Section 4 CEC: Ladder tray deration & misc conductor deration

Поделиться
HTML-код
  • Опубликовано: 27 дек 2024

Комментарии • 6

  • @abouzarfallah7012
    @abouzarfallah7012 8 месяцев назад

    In minutes 6:50 I believe that as 3 conductor cable space is 110% then it is not needed to multiply it's ampacity by T5D.( actually 110% is enough space to pass the air and make the multiconductor cable cool)
    Respectively for other 3 single conductors we should consider 3 conductors and then look at T5D fourth column which is 0.87

    • @Red_Seal_Electricin
      @Red_Seal_Electricin  8 месяцев назад

      Thanks for the comment. I totally agree with you, this appears to have been an oversight. Thanks for letting me know!

  • @fengyuhe2953
    @fengyuhe2953 2 месяца назад

    At 8:04 the T5C don’t have a factor of 0.84. I think it should be 0.8

  • @electricianinontariocanada1775
    @electricianinontariocanada1775 5 месяцев назад

    What is the maximum distance that multi-conductor cables can be run in contact

    • @Red_Seal_Electricin
      @Red_Seal_Electricin  5 месяцев назад +1

      Good question. 4-004(13) states a maximum of 600mm that multiple multiconductor cables can be in contact before deration must be applied from T5C.

    • @electricianinontariocanada1775
      @electricianinontariocanada1775 5 месяцев назад

      @@Red_Seal_Electricin thank you
      Do you have any videos about that?