician mag messing about with a easy9......🧐👀👀

  • @JRCElectrical
    @JRCElectrical 2 года назад

    Big up the tuna sandwiches aswell

  • @iqking2828
    @iqking2828 2 года назад

    Great content once again

  • @365aqualife8
    @365aqualife8 2 года назад

    Nice and neat job 👍

  • @alaricsnellpym
    @alaricsnellpym 2 года назад

    You have exactly the same taste in petrol station lunches as my youngest child - does that mean there's a bright future for her in a career in the trades? :-)

  • @jjimmyrjagger
    @jjimmyrjagger 2 года назад

    What are ct's

  • @andyxox4168
    @andyxox4168 2 года назад

    What percentage of CTs do you get in the right polarity or in other words how often do you piss off the commissioning engineers? 😂😂😂

  • @electrojessy4270
    @electrojessy4270 2 года назад

    You put the nutral at the wrong side.
    Just kidding no idea way but sneider has the nutral at the left side

  • @eddtheduck
    @eddtheduck 2 года назад

    No wonder you can’t complete how you’d like it as nick bundy cowboy sparky installed the cable

  • @guentherehlen3665
    @guentherehlen3665 2 года назад

    I am 3 phase Electricalengineer too , lol but I guess you job is not so interesting