Mega Engineering Loading the Zhong Ren Verolme , Cork

Поделиться
HTML-код
  • Опубликовано: 12 дек 2024

Комментарии • 21

  • @billykiely2006
    @billykiely2006 10 дней назад +3

    Great video thanks for sharing. Great to see the dockyard so busy and irish engineering excellence from Killarney. That ship would be interesting on a choppy sea 😊

  • @radharcanna
    @radharcanna 10 дней назад +1

    Another fabulous video. The sheer scale of those cranes is amazing. And the skill in loading them on the ship. You would think that three booms facing in the same direction would destabilise the load but maybe they’re reasonably light compared to the rest of the structures.

  • @paulfitz101
    @paulfitz101 7 дней назад +1

    Excellent video DroneHawk.

  • @Sunstryker3
    @Sunstryker3 11 дней назад +1

    Great aerial footage of the STS Cranes

  • @jimwoods9551
    @jimwoods9551 11 дней назад +1

    The scale is amazing

  • @johnheffernan1548
    @johnheffernan1548 10 дней назад +1

    Super video, great detail. I enjoyed that....

  • @Joewho99
    @Joewho99 11 дней назад +1

    Excellent video thanks for posting .

  • @stuartlast8156
    @stuartlast8156 11 дней назад +1

    Thats amazing, thanks for showing that, great video as always 👏👏

  • @steveincork3669
    @steveincork3669 8 дней назад

    Outstanding well done👍

  • @ultanfinegan8188
    @ultanfinegan8188 11 дней назад +2

    One ship sailed ahead with parts for final assembly in port of destination

  • @arturbonikowski2362
    @arturbonikowski2362 11 дней назад

    Bravo Cork!

  • @treborsirrah7916
    @treborsirrah7916 11 дней назад +4

    How can that ship go to sea with the deck so low in the water.

    • @eastcorkcheeses6448
      @eastcorkcheeses6448 11 дней назад +3

      Is that just for loading?

    • @radharcanna
      @radharcanna 10 дней назад +5

      I think they displace ballast and the ship rises in the water. They lower it for loading.

    • @tomp1193
      @tomp1193 9 дней назад +3

      The ships deck has to be level with the quayside for loading and unloading, They do this by adding or taking water in the ballast tanks

  • @alii303
    @alii303 11 дней назад

    where are they taking them

    • @dronehawk
      @dronehawk  7 дней назад +1

      Hamburg

    • @alii303
      @alii303 3 дня назад

      @@dronehawk why dont they assemble in Hamberg what am i missing

  • @thomasjosullivan9179
    @thomasjosullivan9179 11 дней назад

    This is just a transport position, these cranes will be reassembled on site to a standard Container crane shape on site!!!
    Anyone unfamiliar would be very confused with the current cranes!!

  • @damienhill6383
    @damienhill6383 6 дней назад +1

    I hope she's not at sea tonight ..