E/One Grinder Pumps: How to Retrofit a Motor Controller Board into a 230V/240V 60Hz Pump

Поделиться
HTML-код
  • Опубликовано: 22 июн 2024
  • E/One replaced the control bracket with a motor controller board in September 2020. This video shows how to retrofit a 230V/240V 60Hz pump.
  • НаукаНаука

Комментарии • 3

  • @larryferguson1314
    @larryferguson1314 3 года назад

    What are the electrical readings supposed to be? testing the wires before you run to make sure all connections are correct, and tight. There has to be factory specs for ohm checks, and Meggs.

    • @EONESewerSystems
      @EONESewerSystems  3 года назад

      Hi Larry - please email me at eone@eone.com so I can send you the service manual.

  • @ralphsalvatore8761
    @ralphsalvatore8761 2 года назад

    what is the cost