KABALEHA HYDROPOWER PROJECT 9MW UGANDA
HTML-код
- Опубликовано: 15 окт 2024
- DOTT SERVICES has been the EPC contractor for these projects. The company has developed an in-house capacity in Uganda to deliver the critical Hydropower Infrastructure and has an end-to-end metal fabrication unit along with specialized equipment (bending up to 65mm high-speed steel) in the fabrication of penstock and water conductor system pipes used in Hydropower Projects.
I would like work in your hydro plant,i am electrical engineering graduate