Seaford Bay Reconstruction PT3 and the Meeching Tug - 1987

Поделиться
HTML-код
  • Опубликовано: 1 дек 2024

Комментарии • 2

  • @KapitanKremmen
    @KapitanKremmen 10 месяцев назад +1

    It was money well spent, prior to this work, the beaches at low tide were a long way down from the road, now at same level to the road and a great local amenity no matter what the state of the tide.
    However, the sea drags out the beach in the winter storms and has to be bulldozed back into position.
    Very interesting video and technical information.

  • @ChubbyChecker182
    @ChubbyChecker182 5 дней назад

    Lovely stuff, God Bkess Seaford.