HOW TO TRANSPORT A 73,5 METER WINDMILL BLADE

Поделиться
HTML-код
  • Опубликовано: 7 фев 2025
  • This is an example of how we, with our specialized knowledge, transports windmill blades (this transport is in Denmark). Our patented transport system enables us to lift up the bracket (for the root of the blade) mounted on the truck and to control the special dolly with clamp (specialized for each size of blade). This system allows us to pass through narrow places with signs etc. without demounting anything - instead we lift up the bracket mounted on the truck and have one person controlling the dolly.

Комментарии • 9

  • @xavierfolger1304
    @xavierfolger1304 7 лет назад +4

    this is after 18 years as an heyvy haulage fan still allways impressive. how easy an 80m transport can take a roundabout when theres the right structure, the right equipemnt and skilled crew

  • @eldiablo8019
    @eldiablo8019 7 лет назад

    Serious driving skills.

  • @nvm0
    @nvm0 8 лет назад +8

    Fuck, I took the wrong exit

  • @shahidiqbal4012
    @shahidiqbal4012 7 лет назад

    Makes the
    And

  • @futer0
    @futer0 8 лет назад +4

    China the best system

    • @Kawalicious
      @Kawalicious 8 лет назад +12

      China is shit.

    • @xavierfolger1304
      @xavierfolger1304 7 лет назад +1

      the windmil lifting system is only copied from german engeneers at goldhofer!

    • @xavierfolger1304
      @xavierfolger1304 7 лет назад +1

      this adapter lifting system is only usable till blade lenght of 50meters and areas were no bridges, powerlines or toher obstacles make it useless. so if you leave a comment, leave a comment with the right basics and knowlegde