Retrip= Trip repeat to self Breaker. It's a second try to open breaker. Back trip= Trip to all breker in the fault Zone if Retrip doesn't opens faulty breaker.
Thank you for watching this session. The video session on the concepts of LBB Operation in case of One and Half CB Scheme will be published at 19:00Hrs on 06.10.2021 (Wednesday). Stay tuned.
Good effort
It is great effort for sharing of such nice presentation.
Pls help to share knowledge on SAS WinCC, PAS/Siemens interface
First viewer
Plcc k liye video bnaiye plus about its maintenance and plcc level checking values for line
Sir please make video on CB control circuit. Pre and post close supervision. Trip circuit supervision ckt. Troubleshooting
Thank you for your suggestions. I will upload video on these topics shortly. Stay tuned for more updates.
Kindly make lectures on Generator protection
Sir I liked your video very much.... Busbar protection aur relay coordination pe please video banaye...
Thank You for watching.
Bus bar protection par jaldi hi aayega video.
Retrip= Trip repeat to self Breaker. It's a second try to open breaker.
Back trip= Trip to all breker in the fault Zone if Retrip doesn't opens faulty breaker.
Explain about close block.
Thank you so much sir for the great effort!
Thank you for your feedback.
If Half dia ho to LBB protection kaise work karega please explain
Iss ke part-2 me explain Kiya hua hai. Playlist me dekhiye detailed explanation available hai iska.
Please make a video on 61850 scada part
I will upload 61850 video shortly.... But before that Siemens BCU configuration (all steps) will be uploaded from this Saturday onwards.
@@LIGHTNINGMINDS_PANKAJKUMARJHA Make a separate video on scada configuration
If main open tie not open and vice versa
Take the case of one and half and explain
Thank you for watching this session. The video session on the concepts of LBB Operation in case of One and Half CB Scheme will be published at 19:00Hrs on 06.10.2021 (Wednesday).
Stay tuned.