WINDER CONTROLS South Africa - the world's largest mechanically coupled Blair multi-rope winders.

Поделиться
HTML-код
  • Опубликовано: 7 сен 2024
  • Winder Controls, in conjunction with SIEMAG TECBERG Group, supplied, installed and commissioned the mechanical portions of trhe world’s two largest mechanically coupled Blair Multi-Rope Winders for Gold Fields South Deep Gold Mine.
    For more information visit our website!
    Links:
    💻 Website: www.siemag-tec... ‍
    👨‍💼 Career opportunities: www.siemag-tec...
    Social Media:
    🔵 LinkedIn: / siemag-tecberg-group
    🟠 Instagram: www.instagram....
    🟢 Xing: www.xing.com/p...
    🟣 Facebook: / siemagtecberg
    FAQs:
    🤔 Who is SIEMAG TECBERG?
    The SIEMAG TECBERG group is the world's leading supplier of shaft hoisting technology. The group implements knowledge-based services to supply individual machines and systems for a total of six industrial applications: Shaft hoisting technology for the extraction of raw materials, shaft hoisting technology for the storage of contaminated raw materials, technologies for the horizontal conveying of bulk materials including handling technology for raw materials, conveying and transporting heavy loads, ventilation and cooling of underground mines, as well as technologies for the efficient application of energies in hoisting technology.
    🤔 What makes SIEMAG TECBERG special?
    The SIEMAG TECBERG group's technical focus is on the development, design, manufacture, commissioning and technical service of shaft hoisting systems for the horizontal, vertical and inclined conveying of raw materials. In doing so, the SIEMAG TECBERG group has distinct engineering competences for mechanics, hydraulics, drive and automation technology.
    Unique reference projects worldwide are proof of the SIEMAG TECBERG group's overall plant competence and leading position.
    🤔 Where is SIEMAG TECBERG?
    The SIEMAG TECBERG group is represented on all continents with at least one subsidiary and works with cooperation partners worldwide. In addition to the headquarters with assembly plant in Haiger, there are locations in Milwaukee and Denver/USA, Rugby/UK, Katowice/Poland and Moscow/Russia, supplemented by further locations with likewise own assembly plants in Tianjin/China, Sydney and Mayfield East/Australia as well as Johannesburg/South Africa. Approximately 400 employees work for the group worldwide.

Комментарии • 1

  • @peetschabort1080
    @peetschabort1080 6 дней назад

    About 40years ago at Winkelhaak Mines (Evander) nr 6# as a mine surveyor I was part of a survey team to check the concrete reinforcing for the bed of the winders. Once started in pouring the concrete there is no interruption until the whole bed is completed. Then the lining up of the winder ropes with the shaft sheave wheels. The sheave wheel must be perfect in direction to the winder drum as well as absolutely vertical.