Lebuh Raya WCE Seksyen 7: Dari Jalan Kunci Air 2, Kuala Selangor ke Lebuh Raya LATAR (Januari 2025)
HTML-код
- Опубликовано: 4 фев 2025
- Drone: Dji Air 3
Recommend Drone:
1. DJI Air 3S Camera Drone: s.shopee.com.m...
DJI Air 3S Intelligent Flight Battery: s.shopee.com.m...
2. DJI Air 3 Camera Drone: s.shopee.com.m...
DJI Air 3 Intelligent Flight Battery: s.shopee.com.m...
3. DJI Mini 4 Pro Camera Drone: s.shopee.com.m...
DJI Mini 4 Pro Intelligent Flight Battery: s.shopee.com.m...
4. DJI Avata 2 Camera Drone: s.shopee.com.m...
DJI Avata 2 Intelligent Flight Battery: s.shopee.com.m...
----------------
The West Coast Expressway (WCE) / Lebuhraya Pantai Barat (LPB) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia.
The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use.
The West Coast Expressway is a privatization project approved by the Government to West Coast Expressway Sdn Bhd (WCE). The project, operates on a build-transfer-transfer model. The project is expected to be completed in five years’ time.
The West Coast Expressway (E32) commences at a junction with Selangor State Road FT31 which runs from Banting, Selangor and ends at the ramp of Changkat Jering toll plaza of the North-South Expressway at Taiping, Perak.
It is planned and designed in such a way so that it is well-connected to the existing highways (such as PLUS, SKVE, NKVE, NNKSB, LATAR, KESAS, etc.), in order to maximize its coverage and gives the road users more options while travelling.
The entire expressway with 21 interchanges will provide convenience to users to plan and travel more efficiently.
Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.
#wce #shahalam #selangor #malaysia #fawwazmedia
--------------------
Ni bila siap nanti org² dri puncak alam dan sekitar kalau nak naik ke utara memang jimat byk masa ni.. silap² boleh jimat sejam. Skrg kalau dari saujana utama nak ke changlun, naik WCE total 5 jam lebih.. tak sabar..
Sudah lama tidak melihat perkembangan WCE Seksyen 7 ini
Setakat dec 2024, baru 77% siap seksyen 7 ni. Sekarang dah 28 Jan 2025 😁 Tahun 2026 raya puasa pertengahan mac 2026. Tak berharap sangat boleh siap. Haha. Sebab dari Awal Feb 2025 - Hujung Feb 2026, ada 13 bulan jer. Kalau progress 1 bulan 1%, 78% + 13% baru 91 %.
Sek yg paling dramatic, apabila Selangor yg dikira main trading centre, jln pintu masuknya tak siap2, tapi dihujung alam dah siap. Komen pula ada yg kaitkan isu pengambilan tanah. Tak ke ni project rancangan Malaysia ke berapa zaman samy velu dulu yg dah disurvey puluhan tahun dulu.
Bila nak siap nyer… adehhhh
2026
Berkilo kilometer drone terbang, tak nampak pulak org buat kerja. Mungkin di ambil masa hari cuti or mlm?
Lambat le siap.😢😢😢
jalan kunci air 2 to kuala selangor end from march 2026
west coast expressway
Tahun dpn pun tak siap ni.. sabo je la.
YAY!!!
❤❤❤❤❤
Flyover jaln kunci air 2 nampak sudah siap. Bulan dec lepas lalu situ kena divert ke jln bukit belimbing...
10 tahun lagi siap kot 😅
2026 target siap.
Progress terlalu perlahan... sangat2 perlahan... lembab bukan perkataan yg sesuai.. perkataan apa yg bleh guna utk lebih teruk dr lembab..
lemah shahwat
Ni trpakai utk ltu/kbkk 😂
@@haziqfaris3319 ye betul. yg ni ok lah tahun depan siap seperti dia target. nampak progress dia. saja usik para netizen haha cakap 10 tahun
Progress sg tengi bos 🙏🏼
Sakit hati tengok spesifikasi lebuhraya LTU/CSR. Kurang2 patutnya buat macam WCE. Letaklah tol. Ni highway banyak naik turun. Tengok depan tak sampai 50 meter bukit. Lorong kecemasan pun kecik. Speed limit sama macam jalan 2 lorong.
berapa km tuan felai ni?nampak macam jauh betoi
Mcm tak lama dah sek 7 ni nak siap.
2026 gak ni
10 thn pun blm tentu siap...emmmm.
Negeri terpaling maju kt Msia?????
Banyak lanbat company ini susah
Susah company ini
Kenapa wce ni dia campur dgn jln kg, x buat mcm plus direct je?
Permintaan yb dulu2 kawasan terlibat sebab xnak bandar dia mati
Nak jimat kos gak. Sebab wce tak ramai orang guna. Takat nak cater traffic time RAYA, tak berbaloi.
@@tractormax satu lagi tak nak usik hutan & sawah padi kat tanjung karang tu
Yg fly over jalan rawang tu mereka buat 1 fly over ade 2 line jalan raya atau 1 fly over jalan rawang ade 4 line jalan raya?
2 lorong tu, kalau 4 lorong
jambatan ada 2.
@@hayasakinaru5522Ouhh.. Suruh mereka buat tambah 1 lagi jambatan 2 lorong jalan rawang. Sebabnya kat malaysia ni makin lama makin ramai pulak org. Jadinya takde lah jalan jem banyak kereta untuk nk kena tambah 1 lagi jambatan 2 lorong di jalan rawang daripada kuala selangor ke bestari jaya.
Jalan ni dari mana ke mana? Berapa ribu km?
Dalam video tu semua maklumat lengkap dari mana ke mana kalau fokus mesti dapat..selebihnya boleh google
Lambat betul
jln bertoll lagi...
Susah company ini