SAP EWM- Layout Oriented Storage control(LOSC) in warehouse management

Поделиться
HTML-код
  • Опубликовано: 8 янв 2025

Комментарии • 4

  • @kartikNemali
    @kartikNemali 10 месяцев назад

    I have been awaiting for your video

  • @indiranagasaikishoreseelam6307
    @indiranagasaikishoreseelam6307 8 месяцев назад

    Really a Good One Sir

  • @dipranjankhanra2362
    @dipranjankhanra2362 10 месяцев назад

    I have requirment - I need to move HU - A location to B location, B location to C location , C location to D location. In A location good receipt will be done as default HU and in C location repcking will be done. In order to do that I understand I have to putway mix of POSC and LOSC. My question is it possible to configure system first LOSC and then POSC?