Superb capture of Maharaja Generator Van coach with some HPCV freighter coaches at Savanur. Really superb scene and beautiful tree abundant line now spoiled with wires and too many criss crosses. thanks sir
Before starting the VB on this route IR should start a shatabdi express on this route to see the occupancy as traveller on this route will opt for costly VB tickets or not .
From Mar 23 VB should start Fro Dharwar as it is announced by Railway Minister in front Dharwar MP Pralad Joshi It is only 45 KM pending for electrification & doubling IR can do 12 KM per day on track laying & electrification which will be done for Sure by Feb end
Swr is also give much better facilities for normal express or passenger trains still many trains are restored particularly cmnr- Mysore, Mysore-bangalore.
As I saw there was many places where electrification wasn't done yet Even in ur video too I think by end of March the work wl be done and can expect operation atleast by April Just my opinion
If doubling not completed by March, Electrification shld be completed.. also curious to know the departure timings from Bengaluru!! looking at the present infrastructure of PFs!!
Considering feasibility I think it is better to start Kalaburgi Bengaluru Vandebharat express. The distance is about 560 k. At present the fastest train takes 9 hours. There are about 30 sleeper busses charging exorbitant fare. Two flights run full.It is very difficult to get confirmed tickets. Railways should open their eyes.
The gatiman speeds above 160..shatabdi at 130..rajathani 150..it's better to have normal trains with reduce the travel time..Chennai Banglore Vande Bharat is a utter failure now..since we have 4 trains starting in less than 2 hours from Chennai..Banglore Chennai mail is the fastest in our route..not sure how long the railways gonna fool the people..
.
Part 1 : ruclips.net/video/UVwAARYL1rA/видео.html
Byadgi - Haveri Doubling & Electrification Progress
.
Looking at the current scenario, I think VB will start running from Sbc to Dwr by July / August 2023. March or April is highly unlikely.
Superb capture of Maharaja Generator Van coach with some HPCV freighter coaches at Savanur. Really superb scene and beautiful tree abundant line now spoiled with wires and too many criss crosses. thanks sir
Welcome :)
Before starting the VB on this route IR should start a shatabdi express on this route to see the occupancy as traveller on this route will opt for costly VB tickets or not .
Looking at the amount of civil work/track laying/Electrification still pending , it is highly unlikely that Railways can meet March 2023 deadline.
Since all VB is a premium train sets and expensive ride. I think Inter-city Super fast on Wap-7/5 will be best to introduce
Thank you thank you so very much sir for uploading sir
Welcome :)
Nimma video mahiti gagi dhanyavad
Welcome :)
Sonsi Kundagol Have Make Dubble Track and Electrification to hubbli junction could Make complitly in May and july 2023
Fantastic video thank-you bro 👍
Welcome 👍
From Mar 23 VB should start Fro Dharwar as it is announced by Railway Minister in front Dharwar MP Pralad Joshi
It is only 45 KM pending for electrification & doubling
IR can do 12 KM per day on track laying & electrification which will be done for Sure by Feb end
a lot of electrification is still pending as seen in Part 1 also.
and
No signs of TSS in this section.
.
@@SingleTraveller
By Jan 23 Haveri should be under wire
By Feb 23 Hubballi South should be under wire
At what distance TSS are planned ???
hope so in future 🤔😇
ok
no idea about TSS in this section.
one TSS is being built at Birur which you can see in this video : ruclips.net/video/EF4_q3SwAbw/видео.html
.
Swr is also give much better facilities for normal express or passenger trains still many trains are restored particularly cmnr- Mysore, Mysore-bangalore.
As I saw there was many places where electrification wasn't done yet
Even in ur video too
I think by end of March the work wl be done and can expect operation atleast by April
Just my opinion
If doubling not completed by March, Electrification shld be completed.. also curious to know the departure timings from Bengaluru!! looking at the present infrastructure of PFs!!
Before JS, maybe 5:45 am.
U said about golgumbaz bipass but important train Karnataka sampark Kranti express one of the long distance train
yes they should develop Hubballi South and bypass many trains to save time.
Considering feasibility I think it is better to start Kalaburgi Bengaluru Vandebharat express. The distance is about 560 k. At present the fastest train takes 9 hours. There are about 30 sleeper busses charging exorbitant fare. Two flights run full.It is very difficult to get confirmed tickets. Railways should open their eyes.
Kalburgi Not possible as it depends upon the population ratio
Yes it is Maharaja Exp EOG, Little shed is for Providing shelter to RUB ( Protection from Rain & sun
Thanks for the info :)
🎉🎉🎉
What is the latest with regards to the status of doubling and electrification of the entire section....is the end anywhere in sight...??
No idea.
Thank you sir ☺️
Welcome :)
Bro is this recent video or a older one.
Because I heard that the work is completed in Saunshi & Kundagol.
Dec Last week on my way to inaugural : ruclips.net/video/P7EcylDZFMA/видео.html
.
No, Saunshi to Kundgol , at one place curve has been realigned that's all.
doubling is pending.
Need to Kolhapur miraj belgaum hubali bengalore vande bharat train....its very nice route
The gatiman speeds above 160..shatabdi at 130..rajathani 150..it's better to have normal trains with reduce the travel time..Chennai Banglore Vande Bharat is a utter failure now..since we have 4 trains starting in less than 2 hours from Chennai..Banglore Chennai mail is the fastest in our route..not sure how long the railways gonna fool the people..
by this year 2023 vande Bharat express will run betn dharwad to Bengaluru 🤗🤐
Ruled out March. VB will run only end of the year 2023
Nov-dec 2023 beglavi/ dharwad - KSR benguluru vande Bharat chances 90%
Bengaluru to karwar vande bharat express
Highly unlikely
It's March end but still no updates🥲
No, it's doesn't look like VB will start in March ....