IBS-DIY Innovation Park @ Politeknik Port Dickson

Поделиться
HTML-код
  • Опубликовано: 10 сен 2024

Комментарии • 29

  • @kennedy67951
    @kennedy67951 3 года назад +2

    Some of this Structure wasn't built Correctly. The walls were not Vibrated causing Voids in the Concrete. This would cause weakness in the Structure. The Weather Moisture Wrap wasn't Installed Correctly, either. This may let Water into the Structure causing Mold, Mildew, and Rot to set in over a period of time. Over all, 'this type of Structure is the way of the Future in my opinion. Any mistakes are easily Fixed. Not so, in Wood Construction. The Expanded Metal used to Incapsulate the Outside of the Building was, and is, a very good Design in my opinion. Many Exterior Application can be Added changing the look from the ordinary to the Extravagant. Very Hard to do with Wood. Utilizing Steel in such a Designing Manner gives Longevity that you just can't get with Wood Construction. Thanks for the upload. It's Appreciated by me anyway.

  • @adlisan
    @adlisan 6 лет назад +1

    cukup respect pada tenaga kerja ditengah panas dan berjaket tebal, susah nak cari, janji bergaya... haha...

  • @wardahhani5787
    @wardahhani5787 6 лет назад +1

    Untk smbung rumah mmg sesuai guna cara ini. Lebih jimat masa

  • @kokanpioneer
    @kokanpioneer 3 года назад +1

    Tabik kepada pendidik dan pelajar amali serta kontraktor yang membantu. Pada masa akan datang diharap pelajar amali lebih agresif daripada kontraktor.

  • @dusty5
    @dusty5 Год назад

    How to install the mounted A/C? Can it be done since the wall is steel l structure?

  • @zainudinsharif144
    @zainudinsharif144 5 лет назад

    Ni mcm kerja pratikal Dan amali bagi subject perbinaan untuk perlajar2.d politeknik portdickson

  • @ahmadfaiz9265
    @ahmadfaiz9265 4 года назад

    ramainya pekerja. kos tggi kat man power klu camni
    gurau je

  • @abadihusin1266
    @abadihusin1266 3 года назад

    Mana boleh dpt material besi structure dan pvc tranferent tu...klu ada bgi no fone boleh

  • @abcexpert2007
    @abcexpert2007 4 года назад

    👍👍👍

  • @mjworldwide3105
    @mjworldwide3105 4 года назад +1

    xde footing ker mmg structure tu pegang di slab tu jer ker

  • @hidayaah6359
    @hidayaah6359 2 года назад

    Yang bening di taroh di dinding dan langsung di cor namanya apa bang

  • @adammaina5612
    @adammaina5612 5 лет назад

    Very good work.
    Which material did you use for shuttering? Is it transparent pvc? Very innovative.
    Did you use cellular concrete for infill?
    What is the plinth area? It took how many days to complete?

  • @mokhzanialjeb7860
    @mokhzanialjeb7860 3 года назад

    Sngat membanggakan bagi Politeknik Port Dikson.... yang muskil kenapa Cina yang pasang tiles... dia orang tu student ke...

    • @fatehnazaruddin1313
      @fatehnazaruddin1313 2 года назад

      X semua projek student bole buat...kalo x dari awal render lantai pun student buat....Ok la tu bagi cina psg tile dari bagi Kat warga asing mcm wak2 indon atau bangla lol

  • @MelayuMelanauIban96
    @MelayuMelanauIban96 Год назад

    Mesti mahal kos dia kan?

  • @SaadonAksah
    @SaadonAksah 4 года назад

    ohsem!

  • @toitoikapeke4373
    @toitoikapeke4373 4 года назад

    Bisa buwatkan gabar desain ruma baja ringan 2 lantai

  • @memen1923
    @memen1923 6 лет назад

    Ada cara lebih mudah

    • @memen1923
      @memen1923 6 лет назад

      Ada cara lebih mudah bina rumah, di indonesia dah pakai

    • @gladysmonah9946
      @gladysmonah9946 5 лет назад

      Hi I'm so happy with this mode of house building, how can i get in touch, am in Kenya.