My Model Railway Layout, Episode 11 Installing The Engineers Yard

Поделиться
HTML-код
  • Опубликовано: 12 сен 2024
  • June's update from Westbridge model railway is all about the engineers yard. After a brief look at the revised bi-directional freight line adjacent, this movie covers the track laying and installation of the electro-frog points followed by adding the dropper wires to the bus wire, and then testing with the sound-fitted Class 08 and some other locos before taking in some appropriate wagons.
    Filmed during June 2024.
    #mrdeltic15
    #modelrailway
    #ngauge

Комментарии • 6