  • @x9rtu3os1t8
    @x9rtu3os1t8 Год назад

    It's so lovely that you do those great lectures in English. Thank you Sir.

    • @SatishIITR
      @SatishIITR  Год назад

      Many thanks for your appreciation, Please forward the link to your connections also for dissemination

  • @Natxx11
    @Natxx11 3 месяца назад

    What are the things I need to do if the required degree of compaction is not achieved at the site?

    • @SatishIITR
      @SatishIITR  3 месяца назад

      You have to do it again. Take out the layer and recompact. No other way. Lack of compaction can lead to several problems later.

  • @betu2010kiit
    @betu2010kiit Год назад

    Informative video! 👍

  • @shitydeshpaande5213
    @shitydeshpaande5213 Год назад +1

    Hello sir,
    Please make a video on pavement design with geogrid, LCR and MIF method as per IRC SP 59.

    • @SatishIITR
      @SatishIITR  Год назад +1

      Thanks for the suggestion, Will try

  • @ramnivas734
    @ramnivas734 2 года назад

    Also on GSB and base

    • @SatishIITR
      @SatishIITR  2 года назад

      The viseo on GSB is already uploaded long back, watch it.

  • @chandrasekarm3463
    @chandrasekarm3463 2 года назад

    Pls make a video about Cement treated base design and construction sir

    • @SatishIITR
      @SatishIITR  2 года назад

      It is already uploded long back. watch it

  • @kundannunia6812
    @kundannunia6812 Год назад

    Sir can you continue the videos with examples ?

    • @SatishIITR
      @SatishIITR  Год назад

      I am explaining the subject with examples wherever it is required and possible. Here in this video There cannot be any example, I suppose. Do you have anyting in your mind??

  • @rajeebdas3750
    @rajeebdas3750 2 года назад

    Sir what to do when there is black cotton soil at base and height of embankment more than 6 MTR

    • @ramnivas734
      @ramnivas734 2 года назад

      In top 500mm use non plastic sand gravel etc

    • @SatishIITR
      @SatishIITR  2 года назад

      The soil at a depth of 6 m does not really matter. You need to comact this layer at MDD and then top 500 mm (which is the subgrade layer) must of of good quailty with CBR more than 8 percent.

    • @rajeebdas3750
      @rajeebdas3750 2 года назад

      @@SatishIITR thanks

    • @rajeebdas3750
      @rajeebdas3750 2 года назад

      Sir as morth cl 2404.2 for High embankment avg shear stress compressibility of clay strata shell be assertain.
      Does the clay affect slope stability under sever wheather conditions

    • @rajeebdas3750
      @rajeebdas3750 2 года назад

      Also refer to morth 2403.2 for High embankment

  • @shubhamkumarsingh3449
    @shubhamkumarsingh3449 2 года назад

    Sir can you explain in brief of MORTH specifications (2013) section 400 and 500.
    Please do the needful Sir 🙏

    • @SatishIITR
      @SatishIITR  2 года назад

      Section 400 and 500 are very long covering different types of mixes. Taking one by one, GSB, DBM, SMA, CTSB, Thin surfacings (PMC, SD, Microsurafcing, seal coat surfacing) already covered and uploaded. Keep watching

    • @shubhamkumarsingh3449
      @shubhamkumarsingh3449 2 года назад

      @@SatishIITR Ok Sir thanks 🙏