- The steam Travelling Cranes' main job at the Cockatoo Island dry docks was to pull the ships into position (like a tug) and then lift in the hull stays. They have a relatively small lift capacity. This is the first time all three have been running together
May be I should have said what was the WLL?
What was the SWL? of each crane.
The two Priestman Cranes have a lift limit of 5 tonnes