Unitized Curtain Wall installation

Поделиться
HTML-код
  • Опубликовано: 5 дек 2017
  • Unitized Curtain Wall installation Waterloo, London
  • СпортСпорт

Комментарии • 25

  • @JanasZoro
    @JanasZoro 5 лет назад +2

    is it possible to know the specification of the curtain wall panel and mullions ?

  • @jeffreyjames475
    @jeffreyjames475 3 года назад

    Where can I find these carts for purchase?

  • @furkanzhari
    @furkanzhari 2 года назад

    What have u applied on the ceiling?? Why does it look rough?

    • @TheMomentEnds1
      @TheMomentEnds1 2 года назад +1

      that is a spray on mineral fiber fire protection over the structural steel. Wont be seen when complete (above drop ceiling)

  • @lionlinux
    @lionlinux 3 года назад +2

    does they scratched the glass on 2:30 ?

  • @xzarrandiko
    @xzarrandiko 2 года назад

    Hello, where can I find the company who made the metallic structure?

  • @anthonyurbina5768
    @anthonyurbina5768 3 года назад +3

    They make it real easy the company i work for we get the unit up with a presto lift or furniture cart and hold on to the unit with our hands to keep from shooting out the building

  • @kevinkena9081
    @kevinkena9081 Год назад +1

    Good job camera man

  • @deutschmithossein2854
    @deutschmithossein2854 Год назад +1

    Sehr gut instalitsiren

  • @eliasperes7887
    @eliasperes7887 3 года назад

    Cómo me gustaría salir de Panamá Aser ese trabajo en otro pais

  • @janelaeportaacustica
    @janelaeportaacustica 5 лет назад +1

    EXCELENTE

  • @georgemejia1704
    @georgemejia1704 3 года назад

    is it possible to know the manufacture of the curtain wall?

  • @sajithsajith7105
    @sajithsajith7105 2 года назад

    I love my job❤️❤️❤️

  • @ajeetyadav3458
    @ajeetyadav3458 5 лет назад +2

    Nice job

  • @franciscogutierrez3446
    @franciscogutierrez3446 5 месяцев назад

    It looks like they are doing a pretty good job, but aren't this guy's supposed be tied off to a column that's number #1 priority, if OSHA showed up every one on that floor would be getting a ticket and even the contractor

    • @alaintechnicalestablishmen656
      @alaintechnicalestablishmen656 19 дней назад

      If they were on a scaffold, they would be required to. In this case, they are on one of the slab/floors of the building, plus there is safety handrail. They are remaining within the handrail.

  • @SHADOW.GGG-
    @SHADOW.GGG- 3 года назад +1

    good old union labour , ten men when five would do

    • @chasehamrick4321
      @chasehamrick4321 3 года назад

      Judging by the large group of people at 0:58 It looks like they all have back packs on. Some sort of field training? Or college interns perhaps? Everything is not always as it seems.

    • @newsnowadirondacksredux360
      @newsnowadirondacksredux360 2 года назад

      @@chasehamrick4321 Backpacks…. Maybe AntiFa?

    • @TheMomentEnds1
      @TheMomentEnds1 2 года назад

      nope...5 just to set panels, and others to stage panels for setting crew. That big group that walked up iin back look like GC/ arch types