Track Lifting at Pontywaun

Поделиться
HTML-код
  • Опубликовано: 5 окт 2024
  • This video was filmed by an amature who documented the last years of branch lines in south wales

Комментарии • 3

  • @eirugsiongriffiths8563
    @eirugsiongriffiths8563 6 лет назад +1

    This could have been turned into a new passenger service. We should be preserving our railways for use not closing them.

  • @jasonl5967
    @jasonl5967 6 лет назад

    the whole site is now overgrown, the bridge the track at 0:34 runs under has been filled in, the footbridge is still there but now has been closed so a small foot crossing to Halls Road Terrace was built, only a small portion of track remains where the footbridge is. Shame that the line was not kept open and diverted to Blackwood where the new road bridge was built.

  • @nigelcarter9503
    @nigelcarter9503 8 лет назад

    Sad