  • @advocated.m.shuklgarje1257
    @advocated.m.shuklgarje1257 Месяц назад +7

    Well-done Jaideep Bandhu. Ram Ram.🙏

  • @hiteshj2110
    @hiteshj2110 2 месяца назад +14

    It's a great opportunity for city planners and landscapers to develop highly planned and sustainable cities along the lines of Japanese, Korean cities since majority of the land is empty, so much space for greenfield development. Authorities shouldn't fall for builders lobby. This corridor looks one of the most promising ones in whole MMR region for high potential and growth factoring close proximity to Navi Mumbai Airport, MTHL, JNPT and closer to Pune as well. They should invite MNCs, Educational Institutes, Health and Research Institutes, etc. They should also invite foreign architects to design proper town planing for this corridor.

  • @swapnilsawant1331
    @swapnilsawant1331 2 месяца назад +33

    Boriwali to Virar 5 to 6 lines update please

    • @prasannask8320
      @prasannask8320 2 месяца назад +5

      5th and 6th line will be a waste of money if done before the 3rd and 4th line between virar and dahanu are completed.
      only then will the 5th and 6th line make any sense.

    • @prasannask8320
      @prasannask8320 2 месяца назад +6

      also until the missing section of 5th line between khar and Mahim is not completed, it wont make any difference.
      if the 5th line gets completed first, a lot of outstation trains can be shifted onto the 5th track ( in both directions as that line is bi-directional with bypass at Borivali, Andheri, Dadar existing and need to create at Bandra.
      that would really be a game changer in Mumbai railways .

    • @omkar2810sarvajanik
      @omkar2810sarvajanik 2 месяца назад +3

      Yes dada

  • @gautamsvaidya
    @gautamsvaidya 2 месяца назад +5

    Most awaited & most delayed project.
    Will be welcome if completes in stipulated time.
    Wish the best to all concerned 👍

  • @rameshharer4444
    @rameshharer4444 2 месяца назад +2

    खूप छान माहिती..... 👍

  • @bhagwankarande680
    @bhagwankarande680 2 месяца назад +5

    I think it will be operational in mid- 2027 😊.....nice videography 📷😍

  • @abubakarshaikh1638
    @abubakarshaikh1638 2 месяца назад +2

    Very nicely explained using arrow and sub titles. Thanks.

  • @arindammahapatra5651
    @arindammahapatra5651 2 месяца назад +5

    0:15 and 0:20 arre mai hu yaha 🤩🤩🤩🤩🤩

  • @ShamerFleet
    @ShamerFleet 2 месяца назад +2

    Nice shooting, nice editing, nice progress ❤❤

  • @pralhadshivalkar2581
    @pralhadshivalkar2581 2 месяца назад +3

    This video is awiting since long period

  • @paradoxsolitary3362
    @paradoxsolitary3362 2 месяца назад +27

    8:55 Few trains from Khopoli should run through this route -> Khopoli-Karjat-Panvel-HarbourLine-CSMT. For that, provisions should be made to connect the old existing routes to this new route.

    • @prasannask8320
      @prasannask8320 Месяц назад +4

      i think, ,most of the khopoli trains will be diverted to this route after the panvel karjat tracks gets built. it will save a lot of time for those living in karjat -khopoli region.

    • @pranit77299
      @pranit77299 Месяц назад +5

      Harbour line me fast local ke liye additional tracks nhi he ise Jada fayda nhi hoga panvel se Thane/kurla ke liye 50 min ke aspas lagte he aur csmt ke liye ek ghante se upar jabtak csmt-panvel fast line nhi hoti tab tak koi fayda nhi

    • @sachinnewaskar1000
      @sachinnewaskar1000 Месяц назад +3

      The only problem would be karjat panvel belapur kurla cstm corridor will remain as slow train corridor because of 2 lines whereas whereas cstm kakyan karjat corridor will have fast suburban trains. Also kakyan badalaour 3rd and 4th line will extend fast trains till badalaour. Which means the time taken to reach to karjat by both the corridors will remain almost same because of fast line corridor of main line. However frequency of cstm karjat trains would be much higher on panvel karjat corridor compared with mainline kalyan karjat corridor. Cstm karjat distance via panvel is 78 kms whereas as cstm karjat via kalyan is 100 kms.. 22 kms shorter

    • @prasannask8320
      @prasannask8320 Месяц назад +2

      Kalyan Badlapur section can easily work with just a single bidirectional line to take the load off the current two track section.
      it would be faster and economical to create a bidirectional single line till karjat than to simply have two more lines till just badlapur.
      same goes for Kalyan Kasara section. a single bi directional 3rd line between kalyan and kasara would go a long long way in easing the load from the current two track section.
      same is in use on the western railway from Mumbai central to Borivali. but it is stalled from being fully effective due to a missing section between Khar and Matunga. once that gets built, almost all long distance trains can be diverted to the 5th line ( and 6th line from khar onwards) leaving more slots for fast trains on the fast tracks.

    • @shiva9575
      @shiva9575 Месяц назад +1

      Anyone any idea when there will be fast corridor on harbour line?

  • @jopez1478
    @jopez1478 2 месяца назад +1

    Good video .. n thankyou for the subtitles 👍🏾👍🏾

  • @VaibhavBajirao
    @VaibhavBajirao Месяц назад

    One of the best channel

  • @sandeeppatwardhan1212
    @sandeeppatwardhan1212 2 месяца назад +1

    Good update report!
    After the rainy season, the work has picked up pace, but it is lots of work. I think it will be completed by December 2027 !

  • @IndianRailwaysjourneys
    @IndianRailwaysjourneys 2 месяца назад +1

    Jaideep ji, good update..

  • @sachinnewaskar1000
    @sachinnewaskar1000 Месяц назад +1

    Superb presentation, superb drone shots. Really appreciable. The only thing could not be understood is why kalyan yard redevelopment project cannot be presented with the same technique.. Its very important project from the persepective of reducing the suburban travel time on main line

  • @akinomato
    @akinomato Месяц назад

    "I've been waiting for this video for a long time.

  • @rahmanfoundation6852
    @rahmanfoundation6852 Месяц назад

    Best video with ground report

  • @sandeshp5300
    @sandeshp5300 2 месяца назад +1

    Nice video dada❤️

  • @suhassphatak2486
    @suhassphatak2486 Месяц назад

    Very informative vidio.
    Thanks a lot

  • @pratikgawale7973
    @pratikgawale7973 23 дня назад

    Khup chan detail study karun sagli mahiti dili aahe te pn purn route cha drone shots dakhvun

  • @pandeyblog1986
    @pandeyblog1986 Месяц назад

    Very nice information bhai

  • @hariprasath7756
    @hariprasath7756 Месяц назад

    Thank you brother your information.Hat Prasath, Thanjavur City, Tamil Nadu.

  • @ashwinisawant8655
    @ashwinisawant8655 2 дня назад

    २०२७ पर्यंत हा प्रोजेक्ट पूर्ण होईल काम बघुन तरी वाटत आह😂😊

  • @Royalgamer7090
    @Royalgamer7090 2 месяца назад +5

    जयदीप काणे साहेब मराठीत विडिओ बनवा हीच नम्र विनंती आहे 🙏😊

  • @SSgobtc
    @SSgobtc 2 месяца назад +3

    Needs 2,3 lines in Konkan railway 🚂

  • @girdharadvani2999
    @girdharadvani2999 Месяц назад +2

    Very good project by railway but we want direct trains between Pune and mumbai in which these ghats must be avoided so that journey becomes fast and less time also passenger train must be started also sahyadri express must be restarted thanks

  • @sunilmohandas912
    @sunilmohandas912 Месяц назад +4

    Why Centre not supporting CSMT-Panvel elevated fast corridor ?

    • @Ronakdham
      @Ronakdham 3 дня назад

      Same here Ji we waiting for that Good news brother

  • @Chordekar
    @Chordekar 2 месяца назад +3

    Virar Panvel local corridor ke bare mein video bnao

  • @sachinnewaskar1000
    @sachinnewaskar1000 Месяц назад +1

    Please try to make a vlog on status of 3rd and 4th line work between kalyan and kasara. Its in progress from kasara end

  • @Dadaronaik
    @Dadaronaik Месяц назад

    Nice

  • @bhatkantiwithindianrailway9145
    @bhatkantiwithindianrailway9145 2 месяца назад +1

    Please prepare video on updates about Manmad -Indore Railway project..

  • @karankoli8740
    @karankoli8740 2 месяца назад +2

    Please make video on Mankhurd metro progress

  • @durveshshinde8006
    @durveshshinde8006 12 дней назад +1

    पनवेल-कर्जत 3. 0 mumbai

  • @suhassphatak2486
    @suhassphatak2486 Месяц назад +1

    Would like to see video of khar to borivali 5th and 6 th lane work.
    If the vidio is already done please give link to the same

  • @ashokbadekar6538
    @ashokbadekar6538 Месяц назад

    Aapla Karjat 😌

  • @sunilmohandas912
    @sunilmohandas912 25 дней назад

    Make Panvel Terminus a futuristic landmark...

  • @yuvrajsheler337
    @yuvrajsheler337 2 месяца назад +2

    Kalyan asangoan 3rd and 4th line, asangoan kasara 3rd pr video banav

  • @hardeeppelia2127
    @hardeeppelia2127 2 месяца назад +3

    Will Panvel station be developed in a 13floor building ?

  • @sandeshk007
    @sandeshk007 2 месяца назад +4

    December 25

  • @deepakshinde8985
    @deepakshinde8985 Месяц назад

    Khopoli railway track to be extend upto sudhagadh Pali.

  • @SkylinesConstruction
    @SkylinesConstruction 2 месяца назад +2

    Can you please make a video on how will be the final layout of karjat suburban terminus station!!

    • @yogesh.r
      @yogesh.r 13 дней назад

      I think it'll be serving on Harbour Line trains the CR mainline trains may continue to use the existing stn.

  • @ashutoshMishra-yb8md
    @ashutoshMishra-yb8md Месяц назад

    👍👍👍👍👍👍👍👍

  • @ampm1005
    @ampm1005 2 месяца назад +1

    Jaideep ji how do you pick up these aerial shorts?

  • @skp7772
    @skp7772 Месяц назад +1

    महायुती आयी तो दो साल में ये रेल लाईन शुरु हो जायेगी

  • @pramodvishwkarma4929
    @pramodvishwkarma4929 2 месяца назад +1

    2027 tak hone ki ummeed hai

  • @akshayballal6683
    @akshayballal6683 2 месяца назад +1

    Jyane pan current Karjat station samor property ghetli asel samjun ki local travelling time kami hoil, tyancha motha popat honar ahe in next 2 years.

  • @irfanbargir3207
    @irfanbargir3207 23 дня назад

    Akheer main line se kyun nahi Joda gaya subarban stetion banane ki kya zaroorat thi 🤔

  • @chidanandnazirkar7587
    @chidanandnazirkar7587 21 день назад

    Please demand Passenger train to kokan starting from Karjat

  • @sandeepkadam7982
    @sandeepkadam7982 Месяц назад

    Sir request you to cover the new Konkan green field expressway with its total alignments

  • @APK81
    @APK81 2 месяца назад +1

    December 25 looks doable

  • @KetanSalakre
    @KetanSalakre Месяц назад

    दोन हजार एकोणतीस च्या वेळी जे असेल ते सरकार इलेक्शन च्या आधी तीन महीने ढोल ताशे वाजवत उद्घाटन होईल असे आंम्हाला वाटते ❤

  • @ManishKannanM
    @ManishKannanM Месяц назад

    Can you do a video on vattapara viaduct on nh 66
    It is estimated to be largest viaduct in India,with a height of approximately 27 to 30m

  • @DevendraRawool-o6j
    @DevendraRawool-o6j Месяц назад

    any update on will there be any link between old and new terminals at karjat?

  • @prashantagarwallbmumbai2016
    @prashantagarwallbmumbai2016 2 месяца назад +2

    Total 3 years more

  • @abdulrahim6544
    @abdulrahim6544 2 месяца назад +1

    Aisa lagta hai Inaugration ke pehle kaam poora ho hi jayega.😊

  • @nishikantvedak5286
    @nishikantvedak5286 Месяц назад

    Goregaon to borivili extension update please

  • @meenamore462
    @meenamore462 Месяц назад

    बदलापूर कासगाव जवळ पडेल का

  • @akleshjaiswar6132
    @akleshjaiswar6132 2 месяца назад +1

    This project complete in 2028 panvel to karjat line Corridor🎉. Many work is not complete. 🎉

  • @sujitkhaire5848
    @sujitkhaire5848 Месяц назад

    Konkan railway kolad to ratnagiri new railway station apdat .. ❤❤

  • @ShivamLifeAnnu
    @ShivamLifeAnnu Месяц назад

    Kya isme 2 new lines ka work chal rha eksath ?

  • @swastiklad1738
    @swastiklad1738 2 месяца назад +2

    Suburban Terminal? Is it for only local train or for Mail express?

    • @yogesh.r
      @yogesh.r 13 дней назад

      Only local trains, hopefully not only for harbour line😂

  • @shyamsundarwawdane907
    @shyamsundarwawdane907 Месяц назад +1

    What about Kalyan panvel ?

    • @prasannaiyer4030
      @prasannaiyer4030 2 дня назад

      its lying in dust ...a project of 450 cr was projected woth the viaduct turn over at kalwa to join the trans harbour line .now after 5 yrs no breakthrough ....obviously now the cost muat hv be tripled..this is how govt works 😢

  • @kamaldadlani3972
    @kamaldadlani3972 Месяц назад

    May be operational after 2027

  • @shubhampawara781
    @shubhampawara781 2 месяца назад +1

    Karajat suburban line par express train pn chalnar ka ? Js ki karajat badlapur line vr emu aani expp doni pn chalta as

    • @JaideepKane
      @JaideepKane  2 месяца назад +3

      Te ajun confirm samajle nahi. But Sadhya cha single line ahe tyamule tyavarun mail/express janar or donhi route use karu shaktat

    • @hrid22
      @hrid22 2 месяца назад +1

      ​@@JaideepKane kalyan kasara 3rd line update pls

    • @shubhampawara781
      @shubhampawara781 2 месяца назад +1

      @@JaideepKane ok thank you ☺️

  • @sumitghodeswar7668
    @sumitghodeswar7668 Месяц назад

    Kasar kalyan 3 to 4 lines update please

  • @omkarpatil3943
    @omkarpatil3943 Месяц назад

    8:57 sir you have made a mistake while saying
    Its not 800-900 km it's 800-900 m

    • @JaideepKane
      @JaideepKane  Месяц назад

      I have said ‘meter’ not kilo meter

    • @omkarpatil3943
      @omkarpatil3943 Месяц назад

      @@JaideepKane Ok sorry
      I was having misunderstanding in listening

  • @shardulbirari
    @shardulbirari Месяц назад

    Kalyan badlapur 3 rd 4 th line update please

  • @natarajank9789
    @natarajank9789 Месяц назад

    This will be single track or two tracks?

    • @sachinnewaskar1000
      @sachinnewaskar1000 Месяц назад +1

      @@natarajank9789 this new panvel karjat corridor will be of double track. The existing panvel karjat track would be for mail express and goods trains. So there would be total 3 tracks between panvel and karjat

  • @user-j7y9wIl
    @user-j7y9wIl 2 месяца назад +2

    Watch I-LEAGUE & Watch ISL ⚽⚽⚽
    support Indian football and help to make AIFF richest ⚽ Federation of the world 🌎 🌍 🌏 and make Indians proud like BCCI 🏏🙏🙏🚩vv

  • @tarique17
    @tarique17 2 месяца назад +1

    Will finish @ 2026

  • @sanatani__raj_
    @sanatani__raj_ 2 месяца назад +1

    Virar dahanu 3rd and 4th line update 😢

  • @niheerthakur1608
    @niheerthakur1608 2 месяца назад +1

    Panvel🚉 karjat new railway line🚊. Panvel railway station is changing and railway connecting. Local rail nazdik single rail karjat. Karjat suburban railway station platform no 1 to 3 new karjat suburban train parking🅿 railway line 3 tunnels and mumbai pune satara highway expressway down panvel karjat up railway crossing. How to change and railway connecting ?

  • @abhishekmhamunkar4189
    @abhishekmhamunkar4189 Месяц назад

    मराठी व्हिडिओ बनवा. 🙏🏻

  • @mr.mangesh4280
    @mr.mangesh4280 Месяц назад

    Video Kaise banate hai

  • @koustubgupta4960
    @koustubgupta4960 Месяц назад

    2027 mae complet hoga

  • @samirmali6042
    @samirmali6042 Месяц назад +1

    दांडफटा stop 🛑 hona chahiye

  • @PrakashShinde-f9y
    @PrakashShinde-f9y Месяц назад

    Lonavala to karjat seva jhali pahije

  • @girdharadvani2999
    @girdharadvani2999 Месяц назад

    This project will take another 3 to 4 years

  • @viralshiyarwala1156
    @viralshiyarwala1156 Месяц назад

    10 sal aur lagega

  • @mehtapramod23
    @mehtapramod23 2 месяца назад +1

    ALL FUTURE RAIL SHOULD BE HIGH SPEED IF WE WANT TO BE SUPER POWER UP TO 2047

  • @ATUL_JANGAM
    @ATUL_JANGAM 2 месяца назад +5

    Project will be completed till 2028

  • @deepakdeepak2938
    @deepakdeepak2938 2 месяца назад

    Dec 2026

  • @inociant
    @inociant 20 дней назад

    2-3 sal jayage or bante bante

  • @AmitTemkar-u6q
    @AmitTemkar-u6q 27 дней назад

    December 2026 End

  • @pallabdas1134
    @pallabdas1134 2 месяца назад

    Aur 3 saal lagega pura kaam honey mein.

  • @bharatichaudhari
    @bharatichaudhari Месяц назад

    Hum school me the tab se shuru ho raha hai, 23 sal se bhi jyada hogaye hai janta ko bevkuf samjate hai aur kuch bhi nahi, ye kyu nahi hone diya ye bhi janata achhe se janati hai

  • @asifshaikh5574
    @asifshaikh5574 24 дня назад +1

    Project will be complete till 2032.....

  • @ajay9760
    @ajay9760 2 месяца назад

    We are lossing our maharashtra land and its natural beauty of nature people from all over india will come and we loose our Maharashtrian culture, land, nature, the current govt has nothing do with the nature they just want to expand cities leaving no villages, no forest, no agriculture lands nothing will be left, this current govt of Maharashtra cannot make rule like modi's gujarat if land has sell to Maharashtrian farmers only or to Maharashtrian people other state in india can make rules can save there lands then why cant the Maharashtrian people specially this neta log even if they have power they are like businessman servants no love for the state.

  • @prasannaiyer4030
    @prasannaiyer4030 2 дня назад

    next 5 years project ....no wonder people die to get a govt job ..bcoz hardly they work n hardly complete one project in their lifetime ...horrendous job 😏😏

  • @puranjansafui7846
    @puranjansafui7846 Месяц назад

    Kavivi kisi k kaan k piche jakar ha ha ha ha ha ha aise haso matttttttttt 😡, Taklif hoti hai 🤬

  • @UsmanPatel-iv4yh
    @UsmanPatel-iv4yh 2 месяца назад +5

    दिवा ते कर्जत लोकल चालु केली तर खुप लोकाना सोयीसकर होईल

  • @Daughter_of_hades_
    @Daughter_of_hades_ Месяц назад

    India should give infrastructure work to Chinese company. We can not remain in race with this type speed of work.

  • @satyam1529
    @satyam1529 2 месяца назад

    Jaideep saheb - what about Old Sri Sai Baba mandir near to railway station? It is still there or will be move somewhere else.
    Also want to know the redevelopment of old Railway station, is happening or not.

  • @satyam1529
    @satyam1529 2 месяца назад +1

    If Railway increase the speed of constructions, than will be by end of December 2025 or may extend to March 2026. Because many places construction of station is pending.
    I think, Railway should merge this Panvel - Karjat line with Old station only. It would have been easy for people to catch local train easily. Other thing is that those who want to catch Express from Karjat station, would also be easy to get at old station and catch the express.