Heat Exchanger Tube Bundle Extraction Process

Поделиться
HTML-код
  • Опубликовано: 20 окт 2024

Комментарии • 30

  • @babyanthony8359
    @babyanthony8359 Год назад +2

    I was in this field around 20years,assembling new heat exchangers,boilers.I have done re tubing of bundles,horizondal,vertical and U bundles.I am very experianced with electronic tube expansion machine,tube puller,tube cutter etc...

  • @angelvillarruel1374
    @angelvillarruel1374 Год назад +1

    Agradezco mucho la información.
    Felicitaciones

  • @diezelsyndicate553
    @diezelsyndicate553 5 лет назад +3

    @7:39 is that a spot you should be in when pushing a bundle?
    Im genuinely asking because I don't know if it's a bad spot to be and whether or not it's a hazard

    • @mutiur7396
      @mutiur7396 5 лет назад

      These do not go that easily and such positions are normal. I donot know about the opinions of others.

    • @maiksteijns8610
      @maiksteijns8610 4 года назад

      what is he watching ? if all the tubes have no damages , it's not necassary to be in that position ! small hint , you check or the owner checks this when the bundle goes out !

    • @vivekchemmanibhasy
      @vivekchemmanibhasy 4 года назад +1

      Definitely not required to be there and it is very risky too.

    • @MrMarkRoads
      @MrMarkRoads 3 года назад

      As a crane operator I would stop this operation until this fool was out of there. You can watch the bundle go in and adjust the carriage from the side.

  • @diezelsyndicate553
    @diezelsyndicate553 5 лет назад +2

    Wouldn't you use the first carriage after the main hold on the tube sheet and not the second one? During extraction?

    • @MrMarkRoads
      @MrMarkRoads 3 года назад +1

      As a crane operator watching from the cab there's lots of ways they do it. If it's going well they'll pull more out before taking the straps off. This is also a very clean unit. Some of this is being done for the camera. Pulling and flying bundles was where I always wound up. 12 hours a day 7 days a week till the plant is back up.

  • @rutjasmine9200
    @rutjasmine9200 4 года назад +1

    woah for the first time i see the heat echanger in the real type for extraction process

  • @karthickmahadevan8021
    @karthickmahadevan8021 2 года назад +1

    Where to get hire this one

  • @rakshithkotian9900
    @rakshithkotian9900 Год назад

    What is that pulling thing called?
    The machine that helped in getting out those tubes.

  • @chrisbel5404
    @chrisbel5404 Год назад

    Why not pull with wire chokers

  • @ovalwingnut
    @ovalwingnut 4 года назад +1

    That is the 2nd largest heat exchanger I've ever seen 🤔

  • @fengcai9812
    @fengcai9812 5 лет назад

    Out of curiosity, why were the Fatigue videos removed?

  • @EO.studios
    @EO.studios 22 дня назад

    You guys need me to make your videos man that was hard to watch

  • @mrbadboy1988
    @mrbadboy1988 2 года назад +1

    Before this, key 51 and 🔨 10kg 🤣🤣

  • @daniacosta7786
    @daniacosta7786 5 лет назад

    Flipante, ahora veo los tubos de otra manera

  • @Jimmyjimjimjim
    @Jimmyjimjimjim 3 месяца назад

    I hope this was the first and last filming job that camera man had. Holly smokes.

  • @rivanoctavian9092
    @rivanoctavian9092 4 года назад

    How to inspection ?

  • @sanjana6a275
    @sanjana6a275 6 лет назад

    Super

  • @sanjana6a275
    @sanjana6a275 6 лет назад

    Interesting

  • @abraaobahia8924
    @abraaobahia8924 Год назад

    Abraaoalvesbahia

  • @sanjana6a275
    @sanjana6a275 6 лет назад

    Interesting