Это видео недоступно.
Сожалеем об этом.

Manage eBOM to mBOM to Work Instruct Process

Поделиться
HTML-код
  • Опубликовано: 8 авг 2024
  • This is the second webinar session of three where we cover the CAD to eBOM, eBOM to mBOM and eBOM to sBOM Processes.
    See how you can leverage the eBOM to generate an associative mBOM. The mBOM can be restructured by creating pre-assembly levels, purchased levels, etc., without needing to involve Engineering. The mBOM can be used to make Process Plans (Routings) where assembly operations are defined, and Parts from the mBOM are allocated. Associative illustrations can be created based on each operation to generate Work Instructions. See how a change to the eBOM can easily be incorporated into the mBOM and Process Plans, keeping the digital thread intact.

Комментарии • 3

  • @prassi2003
    @prassi2003 Год назад

    My engineering bom has arrangement , supression controlled parts , position override parts. Due to this I am not able to get the desired JT view after consuming the parts from EBOM TO MBOM, can you help ?? Are we not supposed to use arrangement , supression controlled parts or position override ??

  • @eartheartbaratheon791
    @eartheartbaratheon791 Год назад

    4:33 Those parts created on mBOM side should be Phantom parts or Gathering parts? Or none of those...?