Upgraded Mekong Riverbank along Watnak,

Поделиться
HTML-код
  • Опубликовано: 15 окт 2024
  • It looks the Mekong Riverbank upgrade is almost complete at this side of the river project in Donchan Road, Watnak Km 4, Vientiane.
    With the dry season, water level of the Mekong river is lower and the wide sand shore across the river along Nong Khai, Thailand, are visible.
    Area video on Jan 2023: • Mekong Riverside Devel...
    #visitlaos #nongkhai #reclamation

Комментарии •