FIRST TIME three dry dock steam cranes are running at the Cockatoo Island Steam Crane Day

Поделиться
HTML-код
  • Опубликовано: 5 фев 2025
  • The steam Travelling Cranes' main job at the Cockatoo Island dry docks was to pull the ships into position (like a tug) and then lift in the hull stays. They have a relatively small lift capacity. This is the first time all three have been running together

Комментарии • 3

  • @archmcdonald6170
    @archmcdonald6170 6 месяцев назад

    May be I should have said what was the WLL?

  • @archmcdonald6170
    @archmcdonald6170 6 месяцев назад

    What was the SWL? of each crane.

    • @piratefleetau
      @piratefleetau  6 месяцев назад

      The two Priestman Cranes have a lift limit of 5 tonnes