I was in this field around 20years,assembling new heat exchangers,boilers.I have done re tubing of bundles,horizondal,vertical and U bundles.I am very experianced with electronic tube expansion machine,tube puller,tube cutter etc...
@7:39 is that a spot you should be in when pushing a bundle? Im genuinely asking because I don't know if it's a bad spot to be and whether or not it's a hazard
what is he watching ? if all the tubes have no damages , it's not necassary to be in that position ! small hint , you check or the owner checks this when the bundle goes out !
As a crane operator I would stop this operation until this fool was out of there. You can watch the bundle go in and adjust the carriage from the side.
As a crane operator watching from the cab there's lots of ways they do it. If it's going well they'll pull more out before taking the straps off. This is also a very clean unit. Some of this is being done for the camera. Pulling and flying bundles was where I always wound up. 12 hours a day 7 days a week till the plant is back up.
I was in this field around 20years,assembling new heat exchangers,boilers.I have done re tubing of bundles,horizondal,vertical and U bundles.I am very experianced with electronic tube expansion machine,tube puller,tube cutter etc...
Agradezco mucho la información.
Felicitaciones
@7:39 is that a spot you should be in when pushing a bundle?
Im genuinely asking because I don't know if it's a bad spot to be and whether or not it's a hazard
These do not go that easily and such positions are normal. I donot know about the opinions of others.
what is he watching ? if all the tubes have no damages , it's not necassary to be in that position ! small hint , you check or the owner checks this when the bundle goes out !
Definitely not required to be there and it is very risky too.
As a crane operator I would stop this operation until this fool was out of there. You can watch the bundle go in and adjust the carriage from the side.
Wouldn't you use the first carriage after the main hold on the tube sheet and not the second one? During extraction?
As a crane operator watching from the cab there's lots of ways they do it. If it's going well they'll pull more out before taking the straps off. This is also a very clean unit. Some of this is being done for the camera. Pulling and flying bundles was where I always wound up. 12 hours a day 7 days a week till the plant is back up.
woah for the first time i see the heat echanger in the real type for extraction process
Ok sir
Where to get hire this one
What is that pulling thing called?
The machine that helped in getting out those tubes.
Bundle puller
Why not pull with wire chokers
That is the 2nd largest heat exchanger I've ever seen 🤔
Out of curiosity, why were the Fatigue videos removed?
Due to copyright law
You guys need me to make your videos man that was hard to watch
Before this, key 51 and 🔨 10kg 🤣🤣
Flipante, ahora veo los tubos de otra manera
I hope this was the first and last filming job that camera man had. Holly smokes.
How to inspection ?
Super
Interesting
Abraaoalvesbahia
Interesting
Vou jab by hi