Gravel Crusher Move And Set Up And Crushing!

Поделиться
HTML-код
  • Опубликовано: 19 окт 2024
  • We started off with 4 hour round trip moving. Then we were blending 1/2” chip rock and sand back together to make chip seal material. We finished that off and started on the concrete rock where they were hauling material from another cut to stockpile beside crusher. We are running 500 tph total through put which is getting split 5 ways! Making 3/8s minus sand, pea rock, MF/ Dust, chips and 3/4” concrete rock!