Layout kinda reminds me of a new gen superman the ride at sfne with all the straight airtime hills in the first half and the twister second half. Great work!
So, it has 2 trains with a capacity of 32 people each, and the cycle lasts 3 minutes, accommodating 1,280 people per hour. I think that’s a reasonable amount.
@@maiconcostarosa, it's normal, yes. But there's so much potential. For my gigas, I usually use 10 row B&M hyper trains and try to get the maximum block period below 60 s. I usually achieve 52ish s so >2,700 PAX/h. With the loading mechanism successfully applied with Voltron, dispatching times below 50 s are easily possible - obviously not with the bad US ride management but that's another problem and not up to us...
Guys, if you like the video, don't forget to hype and liked it it helps my channel a lot! ❤
Reminds me a _lot_ of the proposed Vekoma layout for Hyperion. I like it.
Layout kinda reminds me of a new gen superman the ride at sfne with all the straight airtime hills in the first half and the twister second half. Great work!
Thank you 🫶🏻
This looks like a phenomenal ride! Vekoma really needs to do hypers, because from how it looks they would absolutely SMACK!
My one critique is that the pacing is a little slow because of the massive train.
@TheTorturedCoastersDept. I understand, maybe I could have reduced a train or two, but thank you 🫶🏻
Man, I love Vekoma hypers. They never get enough love here on YT.
Reminds me of the layout Vekoma made for Hyperion, great work as always!
@@Fazcoasters The premise and intention were like this, but with a unique layout.
easily best hyper in the world if built
Very Very Very nice lol. Again, one of your best works
Thank you 🫶🏻
@maiconcostarosa Yup lol 😀
love that double roll turnaround
Love the colour scheme
Nice
Thanks! :)
Awesome
Not enough block brakes to push the capacity...
So, it has 2 trains with a capacity of 32 people each, and the cycle lasts 3 minutes, accommodating 1,280 people per hour. I think that’s a reasonable amount.
@@maiconcostarosa, it's normal, yes. But there's so much potential. For my gigas, I usually use 10 row B&M hyper trains and try to get the maximum block period below 60 s. I usually achieve 52ish s so >2,700 PAX/h.
With the loading mechanism successfully applied with Voltron, dispatching times below 50 s are easily possible - obviously not with the bad US ride management but that's another problem and not up to us...
Lei😊