1 MW Solar Plant | 1 MW Solar Plant Cost |Generation | Financials| MW Solar BOM |Land Required |

Поделиться
HTML-код
  • Опубликовано: 14 ноя 2024

Комментарии • 213

  • @sudeepmanek3230
    @sudeepmanek3230 2 года назад +12

    This primarily looks like a financial disaster as no margin of safety is considered and also after a few years the maintenance cost will shoot up. Power tarriff remains same.

  • @vinayakthote8411
    @vinayakthote8411 2 года назад +5

    Same tarrif for 25 years.
    But inflation Se to badme to profit kam hojayega.
    Plz explain it

  • @vasantdhake6981
    @vasantdhake6981 2 года назад +5

    सबसे पहले बॅक ग्राउंड musics बंद करो

  • @diwakarsharmaofficia
    @diwakarsharmaofficia 3 года назад +6

    Wrt financial modelling for a solar plant in 5 hectares land in Rajasthan with 330+ sunny days, I wanted to know the investment required, annual revenue and net profit after taxes. Also what should be the ideal power generation capacity. No loan required in the capital structure.

  • @venkat1486
    @venkat1486 3 года назад +8

    Hi Sir, thank u for ur great and clear explanation. Can u present a video on wind solar mill or hybrid solar wind mil and its cost along with pros and corns

  • @tyagirajdeep
    @tyagirajdeep 2 года назад +5

    You have not included the cost of civil construction, the building that will house the entire equipment like inverter, transformer etc

  • @kindratarun
    @kindratarun 3 года назад +4

    Can u also give detailed BOM for grid connected 2 MW Solar project with Battery Backup for industrial use ...(with type of batteries, OEM details, and inverter OEM, preferred technology of panels for 2MW Project) Voltage level selection for evacuation , associated switchgears / cables / other components etc..... Can i get in touch with you ..?

    • @fortunewosu
      @fortunewosu 2 года назад

      Was he able to give you the estimates? Pls share with me.
      I have such project with me now.

  • @nayanpitale2693
    @nayanpitale2693 2 года назад +4

    Agriculture land pe kar sakte he kya project ?
    Ya fir land ko Non Agriculture karna padta he ?

    • @adwitsolar
      @adwitsolar  Год назад

      yes on agriculture land you can also watch PM KUSUM vdo at our channel where we explain how on agriculture land

  • @Aryvrt
    @Aryvrt 2 года назад +2

    Can you share with me a report of 1MW project in Prayagraj, Uttar Pradesh 🙏

  • @tilakpusala7382
    @tilakpusala7382 Год назад

    Can you please Make a video on 500 kw solar panel cost

  • @Rangilo800
    @Rangilo800 28 дней назад

    Sir all information good but trafi rate Govt hmare Rajasthan Jodhpur me abhi 2.75 rs . Kusum yojana me khuli hai ..
    3 rs se kam jayada benifit nahi hoga sir 10 ya 12 year loan free hoga uske bad maintenance bahut ayega supply bhi full nahi degi ..
    Fir bhi acha hai buisness current me

  • @puspendrasingh6250
    @puspendrasingh6250 3 года назад +3

    Hi sir your way of explanation is so clear and impressive. Can I have your contact details for proper communication and guidelines as I am interested in. And I am from madhya pradesh I want to know government support system in my state too. I have 30 acar of land and substation is nearly 8 km from my land.

  • @prathmeshpathya9672
    @prathmeshpathya9672 3 года назад +3

    What is the investment returns of 500 kw solar plant. Discom rate is 3 rs. Land is my is it wort as returns.

    • @kesavans2399
      @kesavans2399 3 года назад

      Ping me 8220773663

    • @Kalyannik
      @Kalyannik 3 года назад

      @@kesavans2399 I want to install solar plant in my field can you tell me the process

    • @adwitsolar
      @adwitsolar  Год назад

      approx 11 to 15%

  • @yousufkhan8077
    @yousufkhan8077 Год назад

    Hi sir one acer land how many solar panels can install and cost of panels kindly guide me and income also

  • @manjunathgkallur
    @manjunathgkallur 3 года назад +4

    highly appreciated. thank you

  • @manishsingla370
    @manishsingla370 3 года назад +4

    Your tariff rate is wrong govt pays only 2.748 so according to that if we considering the interest . In 25 years project will not able to pay interest nd forget that revenue will return the investment

    • @adwitsolar
      @adwitsolar  3 года назад

      tariff rate decided by bidding process, it varies state to state or on project to project, I considered 4 for just example at that time it was approximate 4.
      you can calculate as per actual tariff. If you find unviable then should not go.

  • @harshadukia
    @harshadukia 3 года назад +2

    How much power can be generated in a 20000 sq.ft. open land in the outskirts of Mumbai

    • @adwitsolar
      @adwitsolar  3 года назад +1

      200 to 250 kw solar plant, generation approximate 275000 units per year.

    • @harshadukia
      @harshadukia 3 года назад

      @@adwitsolar also could you tell me the cost of setup for this in Maharashtra?

  • @AmberAgarwal
    @AmberAgarwal 7 месяцев назад

    sir hme area given hai ground mount solar plant ka uski capacity kaise nikale

  • @Mirsab
    @Mirsab 3 года назад +3

    I can understand Hindi but you should put (Hindi) in the title because the title is in English but the video is in Hindi, which is misleading.

    • @adwitsolar
      @adwitsolar  3 года назад +2

      Ok, I will consider it for next upload and thanks for your valuable feedback.

  • @josepadilla8281
    @josepadilla8281 4 года назад +5

    This seems interesting, is there a English version? Would love to do a project like this.

    • @adwitsolar
      @adwitsolar  4 года назад +2

      not now English version, but in future with sub titles

    • @dbsblinds4264
      @dbsblinds4264 3 года назад

      Very informative video, keep it up thx for help

    • @raton3527
      @raton3527 3 года назад

      With 1MW solar farm.. One day how many units of current can produce????

    • @dailydoseofrandomvideos5482
      @dailydoseofrandomvideos5482 3 года назад

      @@adwitsolar what is 3.5cr in dollars

    • @anant1985
      @anant1985 3 года назад

      @@dailydoseofrandomvideos5482 Google

  • @Deshiyoutuber07
    @Deshiyoutuber07 7 месяцев назад

    Sir bank loan eligibility or emi ka bataye or kitne year me hogi

  • @kindratarun
    @kindratarun 3 года назад +2

    Thanks a lot sir for informative video .. can u give more details of BOM like type of cables SCBs, Inverter technology and currently available MW inverter OEMs, Best type of panels etc ... what is Wp considered for this calculation, no of panels, or incase ... can u share any link to this details ....thanks again in advance,

  • @yashmarathe5597
    @yashmarathe5597 2 года назад +1

    Ky solar power plant kahi bhi settle kar he ki usme bhi terms and conditions hain

    • @adwitsolar
      @adwitsolar  Год назад

      you can watch our latest vdo PM KUSUM where you can get basic details and any further query let us know

    • @yashmarathe5597
      @yashmarathe5597 Год назад

      ​@@adwitsolar sir actually muze 1 mega watt ka solar project karna hain . That's why i would like to meet u personally....

  • @chandgan7315
    @chandgan7315 3 года назад +2

    Hi.. Thanks for the video, I see that by KUSUM yojna we can get 60% investement form India govt . Is there any specific reason why you didnot mention that in the video ? Can't we not rely on that yojna ?

    • @adwitsolar
      @adwitsolar  3 года назад +2

      In KUSUM, you will get subsidy only in agriculture water pumps, not on solar power plants of .5 to 2 mw. please read once more the policy document.

    • @ranveersekhon83
      @ranveersekhon83 2 года назад +1

      Bharat Sarkar says lot of things , but it doesn't go on ground.... Banks don't give a single penny for solar kusum yojna ...

  • @ankitraj843
    @ankitraj843 3 года назад +2

    apke video m background music bahut jyada rahta h use kam kijiye

  • @kiran-yz8io
    @kiran-yz8io 4 года назад +2

    Sir 1000 acres land me investment kitna ayega ?? Kitna time me capital return hoga?? ..... me karnatak se hun ... 100% loan mileg kya??

    • @kiran-yz8io
      @kiran-yz8io 3 года назад

      @@kirankumarkp2704 yes heli en agbeku

  • @laltellgm882
    @laltellgm882 3 года назад +2

    Sir gujrat mai patan district mai kya rate chal raha hai ??

    • @adwitsolar
      @adwitsolar  3 года назад

      rate is approximate same all over india.

  • @sameervadje8588
    @sameervadje8588 7 месяцев назад

    As per you say a Annual Consumption of 1 MW is 1.5 lacs kWH is wrong , Annual Consumption Approximately 15 - 17 lacs kWH

  • @Opinion221
    @Opinion221 2 года назад +1

    Great

  • @KewalTravel
    @KewalTravel 2 года назад +1

    Video is nice but increase voice volume and decrease music volume

  • @mantu1700
    @mantu1700 3 года назад +3

    Back ground music Jayada hai

  • @ramyaranivanapala5961
    @ramyaranivanapala5961 3 года назад +2

    And I need exact details and In prakasam district, Is this business is suitable, I mean temperature is suited or not

  • @akhiltharaka-qf5yv
    @akhiltharaka-qf5yv 10 месяцев назад

    Does solar have any board for references?

  • @AbhishekSingh-vm9pb
    @AbhishekSingh-vm9pb 3 года назад +2

    i need a job in solar field , i am also work on solar pv installation

    • @adwitsolar
      @adwitsolar  3 года назад

      You can contact companies.

  • @manjunath.9900
    @manjunath.9900 3 года назад +2

    1 MV will be produced in how many days or months or year?

    • @adwitsolar
      @adwitsolar  Год назад

      4 to 5 mw in a day from 1 mw solar plant

  • @dfgdfg3061
    @dfgdfg3061 3 года назад +1

    sir odissa me solar plante betta sakte he kya ..

    • @adwitsolar
      @adwitsolar  3 года назад

      yes under KUSUM scheme of govt.

  • @erashish14
    @erashish14 Год назад

    Solution to Control Climate Change with Surplus Clean Energy before 2030, If Really Concerned ???
    Solves both (Land & Funds) issue for Solar Energy, at Same Time,
    Check 'Solar ROOF on Roads with Advertisements and Rain Water Harvesting System'
    Lightenmyways
    If U can share, ur analysis on shared concept, it'll be very helpful 🙏

  • @vivekangulwar
    @vivekangulwar 4 года назад +1

    Sir discom purchase rate mentioned in video is 4 rs . If one wants sell electricity to company how much rate can we expect from commercial industries?

    • @adwitsolar
      @adwitsolar  4 года назад +1

      Now days its is 2.5 to above depends upon the PPA.
      4 to 6.5 in commercial industries, depends upon tenure of PPA 12 to 25

    • @arbazinamdar5069
      @arbazinamdar5069 4 года назад +1

      @@adwitsolar I need a financer for solar project

  • @vamsi0909
    @vamsi0909 3 года назад +2

    *so finally how much, we can earn per month?*

    • @adwitsolar
      @adwitsolar  Год назад

      total revenue per year is 48 lakhs & 4 lakhs per month

  • @khajapatel3410
    @khajapatel3410 3 года назад +3

    Hello, I am planning for a solar power project 2-3MW, in my land of 10acres, located at Kalaburgi dist Karnataka.Nearst sub station is 7-8km from my land, is it feasible and profitable or not? Please advise & share your experience Thanks

    • @viralcartoon2487
      @viralcartoon2487 2 года назад

      Hi I am also from Kalburagi

    • @adwitsolar
      @adwitsolar  Год назад

      you can under PM KUSUM up to 2 mw, you can get details in our latest vdo PM KUSUM at our channel

  • @SureshBabu-iu8mm
    @SureshBabu-iu8mm Год назад

    Sir whats the average cost of per MW in Western and Middle countries in USD

    • @adwitsolar
      @adwitsolar  Год назад

      You can convert INR into USD approx cost

  • @yourwellwisher8905
    @yourwellwisher8905 3 года назад +1

    It means agar bade scale par lagao yani 20MW to zada fayda hai

  • @dhananjaymusale1989
    @dhananjaymusale1989 3 года назад

    1mw solar power 12/horse me banti h
    1mw 1/horse me banegi pliz bataiye sir

    • @adwitsolar
      @adwitsolar  2 года назад +1

      1 MW given you 14 to 16 lakh units per year approx.

  • @wisecounsel6135
    @wisecounsel6135 2 года назад

    Please add subtitles, this is good info but a lot of people are not understanding. Just add subtitles on this video

  • @SarojKumar-fy2pu
    @SarojKumar-fy2pu 3 года назад +2

    HOW AND WHERE DO WE APPLY FOR THE 'PPA ' SIR?????????????????/

    • @adwitsolar
      @adwitsolar  3 года назад

      you have to first participate in bid. after you won then you will eligible to sign PPA.

  • @spideyjack2900
    @spideyjack2900 3 года назад +2

    I am from maharashtra and I my father wants to setup 1mw plant and we have land also, and we don't need loan bcoz we have required money to install. can u tell me if u or ur company can setup the plant as per cost provided in the video. so I can contact u.

    • @adwitsolar
      @adwitsolar  3 года назад

      If possible please mail me at adwitsolar@gmail.com

    • @Allinone-bj9xh
      @Allinone-bj9xh 3 года назад

      Hello dear jack please mail me. I will explain everything and the company will come to you for installation and commission. Please contact through if you want nareshgaridepally236@gmail.com

    • @velispatel5204
      @velispatel5204 3 года назад

      Is it done now? I also have similar plan.

  • @mamidisainathreddy8095
    @mamidisainathreddy8095 3 года назад +2

    In 1MW solar project how many MW electricity can it produces in a year on an average.

  • @parthasarathiSahoo4
    @parthasarathiSahoo4 3 года назад +2

    Music is louder than voice

    • @adwitsolar
      @adwitsolar  3 года назад

      hmm, thanks for suggestion.

  • @ramyaranivanapala5961
    @ramyaranivanapala5961 3 года назад +2

    Hi sir iam from Andhrapradesh , prakasam district. We have 2.5 acres land In near highway, we want start this solar plant business can you share the overall cost and business details clearly

    • @adwitsolar
      @adwitsolar  3 года назад +1

      Approximate cost is shared with VDO, for details and exact cost, kindly contact an EPC vendor near to your location.

    • @Allinone-bj9xh
      @Allinone-bj9xh 3 года назад

      Hi andi meeku doubts clear chesthanu contact through mail. nareshgaridepally236@gmail.com

    • @vikramssctelugu6148
      @vikramssctelugu6148 2 года назад

      i am also from prakasham intrested in establishing 1 mw plant

  • @raghavgarg4924
    @raghavgarg4924 4 года назад +2

    I'm looking for a partner under government scheme in Mathura.
    It is a 1Mw project along with laying of 11kv transmission line for 2km. Can you share estimated cost.

    • @adwitsolar
      @adwitsolar  4 года назад

      please share your project requirement at ajeet@adwitsolar.com, adwitsolar@gmail.com or call at 7409037865

    • @bhavsinhdodiya1382
      @bhavsinhdodiya1382 3 года назад

      Contact me bro....

  • @suyashgolu
    @suyashgolu 3 года назад

    Sir agar Cyclone aya tho bachega ki nahi..m

    • @adwitsolar
      @adwitsolar  2 года назад

      its depends on, how much wind speed you consider at the time of structure design.

  • @chintubantu4312
    @chintubantu4312 4 года назад +2

    I can install an solar power plant in 5. acres how much capital will required

    • @prasannakumar.inventoreee
      @prasannakumar.inventoreee 4 года назад

      hi iam an electrical engineer and inventor . have better than this solar power plant with double the out put of existed solar power plants. it's a hybrid technology .space also half acare is enough fir one MW power plant.return on investment with in 4 years.interested persons watsup me at 9989451412.

    • @kesavans2399
      @kesavans2399 3 года назад

      Ping me 8220773663

    • @adwitsolar
      @adwitsolar  3 года назад

      3.2 to 4.8 Cr

  • @andrewlambert7246
    @andrewlambert7246 2 года назад +2

    Blady stupid to place solar plants on land that can be used for other purposes. Put on roof tops instead and over water channels to prevent ivaporation.

  • @ghanshyamkhuman1885
    @ghanshyamkhuman1885 3 года назад +1

    Sir I am from gujrat I have 30 acre land so for 1 acre how to apply for it and investment I need to arrange?

    • @alimbardai4258
      @alimbardai4258 2 года назад

      Hi ghanshyam
      I m from Gujarat
      Can we connect??

    • @adwitsolar
      @adwitsolar  Год назад

      you can watch our latest PM KUSUM vdo, where you get the details

  • @shaileshpatel6286
    @shaileshpatel6286 9 месяцев назад

    Annual production 1.5 L nahi 15 L hoga

  • @dheerajchandriki
    @dheerajchandriki 4 года назад

    Hi my self Dheeraj Kumar from India.
    I have 60 Acres of land and initially planing to set up only 1MW solar energy plant. Please let us know any funding available against it. Thank you

  • @rooplaldhakar2977
    @rooplaldhakar2977 2 года назад

    Finance model send kar sakte jai

  • @mayurkakde3744
    @mayurkakde3744 2 года назад

    I am in Maharashtra. I want to set up 1 acr solar project. Will it be 100% loan?

  • @dhananjaymusale1989
    @dhananjaymusale1989 3 года назад

    Sir rat me solar power banegi kya

  • @chiragthakur8100
    @chiragthakur8100 3 года назад +2

    Sir ,is it applicable to hilly areas of himachal . Cost per unit is 3.85

    • @adwitsolar
      @adwitsolar  3 года назад

      You can check at your state renewable energy department.

  • @rajendrapagare4948
    @rajendrapagare4948 2 года назад +1

    Sir MW me koi company kam karne vali ho to contact no. Dijiye ..2,3 kam he yha

  • @ayazshaykh6226
    @ayazshaykh6226 3 года назад +1

    Jay Bharat.
    I m looking for solar developers for my land in taluka khandal,zilla satara to give on lease or on rent for solar developers.

    • @adwitsolar
      @adwitsolar  Год назад

      you can watch our PM KUSUM vdo at our channel where we explain

  • @ravijayanthi7649
    @ravijayanthi7649 2 года назад

    Mr Ajith the presentation is very attractive. But I have a question. Rs 6 Lakhs per annum O&M and Other exp is very less. Need to give salaries also. Is this considered.

    • @adwitsolar
      @adwitsolar  2 года назад

      this is for 1 mw sir, you can also give contract to other company who can easily maintained in this price.

  • @gardeningtips3823
    @gardeningtips3823 2 года назад

    How much money can spand to school project given me Full details and contact 👍💯

    • @adwitsolar
      @adwitsolar  Год назад

      please share your enquiry adwitsolar@gmail.com

  • @happymomvment92
    @happymomvment92 2 года назад +1

    Mujhe apse bat karni hai..

  • @zaidali9248
    @zaidali9248 3 года назад +1

    MP mai abhi kya rate chal raha hai please someone tell

    • @adwitsolar
      @adwitsolar  3 года назад

      MP rate is approx 50K per kw, can i know your location

  • @prashanthsadam9048
    @prashanthsadam9048 2 года назад

    How generate 3 phase in solar system

    • @adwitsolar
      @adwitsolar  Год назад

      there is inverters in three phase

  • @amitbiradar8326
    @amitbiradar8326 3 года назад

    Do we Get subsidy from Government?

    • @adwitsolar
      @adwitsolar  3 года назад +2

      not for mw scale solar power plants, but for rooftop solar you can get.

  • @yestowels1482
    @yestowels1482 2 года назад

    Do not west agriculture land for solar plane.
    If we make solar panel height 5 feet so we can agriculture under solar panel

  • @DCLesport
    @DCLesport Год назад

    can you sell file design for me?

  • @bhojendrashende212
    @bhojendrashende212 4 года назад +2

    Thank you

  • @SunnyBalyani
    @SunnyBalyani 2 года назад

    How many subsidy in hp in 1 mw

    • @adwitsolar
      @adwitsolar  2 года назад

      In Mw PPA projects there is no subsidy.

  • @dailydoseofrandomvideos5482
    @dailydoseofrandomvideos5482 3 года назад +1

    What is 3.5cr in zar?

  • @Bishnoigroup.
    @Bishnoigroup. 4 года назад +1

    Sir
    1 mw is equal to how many kw

  • @Amjad7610
    @Amjad7610 3 года назад +1

    1 have 13 acres of land in Pune, if anyone is interested to take on lease, do reply.

  • @commonman5827
    @commonman5827 4 года назад +3

    That background music is sooo annoying 😕

  • @ra.83
    @ra.83 3 года назад +3

    Y u keep irritating disturbing background music

    • @adwitsolar
      @adwitsolar  3 года назад

      i will not include this music in our next one.

  • @LalithPuliboina
    @LalithPuliboina 6 месяцев назад

    Music is louder than your voice

  • @shrawannagda7052
    @shrawannagda7052 2 года назад

    आपकी आवाज ग्राफिक्स के अनुसार लाउड नहीं है सर

  • @ajaypal-fw6jk
    @ajaypal-fw6jk 3 года назад

    If there is 1000 unit in 1mw then how annual revenue is 60 lakh i am not satisfied from dis

    • @adwitsolar
      @adwitsolar  2 года назад

      1 Mw generates 14 to 16 lakh units per year if tariff is 4/unit that you will get revenue of 56 to 64 lakhs.

  • @laxmikantkolhe151
    @laxmikantkolhe151 3 года назад +1

    Can we sell 100% power generation electricity board

  • @shubhamkeshari5064
    @shubhamkeshari5064 2 года назад

    Bhai 500kw ka bhi bta do

    • @adwitsolar
      @adwitsolar  Год назад

      Approximately 60% of 1 MW cost

  • @shivrajvk6231
    @shivrajvk6231 3 года назад

    Dislike because background music is way to loud

  • @kunalbindal6324
    @kunalbindal6324 3 года назад +2

    tarriff rate is 2.75 rs

    • @adwitsolar
      @adwitsolar  3 года назад

      It varies state wise, It is decided by bidding process

    • @kunalbindal6324
      @kunalbindal6324 3 года назад

      @@adwitsolar i applied in Punjab and starting bid was 2.75

    • @adwitsolar
      @adwitsolar  3 года назад

      @@kunalbindal6324 Ok in punjab under KUSUM or other tender.
      In Uttar Pradesh it is 3.10 or lower to start bidding.
      it depends on state.

    • @amareeksingh2294
      @amareeksingh2294 3 года назад +1

      @@adwitsolar sir hasn't union govt. capped the max. tariff rates at 3 rs./unit ? Or is it false news!

    • @adwitsolar
      @adwitsolar  3 года назад

      @@amareeksingh2294 It is approximately same with some variations as in UP it is 3.10.
      state to state with small variation.

  • @kavitavikhe2717
    @kavitavikhe2717 3 года назад

    6 Jamai Ne Mujhe Shor plant Le Vizag

  • @sde-ehazaribaghkachhap.951
    @sde-ehazaribaghkachhap.951 Год назад

    Non-sense distracting background music

  • @snoopy78724
    @snoopy78724 3 года назад +1

    Is he speaking English?

  • @RAHULSINGH-ig9iu
    @RAHULSINGH-ig9iu 3 года назад +1

    You have not subtracted the govt subsidy

    • @adwitsolar
      @adwitsolar  3 года назад +1

      In MW scale power plants no any subsidy (Until a pilot project)

  • @erastusmuhia224
    @erastusmuhia224 2 года назад

    Why put tue title in
    English then change to another language ?
    Misleading..

  • @afconw6197
    @afconw6197 2 года назад

    sir,Kindly share Consultant no.

  • @sporonline7962
    @sporonline7962 2 года назад

    Please English next time.

  • @DEVARAMAKSHAYAREDDY
    @DEVARAMAKSHAYAREDDY 2 года назад

    No proper sound

  • @mundururakshat
    @mundururakshat 3 года назад +1

    Sir I liked ur video . Very interesting sir could I have ur nbr.

  • @mr.serpent6909
    @mr.serpent6909 2 года назад

    utterly annoying soundeffect ruined the video

    • @adwitsolar
      @adwitsolar  Год назад

      Understand & will not in next videos

  • @mohammedmuzammil5894
    @mohammedmuzammil5894 4 месяца назад

    Sir contact number