What do you Think ? Dharwad - Bengaluru Vande Bharat Express. Will it start from March ? Hubballi

Поделиться
HTML-код
  • Опубликовано: 13 янв 2025

Комментарии • 46

  • @SingleTraveller
    @SingleTraveller  2 года назад +2

    .
    Part 1 : ruclips.net/video/UVwAARYL1rA/видео.html
    Byadgi - Haveri Doubling & Electrification Progress
    .

  • @ledcyt6906
    @ledcyt6906 2 года назад +11

    Looking at the current scenario, I think VB will start running from Sbc to Dwr by July / August 2023. March or April is highly unlikely.

  • @r.a.j.a.n.r.g1212
    @r.a.j.a.n.r.g1212 17 дней назад +1

    Superb capture of Maharaja Generator Van coach with some HPCV freighter coaches at Savanur. Really superb scene and beautiful tree abundant line now spoiled with wires and too many criss crosses. thanks sir

  • @raghuveersinghmangaliya3242
    @raghuveersinghmangaliya3242 2 года назад +5

    Before starting the VB on this route IR should start a shatabdi express on this route to see the occupancy as traveller on this route will opt for costly VB tickets or not .

  • @manjunathg17
    @manjunathg17 2 года назад +6

    Looking at the amount of civil work/track laying/Electrification still pending , it is highly unlikely that Railways can meet March 2023 deadline.

  • @joyaltroz1446
    @joyaltroz1446 2 года назад +3

    Since all VB is a premium train sets and expensive ride. I think Inter-city Super fast on Wap-7/5 will be best to introduce

  • @lakshmivkulkarni6936
    @lakshmivkulkarni6936 2 года назад +1

    Thank you thank you so very much sir for uploading sir

  • @dwarakanathtr380
    @dwarakanathtr380 2 года назад +1

    Nimma video mahiti gagi dhanyavad

  • @Appu-r
    @Appu-r Год назад +2

    Sonsi Kundagol Have Make Dubble Track and Electrification to hubbli junction could Make complitly in May and july 2023

  • @सत्यहरिश्चंद्र

    Fantastic video thank-you bro 👍

  • @mohangohar7340
    @mohangohar7340 2 года назад +2

    From Mar 23 VB should start Fro Dharwar as it is announced by Railway Minister in front Dharwar MP Pralad Joshi
    It is only 45 KM pending for electrification & doubling
    IR can do 12 KM per day on track laying & electrification which will be done for Sure by Feb end

    • @SingleTraveller
      @SingleTraveller  2 года назад

      a lot of electrification is still pending as seen in Part 1 also.
      and
      No signs of TSS in this section.
      .

    • @mohangohar7340
      @mohangohar7340 2 года назад

      @@SingleTraveller
      By Jan 23 Haveri should be under wire
      By Feb 23 Hubballi South should be under wire
      At what distance TSS are planned ???

    • @500chethan
      @500chethan 2 года назад

      hope so in future 🤔😇

    • @SingleTraveller
      @SingleTraveller  2 года назад +1

      ok
      no idea about TSS in this section.
      one TSS is being built at Birur which you can see in this video : ruclips.net/video/EF4_q3SwAbw/видео.html
      .

  • @madhukeshwara3931
    @madhukeshwara3931 2 года назад +1

    Swr is also give much better facilities for normal express or passenger trains still many trains are restored particularly cmnr- Mysore, Mysore-bangalore.

  • @Sabyasachi11
    @Sabyasachi11 2 года назад +2

    As I saw there was many places where electrification wasn't done yet
    Even in ur video too
    I think by end of March the work wl be done and can expect operation atleast by April
    Just my opinion

  • @madhavavb3973
    @madhavavb3973 2 года назад +2

    If doubling not completed by March, Electrification shld be completed.. also curious to know the departure timings from Bengaluru!! looking at the present infrastructure of PFs!!

  • @guruprasad4284
    @guruprasad4284 2 года назад +2

    U said about golgumbaz bipass but important train Karnataka sampark Kranti express one of the long distance train

    • @SingleTraveller
      @SingleTraveller  2 года назад

      yes they should develop Hubballi South and bypass many trains to save time.

  • @gopinathrao1550
    @gopinathrao1550 2 года назад +2

    Considering feasibility I think it is better to start Kalaburgi Bengaluru Vandebharat express. The distance is about 560 k. At present the fastest train takes 9 hours. There are about 30 sleeper busses charging exorbitant fare. Two flights run full.It is very difficult to get confirmed tickets. Railways should open their eyes.

  • @MyWayRailway
    @MyWayRailway 2 года назад +1

    Yes it is Maharaja Exp EOG, Little shed is for Providing shelter to RUB ( Protection from Rain & sun

  • @venkateshe232
    @venkateshe232 Год назад +1

    🎉🎉🎉

  • @ravishankars1420
    @ravishankars1420 Год назад

    What is the latest with regards to the status of doubling and electrification of the entire section....is the end anywhere in sight...??

  • @shrinandan0001
    @shrinandan0001 2 года назад +1

    Thank you sir ☺️

  • @ShreeVP
    @ShreeVP 2 года назад +1

    Bro is this recent video or a older one.
    Because I heard that the work is completed in Saunshi & Kundagol.

    • @SingleTraveller
      @SingleTraveller  2 года назад

      Dec Last week on my way to inaugural : ruclips.net/video/P7EcylDZFMA/видео.html
      .

    • @SingleTraveller
      @SingleTraveller  2 года назад

      No, Saunshi to Kundgol , at one place curve has been realigned that's all.
      doubling is pending.

  • @sushantdesai5468
    @sushantdesai5468 2 года назад

    Need to Kolhapur miraj belgaum hubali bengalore vande bharat train....its very nice route

  • @Indtami
    @Indtami 2 года назад +1

    The gatiman speeds above 160..shatabdi at 130..rajathani 150..it's better to have normal trains with reduce the travel time..Chennai Banglore Vande Bharat is a utter failure now..since we have 4 trains starting in less than 2 hours from Chennai..Banglore Chennai mail is the fastest in our route..not sure how long the railways gonna fool the people..

  • @500chethan
    @500chethan 2 года назад +2

    by this year 2023 vande Bharat express will run betn dharwad to Bengaluru 🤗🤐

  • @nansee8
    @nansee8 Год назад

    Ruled out March. VB will run only end of the year 2023

  • @parayash3789
    @parayash3789 2 года назад +1

    Nov-dec 2023 beglavi/ dharwad - KSR benguluru vande Bharat chances 90%

  • @darsanmprasad1741
    @darsanmprasad1741 2 года назад

    Bengaluru to karwar vande bharat express

  • @Legendary-Akshit
    @Legendary-Akshit 2 года назад +1

    Highly unlikely

  • @yagnan998
    @yagnan998 Год назад

    It's March end but still no updates🥲

    • @SingleTraveller
      @SingleTraveller  Год назад

      No, it's doesn't look like VB will start in March ....