What is a On grid / Grid tie solar system and how it works? | Net metering procedure in Pakistan
HTML-код
- Опубликовано: 8 сен 2024
- What is a On grid / Grid tie solar system and how it works? | Net metering procedure in Pakistan
Here is the complete detailed tutorial about a grid tied or on grid solar system operation in which I practically explained how we harnessing the power of the sun to generate electricity.
Highlights of the video :
Introduction to Grid-Tied Solar Systems: Discover the basic concept of grid tied solar systems and how they differ from off grid setups.
Solar Panels and Sunlight Conversion: Uncover the science behind photovoltaic panels and how they transform sunlight into usable electricity.
Inverter Technology: Explore the crucial role of inverters in converting direct current (DC) generated by solar panels into alternating current (AC) compatible with household appliances and the grid.
Net Metering Explained: Learn about the ingenious net metering concept allowing you to not only consume solar energy but also send excess power back to the grid potentially earning credits.
and explained all procedure like net metering vernation license ( net metering approval from disco's)
IESCO,FESCO,QESCO,MEPCO,PESCO,HESCO or K electric etc.
Grid Interaction: Understand the interaction between your solar system and the grid. Learn how your home draws electricity from the grid when your solar production is low and how it feeds excess energy back during sunny days.
Monitoring and Smart Systems: Discover how advanced monitoring tools and smart technologies enable you to track your systems performance energy production and even control it remotely by solarman smart app.
Benefits and Environmental Impact: Explore the numerous advantages of grid-tied solar systems including reduced energy bills lower carbon footprint, and contributing to a sustainable future.
Considerations and Installation: Get insights into important factors to consider when planning a grid-tied solar installation, such as system size, location, permits, and potential challenges.
#SolarPower #RenewableEnergy #OnGridSolar #SolarPanelSystem #GridTieSystem #netmetering
#howongridsolarworks #whatisnetmetering #netmeteringinpakistan #fuelprice adjustments
*Contact us For Booking/Event Invitations/Sponsors your Products/Business Inquiries**
WhatsApp Only : 923116745016
email : ajelectric.wah@gmail.com
My other useful videos links :
8KW Solar system installation in Azad Kashmir with Inverex Nitrox and Longi Solar Panels
• 8KW Solar system insta...
12KW Hybrid solar system installation with Automatic solar panels washing system | Nitrox 12KW
• 12KW Hybrid solar syst...
6KVA Solar system installation procedure with Fronus Matrix 2.0 Solar inverter and JA 545W
• 6KVA Solar system inst...
Solar system accidents due to wrong installation techniques | Solar system service and maintenance
• Solar system accidents...
How to crimp MC4 solar connector in Urdu/Hindi | MC4 crimping tool kit | Solar PV
• How to crimp MC4 solar...
5KW Solar system complete installation guide with Longi solar panels and Solarmax inverter
• 5KW Solar system compl...
3KW Solar system installation guide with One X VM3 Solar Inverter | system cost
• 3KW Solar system insta...
3.2 KW Solar system complete installation guide | Aerox 3.2 KW inverter | system cost • 3.2 KW Solar system co...
Solar system frauds and scams in Pakistan | 5KW solar system improvement | Axpert 5.2KW
• Solar system frauds an...
5 KW Solar system complete information in Urdu/Hindi | Tesla solar inverter • 5 KW Solar system comp...
Solar Tube well system with 3hp water pump 1.5 inch water delivery | invt vfd inverter • Solar Tube well system...
Solar system fault detection and step by step troubleshooting method | Solar system faults
• Solar system fault det...
Solar inverter complete setting in urdu | Inverex | Tesla | One X | Max Power
• Solar inverter complet...
For more Interesting Technical Videos Please Subscribe This Channel :)
Subscription Link: www.youtube.co....
Also here you will find a variety of videos about Engineering and Technology Including Tech reviews, unboxing, specially electric and electronic circuit’s tutorials in Urdu / Hindi.
My motive behind to create this channel to spread the knowledge about advance and easy technologies around the world.
And I want each and every individual whoever is interested in technology to be able to understand it in the easiest possible way. It’s all here on AJ Electric. #ajelectric
Make sure to subscribe my channel and press that bell icon for latest notifications so never miss any video.
Thanks for your Support and Visiting :)
Facebook : / aj-electric-1083315874...
WhatsApp : 923116745016
Had a great experience with Aamir Bhai. This was installed at my place. I would highly recommend him. 😊
Mohlanwal k qareeb rehty ho ap
Kindly share contact number of AJ
Hello hijde
Shop location amirr bhai ki
بہت آسانی و عمدگی سے وڈیو بنائی الفاظ کے چناؤ سے لے کر ہر چیز سمجھ میں آ گئی جزاکم اللہ
Very Informative , Thanks. But please disclose rate , part of the video 15:19 where you've mentioned total expense was trimmed
Thank you very much brother……..
This has to be the best non confusing video. Thank you.
Ye hamara installed kiya hai kohistan enclave may Amir ne jo best kaam kiya hai yahi mashwara hai sabko jb b lagwaye to aisay he well experienced engineer se lagwaye highly recommended
Jazak Allah khair……..
Very igood nformative video
Mashallah Allah apki Umar may barakt dalay..amir bro
Great plan thanks for information
Good
EXCELLENT INFORMATION
Very very informative video….
The exported units money can be claimed , by writing an application to XEN of respective electric company
Good informative video. There is slight correction. On Grid system, all power doesnt export to grid. Firstly power consumed by your home load and then extra power/units exported to WAPDA.
Sit is that true ? Can u explain more about that ?
I am confused about it what's the calculation.
Dear amir bahia plz make a video on inverex 6 kva nitrox settings. Thank you
Very well explained
Very informative video bro highly appreciative
Amir bhai the Great ❤
Thank you sir 6:24
well explained
Good work bro
Very informative video ❤
Very good dear brother ❤
Nice video
Excilant jazak allah khair
Great information brother
Very informative
Masha Allah great explanation
Im ur big fan sir ❤
Nice
Amir bhai . great video🎉❤
السلام علیکم عامر بھائی اپ ماشاءاللہ بہت اچھے طریقے سے سمجھاتے ہیں
B3 کنکشن کے بل کی کیلکولیشن کیسے کی جاتی ہے
Well done ✅❤❤
If after 3 months we have credit units
will wapda pay us money or cheque for the extra units which we have produced.
وعلیکم السلام
جزاكَ اللّٰه
If I understood you correctly, the On Grid system is only used for selling electricity to wapda. It cannot be used for household loads. Am I right?
No, it can be hybrid depending on type of inverter selected, like my system consist on SOLARMAX ONYX 5kw inverter and 7kw pv modules, after consumption of power during day time, extra power feeded to LESCO.
@@nasim9527how to transform on grid system to hybrud? Change of inverter or ?
To be more specific..even you have on grid system morning time u consume directly form solar with out battery .....and extra move to grid .....
First load then wapda in on-grid system. In hybrid-system first load, battery then wapda normally and you can change the sequence according to your need.
@@cricketcraze7786are you sure ? Because a lot of people claim that On Grid inverters only export units through bidirectional / green meter. They do not run load during day time and export the remaining units
Basically, in on grid system you use wapda all the time and units exported / imported calculation is done at the end of the month for adjustment in bill
7 marla house mein single phase meter to dp konsi wire use krni chahaye? 7/36 or 7/44?
السلام علیکم عامر بھائی اپ بہت اچھی ویڈیو بناتے ہیں اور اپ کی ویڈیو میں سے بہت کچھ سیکھنے کو بھی ملتا ہے میں بی الیکٹریشن کا کام کرتا ہوں اپ کا موبائل نمبر چاہیے میں اوکاڑا سے ہوں
wow so nice.thanks
Sir agar wapda chli jaye or hum inverter ka input breaker bnd kr dein tu ye off grid mode pr chl jaye ga agar ye (without battery) wali feature ky sath hy
Can I use my old UPS on grid system ?
شکریہ سر
Sar good thanks
Kia longi glass k ander wala bar code sticker change hota hy???china/pakistan mn asa possible hy.
Mere pass purana ups hai homage ka 24v. Is main built in charge controller hai 1200 watt tak.
Main is k sath 2 plates lagana chahta hn 550 ya 575 watts.
Main 550 k panel ko kis tarha is inverter k sath attach kr sakta hn ?
Kiu k inverter ki 55vdc value hai.
Net metering END Game
What will be the connection scheme for single phase grid output solar inverters ? How it will be tied with 3 phase meter ?
Green meter has so many wire connections. Hope you will explain in any other video
Mashaallah Bhai
Nice informative video Amir bhai... But aap ki video ka audio balance level theek nah hy... aik speaker mei awaz aa rahi hy. But anywayz... thanks for helpful info.
Nice vdo
Solar pannels say inverter k drmayan power switch konsa use kia jaye..??? Jis say power loss na ho..
Sir ager hum karache me he awer ongride system peshawer me lagaya hoga to hum apnay deyin huwin unit karache me use kar saktay hn?
price for 10kw complete iinstalation includinggreen meter
السلام علیکم جناب!
کیا لال پمپ (2HP کی موٹر) کو 3kw کا پیرو سائین ویو انورٹر چلا سکتا ہے؟
If On grid system ghr ka load ni support kr raha then *29 * green meter number Dhoop me 00 ku show kr raha ? So it means k jab solar achi dhoop me work kr raha ha to phir wo ghr ko bi support kr raha.
Green meter apply kernay k kitni dair baad lagta hai?
❤
Sir solar system bhi laga howa ha or phir bhi bill bohot ziyada araha ha major kiya problem hosakti ha
Apki battery ki setting kharab hoge.
- Battery ko 0S0 krtay.. Matlab k battery sirf solar say charge ho. Wapda say charge na ho.
- Agar green meter hai to din k time Ac istemal na kro aur meter reverse kro aur raat ko bijli km instemal kro.
Aoa sir battery breaker lgane ka koi benefit ya koi nuqsan hota ha?
16.53 Rs price h ya 19 Rs. Per unit?
Please confirm, during day time does it feed house as well or only feed Grid?
IF solar is producing
4,500watts ( 12 panel 550w ) during peak sunlight
House load is 2200 watts with 1 ac working.
Then remaing 2300 watts with go to wapda.
IF 2,000 watts go to wapda for 1 house then it is = 2 unit
Waliakumasalam
Waqai Disco hain ye department
No fee but in Lahore you r asked to pay above one lakh...
Sir,hybred inverter k sat green meter lgaskte he?
Sir which solar company offer N type technology solar in Pakistan and tell me the model name in 545w solar panel .
Jinko tiger series
Mujhe ye samajh ni arhi.. ON GRID mein inverter apk ghar bijli deta hai pehle? Or phir Remaining GRID mei bhejta hai? Ya phir Seedha Grid mein bhejta hai? Or hm hr waqt wapda se lete hain.. din mein b..?
pehly ghar mn use hti hy jo bach jati hy wo grid mn jati hu
عامر بھائی بہت مہربانی اپ نے اچھی ویڈیو بنائی ہے پاکستان کے ہر ادارے میں عوام کی سہولت کے لیے کوئی اسانی والا کام نہیں عوام کو 70 روپے پر یونٹ بھیج دو وہی یونٹ اگر عوام اپنے پیسے خرچ کر کے واپڈا کی بجلی کی کمی کو پورا کرنے کے لیے واپس وابڈا کو دے دے تو وہی پھر 20 روپے کایونٹ ہوگا ہر طرف سے وہ عوام کو لوٹا جاتا ہے
اسلام علیکم
عامر بھائی 6کلو واٹ میں گرین میٹر کا کتنا خرچہ ہے
سولر سسٹم پہلے سے انسٹال ہے۔ سنگل فیز میٹر بھی لگا ہوا ہے
ڈیڑھ لاکھ
Maash Allah,
1-Is this solar system is 12volt or regular system, which provided 220volt?
2- Can net metering works with a 12 volt solar system?
how three phase wapa is connected to converter
Sir g ,agar on grid k sth ,for example 6kva ka hybrid system lgana ho to uski wiring diagram kia ho gi?
Ghr k load ko 2 hisson mein devide krna pra gy I means adha load to on grid means wapda py ho, single phase use kr k ga aur adha 6kva hybrid py ,jb liye jae gi on grid off ho jae ga ,aur 6 ya 8 panals Jo hm deside krain wo atc switch k zrye hybrid k sth connect ho jae gain aur wo load Jo hybrid py ho ga wo chlta rhy ga??
Esy hi ho ga ,🙄
جناب میں بھی آپ کا سبسکرائبر ہون۔ میرے سوال کا جواب بھی دے دیں۔
السلام علیکم جناب!
کیا لال پمپ (2HP کی موٹر) کو 3kw کا پیرو سائین ویو انورٹر چلا سکتا ہے؟
ماشاءاللہ بہت خوب عامر بھائی۔
کیا میں آپ کی ویڈیو کا کچھ حصہ عوامی معلومات کیلئے استعمال کر سکتا ہوں۔ دعا گو راشد ملک
23 kv System Price Batana Bhai
Sir please help me. Fully hybrid inverter 3 to4 kw mai kon sy hai jo real-time sharing krty hai
10kv ya 5kv Hybird system without batteries chal jaey ga
How many average units are produced by 6KW solar system?
30
Total production and reverse metering.
Reverse metering
=================
- If you are not using ac. You can get 20 unit export on green meter. I got max 24 in islamabad.
- if you use AC then 10 unit on green meter.
Overall Production
==================
- Avg Max 30 units.
• Unit production depends on weather, location. In KPK more electricity will be produced.
• Panels you are using .
- 550watt x 12 panel = 6,600 would produce. 4000- 5000watts electricity. in some condition above 5k.
- Inverex Nitrox inverter MAx pv support is 7,800 . output 6,000 watts
-- 575 * 12 = 6,900
-- 550 * 14 = 7,700
- Solarmax onyx support = 9,000 output 6,000 watts
--- 550 * 16panels = 8,800
--- 575 * 14 panels = 8,050
70% efficient is 550*0.70 ==> 385
75% efficient is 550*0.75 ==> 412
I recommend buying a better ip65 inverter such as solarmax onyx or nitrox with 14 solar panels. I have 12 panels in my home. I was only able to reverse 6 unit in a single day because i was using 1 ac. With 14 panels you can give more units to green meter.
Brother kitnay units k badlay wapda kitnay units day rahi?
Sir apne bola k ye load nahi chalata ye ongrid inverter to mobile main home ka icon bana howa ta or load bhi chal raha taa home ki icon pr
Or iske oper battery ka icon bana howa taa to main toda confuse howa ap kindly confusion door kar sakte hain
sir g ma ny ap sy pocha tha k 400kw on grid solar systam kasy kam krat h
or ky is k sat power factar lagata h ?or green metar ma pf kon sy namber pr hota h plz zaroo batay
Sir meray pas 150 watts ki teen plates hn. Kia mn simtek inverter laga sakta hn 60 A wal
how to connect single phase inverter with three phase meter (green meter)
4.5kw 6500wat k sath green meter lag Sakta ?
I tried calling Mr. Aamir several times and left email aswell. But never got any reply back. Sadly a customer lost by him.
Aamir bhai was busy making video.
Same problem
Akhir mujhy kisi our say 3 On Grid systems install krwna phry
Amir bahi good information 10kilo watt system ma on grade syestem ma single phase pe run ho ga sirf din ko baad ma three phase LT ai to green meter laga ley?
Website per Single phase inverter max 8kva tak dekha hai mene.
کم از کم کتنے کلو واٹ کے سسٹم میں گرین میٹر لگایا جاتا ہے ۔
اچھا سوال ہے! عامر بھائی کو جواب دینا چاہیے ہے
Bhi phone kon sa h jis pay apne app dekhai h.
Agar panel 15 kw hon inverter 10 kw wala chalay ga
bhai main soler system lagwana hai to ap kuch detail de sakte k mera kitne main lag jaye ga aur ap laga dein gye
A J electric kia yeh Sach hai keh government tho green meters ko hatam kary ki chakar mai hai?
Mcb 9 timer keeping batain
Plz
Salam dear, aaj ka date na kya price hoga
Pasia kitny btyein ap na?
Amir bhai electric meter main time kese chek karte hain
Peak hours chek karne k liye
Green meter me 4 5 6 7 reding hai. 4 5 non peak 6 7 peak
Assalamu alaikum sar Jo bijali solar panel banayenge wapas kaise jayegi grid station may vahan to already electric supply on hoti hai rahnumai ki jaiega shukriya
Ye is inverter device ka he kmal hai k merg karta hai jis tara bijli anay k liye meter hai is tra bjli wapis janay k liye b meter hai
Bhai AJ tu caretaker Govt ne grid tie ka b janaja Nikal deya. Kindly share their todays statment
Aamir bhai net metering me hybrid net metering system bhi hota hy?? Mera mtlab hy kh kia aisa momkin hy kh load shedding k dowran battery se backup bhi lya jay?? Ya uskay lye alag se UPS ya koi dusra inverter lagana paray ga?
Aik time per max 2 source chaltay hain
- Solar aur battery. ( SBU) during day
- Solar aur wapda. ( SUB) during day
- wapda on night ( SUB )
- Battery only. ( load shedding k doran )
Agar wapda bnd ho to. Meter reverse nahe chalta. Ghar automatically solar aur battery per chalta hai
@@rohaitastanoli3414 net metering yaa on grid system me bhi aisa hi hota hy?
@@AmirKhanAnadil
Inverter hybrid hoTa hai.
6 aur 8 Kv me single phase inverter hain. Jo normal meter per lgjatay hain. Normal meter per bijli sell nahe kr sakhtay.
- By default Inverter utni he bijli deta hai jitni ghar ko zarorat ho. Agar solar 4000 watt bnarahe hai laken inverter 1000 watt he istemall kray ga jitni ghar ki zarorat ho . baki 3,000 watt zaya. Ya dosra agar battery lgi hui ho sath to solar say battery be charge kr sakhtain hain.
- Agar green meter lg jai. To inverter ko max setting per kr k net metering on kr dete hain. agar 4,000watts bnrahe hain aur ghar me 1,000watts istemal horahe hain. Baki wapda ki cable say meter be sell/export hojatain hain. ( agar 3,000watts 1 hours tk export hon to 3 units bntay hain ).
- Din k time agar load sheeding hojai. To solar aur battery say ghar chalta hai. Agar raat k time ho to solar raat ko bijli nahe bnata. Battery per ghar chalta hai.
- Agar battery nahe hai to phir kya hoga?
- Din k time, agar load shedding hoti hai. To inverter bar bar restart hota. Us ka solution yeh hai k us per ahista ahista load dalain. Fridge aur ac bnd kr k. Sirf lights aur fans ka load dalain. jb 5 6 seconds chal jai to fridge on kr de. Hmaray ghar me sasta wala fronus pv7200 lga hai. Battery ka breaker kharab tha. To inverter bar bar restart ho on he nahe hota tha. Hmaray ghar me 2 load hain. Aik full ghar ka aur aik UPS wali purani wiring thi jis per light aur pankhay thay. To me yehi kaam krta hai. Ups per load 300watts k aas pass hota tha. To inverter on hojata hai. Aur phir 5-6 second bad full ghar ka load on krta tha. Albata Ac be phir bad me chaljata hai laken zara see doop km hoge to bnd restart bar bar. To behtr yehi hai k fans aur light per he guzara kiya jai. Agar battery hai to koi masla nahe.
Inverter Inverex ka nitrox ya solarmax ka onyx bethr hai. hmara sasta wala fronus pv7200 hai. Heating issue hai bar bar saaf krna parhta. Jb overtemperature hojata hai to wapda ka breaker bnd krtay phir ja kr restart hota. Behtr option yehi hai ip65 inverter lo. aur un per 12 ki bjai 14 panel lga lo.
Mere khiyal say jo 3 phase inverter hota hai shayed wo normal meter per nahe chalta. 6 aur 8kva me single phase inverter ata hai.
6 kva ka kharcha 16-17 lacs hai Premium wala Hybrid. Aur 12-13 lac me be lgjata hai. Laken sastay inverter Aur battery k sath. jo hmaray hai.
- Agar green meter ap k area me lg sakhta hai to. 14 panels lgao 6kva me solarmax onyx lelo wo 9,000 pv support krta hai.
- 12 * 550 = 6,600 watts
- 14 * 550 = 7,700 watts
- 16 * 550 = 8,800 watts
- 12 * 575 = 6,900 watts PV
- 14 * 575 = 8,050 watts Jo meri nazar me bethar rahe ga.
Ouput 6,000watts ki hoti hai. solar efficiency 70%-80% normal hoti
8,050 * 0.70 = 5,635
6,900 * 0.70 = 4,830 watts
Max output 6,000 hoti hai 6kva ki. Invertex nitrox max PV 7,800 support krta hai aur output 6,000. Inverter k hisab say solar panel lagwao. 575watts walay himo 6 lgwalo.
Mcb per b video banain
Sir 60v 20a ke scooter me 60v 30a ya 40a ka battry use karsaktehe sir ya system jhal jahega😅😅😅😅