How To Install a Meter Socket and Main Panel

Поделиться
HTML-код
  • Опубликовано: 22 авг 2024
  • Learn how to install a main panel and meter socket. Installation by @energyoneelectric

Комментарии • 29

  • @vince6829
    @vince6829 Год назад +2

    Nice job! Thank you for sharing your knowledge.

  • @royalrhinointeriors
    @royalrhinointeriors Год назад +1

    Good job explaining how to do this properly.

  • @Pembroke.
    @Pembroke. Месяц назад +1

    Thank you for sharing your hard work take care and Happy Canada Day 🇨🇦 and Happy 4th of July 🇺🇸🍺🍺🍺

  • @diamondwere5483
    @diamondwere5483 Год назад +1

    first of all love the detail and close ups. i am currious, if you're running TECK why the PVC. just esthetics? although it came in handy for the ground.

    • @energyoneelectric
      @energyoneelectric  Год назад +1

      Glad you find the video useful. There was already ACWU cable in the ground before I quoted that job. The inspectors around here want a pvc sleeve over the cable even if it's armoured, plus it looks better than a black cable running up the wall. Thanks for watching!

  • @doncc6080
    @doncc6080 11 месяцев назад +1

    Nice job but why wasn't the siding put on first?

    • @energyoneelectric
      @energyoneelectric  10 месяцев назад

      On new builds the siding normally goes on after all utilities and penetrations are complete. At least around here.

  • @PMJRobertsonHD5
    @PMJRobertsonHD5 3 месяца назад

    Dont you need a disconnect outside to protect the transformer or to work on the main panel?
    Also Is it okay to connect straight from transformer to a meter/main combo without a fused disconnect ?

    • @energyoneelectric
      @energyoneelectric  3 месяца назад

      Disconnect is not required between meter and panel in this case. If you ever need to work on the panel mains you must call the utility company to shut off the power.

  • @hashishsenju2015
    @hashishsenju2015 10 месяцев назад +1

    On the meter box: the bottom 2 hot lines going to the main breaker, do they have to be crisscross like what you did, or can they be on the same side as the main lines coming in from the top?

    • @energyoneelectric
      @energyoneelectric  10 месяцев назад

      Are you referring to the blacks and reds not being on the same side top and bottom? Or are you asking if the load cables could come into the bottom of the meter box?

    • @hashishsenju2015
      @hashishsenju2015 10 месяцев назад +1

      @@energyoneelectric The black and red hot wires on the bottom that are going out to the main breaker.

    • @energyoneelectric
      @energyoneelectric  10 месяцев назад +1

      @@hashishsenju2015 it doesn't make a difference whether your black or red is on the left or right, and it doesn't need to match the line side either. Put them on either side.

    • @hashishsenju2015
      @hashishsenju2015 10 месяцев назад

      @@energyoneelectric Thank you sir 🙏

  • @frankelizondo7477
    @frankelizondo7477 5 месяцев назад

    The 2 hot wires going to the house ,,,,,,,, where will you hook them up at your entrance panel on this video ? anyone can answer ...... I do not see the lugs where the 2 hot wires need to be wired to.... what brand and model no. of entrance panek ?

    • @energyoneelectric
      @energyoneelectric  5 месяцев назад +1

      The cable that feeds the sub panel in the house was attached to a 100A 2-pole breaker at the shop panel, and in the house it was attached to the main lugs (no main breaker in the house). Hope that clears it up a bit.

  • @jacobblackshear6105
    @jacobblackshear6105 6 месяцев назад

    how many amps are you bringing to the meter

  • @rohanferguson920
    @rohanferguson920 10 месяцев назад

    What happens if the load wire is connected at the top and the line wire is connected at the bottom

    • @energyoneelectric
      @energyoneelectric  10 месяцев назад +1

      You won't pass inspection and the utility company won't power it up. The meter box is clearly labeled inside.

  • @ddaniels2901dd
    @ddaniels2901dd Год назад

    Why are you bringing power to the shop first instead of the house and why is the house being fed off a subbreaker

    • @energyoneelectric
      @energyoneelectric  Год назад +1

      When I got called out to quote and do this job the power cable was already at the shop..I would have brought it to the house personally.

  • @josecruz7235
    @josecruz7235 8 месяцев назад

    What breaker did you use to feed the house

  • @dennishouk4630
    @dennishouk4630 6 месяцев назад

    If using 2" conduit, why not just use a 2" male adapter rather than using that "tech connector" into the meter box?

    • @energyoneelectric
      @energyoneelectric  6 месяцев назад +1

      By code we need to bond the metal armor of that cable.. that's where the teck connector comes in. Inside the connector it is making contact with the metal armor. Then we attach a grounding bushing on the connector to bond the actual bonding cable too. Running your armored cables through pvc conduit and a male fitting wouldn't achieve your bonding requirement. Hope that helps, and thanks for inquiring.