Tram Update: Haul Rope Splice and Cabin Hanging

Поделиться
HTML-код
  • Опубликовано: 11 сен 2024
  • The moment we’ve all been waiting for is here-the new Lone Peak Tram cabins are docked on Lone Mountain. Over the last few weeks, our teams have been working through new snow to install the Tram’s haul ropes, complete the splicing, and hang the brand-new cabins.

Комментарии • 8

  • @RD-cu8ld
    @RD-cu8ld 10 месяцев назад +5

    Insane. It blows my mind humans are capable of constructing things like this

  • @robertkautz9146
    @robertkautz9146 10 месяцев назад +2

    CANT WAIT UNTIL JANUARY TO GO UP THERE!!!!

  • @jeffjensen27
    @jeffjensen27 10 месяцев назад +2

    ONLY AT BIG SKY CAN YOU BE GUARENTEED BRAND NEW SUPER HIGH SPEED & INCREDIBLE HIGH TECH WITH Their Chairlifts.

  • @user-do1oh9hw1n
    @user-do1oh9hw1n 10 месяцев назад +2

    ready for shreddie this winter

  • @Chrisg001
    @Chrisg001 9 месяцев назад

    I’m so glad I’m here as an operator for the 50th!

  • @beitliche
    @beitliche 10 месяцев назад +2

    Awesome! Can't wait to ride it!

  • @Phallas-vo9nc
    @Phallas-vo9nc 9 месяцев назад +2

    That dude walking the cables has to have a screw loose up in his noggin. I get shaky legs riding the tram from INSIDE