Hydraulic Performance Test of Drainage Channels

Поделиться
HTML-код
  • Опубликовано: 20 май 2019
  • In the Hydraulic Test Centre in Karlsruhe a test between channels without versus channels with built-in fall was done. See the result now.
    Without build-in fall:
    -4 meters of RECYFIX 150 Type 01
    -Water surcharge: 12-13 l/sec
    -1:17 minutes till the channel is emptied completely
    With 0.5% built-in fall:
    -4 meters of RECYFIX 150 Type 01
    -Water surcharge: 12-13 l/sec
    -1:13 minutes till the channel is emptied completely
    Result: Almost same hydraulic performance.
    Have fun with this video!
    ▬ About this channel ▬▬▬▬▬▬▬▬▬▬▬▬▬▬
    💦 Discover the world of HAURATON drainage 💦
    Experience drainage "to go" with HAURATON. We have been internationally successful as a specialist for surface drainage for over 60 years. With our extensive range of products for linear drainage and point drainage, rainwater treatment and infiltration, we are a reliable partner to the construction industry. Products such as our RECYFIX drainage channels have already been used all over the world.
    ►Website: www.hauraton.eu
    ▬ Social Media ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
    ►Facebook: bit.ly/2MuRNou
    ►Twitter: bit.ly/2wdoZWA
    ►LinkedIn: bit.ly/2MHHXz2
    ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
    #hauraton #hydraulic #drainage

Комментарии •