Delhi Katra Expressway | Package 1 Update | Haryana |

Поделиться
HTML-код
  • Опубликовано: 15 окт 2024
  • Delhi, Amritsar #KatraExpressway is an approved 670 km (420 mi) long, 4-lane (expandable to 8 lanes) wide controlled-access expressway, which will connect Bahadurgarh border near #delhi with #katra in Jammu and Kashmir via Haryana and Punjab. It will have a spur section which will connect Nakodar with Sri Guru Ram Dass Jee International Airport located in Raja Sansi, Amritsar.[3] The 397.7 km (247.1 mi) long Delhi,Nakodar,Katra section is National Expressway 5 (NE-5) and 99 km (62 mi) long Amritsar-Nakodar section is National Expressway 5A (NE-5A). Once completed, it will reduce the current Delhi-Katra distance from 727 km (452 mi) to 588 km (365 mi) and the time travel will be reduced from 14 hours to 6 hours, and Delhi-Amritsar distance to 405 km (252 mi) and from the time travel will be reduced from 8 hours to only 4 hours.[3]
    It will have a trauma centre, ambulances, fire brigades, traffic police, bus bays, truck stops, interchanges with refreshment, and recreational facilities. To be constructed as a part of the Bharatmala Pariyojana,[1] it is expected to cost ₹40,000 crores.[4] Detailed Project Report (DPR) was completed in November 2019,[5] and land acquisition commenced from January 2020.[6][7] M/S Feedback Infra Pvt Ltd. was appointed as DPR consultant to carry out alignment studies which submitted the final shortest proposed alignment report of Delhi-Nakodar-Gurdaspur section in September 2019,[8] Nakodar-Amritsar section in June 2020, and the survey is currently under progress in Jammu section.[9] It is part of Ludhiana-Delhi-Kolkatta Industrial Corridor. There are 11 National industrial corridors and numerous state level industrial corridors in India.
    -----------------------------------------------------------------------------------------------------
    Visit our website rslive.in/
    ------------------------------------------------------------------------------------------------------
    For business inquiries email me :- rsliveindia@gmail.com
    ------------------------------------------------------------------------------------------------------
    आप सभी का बहुत बहुत धन्यवाद.. Thank you for your love
    #rslive #RSlive #irslive

Комментарии • 131

  • @vikram.singh.
    @vikram.singh. Год назад +37

    भाई को राम राम

  • @apanbihar1
    @apanbihar1 Год назад +24

    It is good for our militarily movement... Hats of gadkari ji and ministry of defence...

  • @ankitbhat4853
    @ankitbhat4853 Год назад +12

    India mein 100 - 150 expressways ki bhot sakht zarurat hai Rajan Sir Ji.

    • @25yearsand
      @25yearsand 10 месяцев назад +3

      usko kya bol raha hai, usnay thodi banana hai 😂😂

  • @Jaishreekrishna19200
    @Jaishreekrishna19200 10 месяцев назад +4

    Let us not just watch the video and leave , the guy is really working hard to show us the progress of growing Bharat , he should be appreciated for it 🎉.
    Thanks for your work .
    Jai shree Ram 🙏🙏
    Hare Krishna 💙💙

    • @RSLive
      @RSLive  10 месяцев назад +1

      Thank you for your love and Support 🙏

  • @shakil_khan786
    @shakil_khan786 Год назад +13

    Nitin gadkari sir is a great leader bhai jai hind🇮🇳🇮🇳

  • @harjoylambha7655
    @harjoylambha7655 Год назад +23

    Thanku modi ji so much for making India great nation again.
    Its all vision from the government's and implementation of nitin gadhkari ji.
    Jai hind jai bharat.

    • @amazingVlogs240
      @amazingVlogs240 Год назад +1

      @123userzBurnol laga lo

    • @Abba_E_Pakistan
      @Abba_E_Pakistan Год назад +1

      ​@123userzbeta burnol mili kyaa 😂😂

    • @Abba_E_Pakistan
      @Abba_E_Pakistan Год назад

      ​@123userzAcha tu koi B$DK musalman... G to phir phatni hi hai 😅🤣🤣

  • @ishaan4085
    @ishaan4085 Год назад +6

    Shri Nitin Gadkari ji Father of modern Indian infrastructure

  • @neeshantsehrawat7076
    @neeshantsehrawat7076 Год назад +2

    Wonderful update bhaiya 🇮🇳 🌉🌉 maja aa gya such a detailed and long video 🎉🎉🎉

  • @kang2753
    @kang2753 Год назад +11

    Hopefully, it would be competed by February 2024.

  • @PankajSachdeva
    @PankajSachdeva Год назад +18

    Each side minimum lanes should be 3 for any new expressway or bridge. 2 lanes are always occupied by trucks, if one remembers driving on PANIPAT highway or any other.

    • @jaguarunleashed4935
      @jaguarunleashed4935 Год назад

      yes ideally 3+3 is reqd.

    • @dharmeshpatel6657
      @dharmeshpatel6657 Год назад +7

      Yes, they should have gone for 6 lanes from the beginning. 4 lanes will be a big problem.

  • @Amit-li2gi
    @Amit-li2gi Год назад +16

    Great update 👍.
    Do you think it will have less traffic than Trans Haryana highway, that is 3+3 lanes while this Expressway is 2+2 lane which will have more traffic. How 120kmph is justified on a 2-lane Expressway.
    Every Expressway should be 3+3 lane atleast from the start. Expansion should be required after many years not just after start of Expressway....

    • @jaguarunleashed4935
      @jaguarunleashed4935 Год назад +3

      3+3 minimum lanes is correct, however this eway had run into lot of problems with LA and many court cases filed as well if im not incorrect . not sure about the status of the cases.

    • @ARUNYADAV-xd2ic
      @ARUNYADAV-xd2ic Год назад

      Problem shouldn't be solved permanently.

  • @mukeshvats2727
    @mukeshvats2727 11 месяцев назад

    Jai siya Ram Radhey Shyam

  • @crezy490
    @crezy490 Год назад

    Really Bharat is fery fast deploping...🇮🇳🇮🇳🚩🚩

  • @sumitnarwal679
    @sumitnarwal679 Год назад +2

    Your work is so satisfying ...

  • @divinetechcomputer4283
    @divinetechcomputer4283 Год назад +2

    सर बुलेट ट्रेन अहमदाबाद मुंबई का भी अपडेट दीजिए प्लीज हम आपकी सभी वीडियो देखते है बहुत ही अच्छी वीडियो होती है आपकी, ड्रोन कैमरे से और भी 4 चांद लग जाते है आपकी वीडियो में

  • @namanjain5633
    @namanjain5633 Год назад +4

    Give update of Madhya Pradesh section ,today is inaugration ( Delhi Mumbai expressway)

  • @Civilian10827
    @Civilian10827 Год назад

    Sir music ke alawa everything was nice 👍

  • @pankajchaudhary6535
    @pankajchaudhary6535 Год назад +2

    One and only Nitin Gadkari sir🙌🙌

  • @vijayrode9645
    @vijayrode9645 Год назад +3

    Nitin gadkari ❤❤❤❤

  • @krishankashyap6392
    @krishankashyap6392 Год назад

    बहुत मेहनत की आपने वीडियो बनाने के लिए ❤❤

  • @poddarhouse
    @poddarhouse 11 месяцев назад +2

    Sir your Videos are very informative. Keep up the good work.
    My question is:
    Sir whats the status of NE4 between Lalsot to Jhalwar ?
    Is it operational road from Sohna to Thandla now ? Or else Lalsot to Jhalwar is missing yet to be open?
    If its yet to be open then whats the current status?
    I checked all your videos but this was missing, if you have made any video on this please share link.
    Thanks and once again keep up the good work.
    Dtd 22.10.23

  • @VijayKumar-uj9py
    @VijayKumar-uj9py 5 месяцев назад

    When will come the next video? Please do inform us. Video has already been shared and subscribed.

  • @jsmn.once.2001
    @jsmn.once.2001 Год назад +2

    I have a request.. can you make an update video on the ludhiana section of delhi amritsar expressway

  • @jitendratiwari6721
    @jitendratiwari6721 Год назад +1

    Kya nya sansad bhavan pura ho Gaya hai ya baki hai apdate dikhaye

  • @manmohankaushik5009
    @manmohankaushik5009 Год назад +1

    Also mention the place name at regular intervals for better understanding of the location

  • @Outoftime914
    @Outoftime914 Год назад +2

    Mai 1.5 years phile subscribe kr liya tha re baba

  • @magansatsangi3578
    @magansatsangi3578 11 месяцев назад +1

    Thanks for providing wonderful update, can you please confirm by when expressway will be completed till trans haryana expressway from kmp expressway.

    • @RSLive
      @RSLive  11 месяцев назад

      By Next Year

  • @SushilKumar-m3i4g
    @SushilKumar-m3i4g 9 месяцев назад

    Jai Mata di

  • @Canirequestu
    @Canirequestu 6 месяцев назад

    Mr.Rajan , you gave an update on Delhi Katra Expressway 6 months ago, after that if no information about it came on your channel, then please tell us. Will you give information about it or not?

  • @adityakumarshukla1769
    @adityakumarshukla1769 Год назад +1

    Thank you Modi ji 🎉🎉❤❤❤....

  • @ARVINDJAISWAL10
    @ARVINDJAISWAL10 Год назад +1

    Futuristic expressway.

  • @MajharulIslam-j3x
    @MajharulIslam-j3x Год назад +4

    West Bengal Mee koi project hoo Raha hai kya ?? Please answer sir

    • @Samirkhapa
      @Samirkhapa Год назад

      Please sir?😢

    • @Majharul-zj8po
      @Majharul-zj8po Год назад

      West Bengal ka project ?????????

    • @MajharulIslam-lt2qu
      @MajharulIslam-lt2qu Год назад +1

      Yes sir ❤❤

    • @Khapachopra
      @Khapachopra Год назад

      Please answer loading........ ??

    • @Majharul-qf3gi
      @Majharul-qf3gi Год назад

      Please Please please please please please please please please please please please please please please please sir

  • @khalsasikhpunjabda
    @khalsasikhpunjabda 9 месяцев назад +1

    2 lanes on each side cannot have a speed limit of 120. For 120 atleast 4-6 lanes each side are required.

  • @BalbirSingh-sz9wg
    @BalbirSingh-sz9wg 11 месяцев назад

    Brother beautiful bedio thanks

  • @starssports141
    @starssports141 Год назад +5

    JAY SHREE RAM 💪🇮🇳

  • @ROYAL-TIGER-7
    @ROYAL-TIGER-7 Год назад +2

    Ahmedabad Mumbai bullet train project Dikhao Na bhai

  • @PartapsinghAulakh-i2v
    @PartapsinghAulakh-i2v 6 месяцев назад

    ਇਸ ਦੇ ਨਾਲ ਨਾਲ ਰੇਲਵੇ ਲਾਈਨ ਵਾਰੇ ਵੀ ਦਸਿਓ ਪੁਰੀ ਜਾਂਨ ਕਾਰੀ ਦਸਿਓ

  • @gauravjangra8603
    @gauravjangra8603 Год назад +1

    I was really waiting from months

  • @PallaviBansal-p6e
    @PallaviBansal-p6e Год назад +3

    Super bro ❤❤

  • @bhupindersaini5426
    @bhupindersaini5426 10 месяцев назад

    Bhai sab Amritsar Ludhiana ke
    Ring road ka Video banaa ke
    Dikhao (Chandigarh ka v)

  • @mehtapramod23
    @mehtapramod23 Год назад +3

    WE NEED MINIMUM 1 LAKH KM MULTIMODAL MULTILATERAL EXPRESS WAY IN NEXT 5 YEAR IF WE WANT TO BE SUPER POWER UP TO 2047

  • @Canirequestu
    @Canirequestu 7 месяцев назад

    Brother, you have not forgotten this highway, do not forget to update it again 😅

  • @nreworld
    @nreworld Год назад

    thanks . kindly update video recording date in title . its very helpful ..

  • @amitkumarsahu282
    @amitkumarsahu282 Год назад

    Bhai ji expressway hai vo RCC hota hai ya bitumen ka hota hai

  • @Shubhampassi
    @Shubhampassi 7 месяцев назад

    Hi, Please provide latest update on DK expressway on haryana section.

  • @Aayusharts-c
    @Aayusharts-c Год назад +1

    भाई सर्दियों में शूटिंग कर रहे हों क्या ❤❤

  • @bobby9897
    @bobby9897 Год назад +2

    Jalandhar ring road ka bhi update dedo please ❤

  • @Fromharyana0001
    @Fromharyana0001 Год назад

    Bhai ma Gumana gao ka he hu
    Ya allmost kb tk chalu ho jaya ga

  • @deveshkumar2533
    @deveshkumar2533 Год назад

    Ram Ram bhai 🙏

  • @dhatt5
    @dhatt5 7 месяцев назад

    Please update ludiana jalandhar Gurdaspur section!

  • @deepakbhamre1994
    @deepakbhamre1994 Год назад

    Delhi mumbai Expressway ka mp ka section suru ho gaya hai usaka bhi update dijiye

  • @abhinavsharma-jg3xt
    @abhinavsharma-jg3xt Год назад

    Bhai ye kabh tak complete hojayega jammu tak

  • @Umapathihm
    @Umapathihm Год назад

    Super informative video

  • @shivamgargas6915
    @shivamgargas6915 9 месяцев назад

    Please provide the latest update for the same expressway

  • @sahni148
    @sahni148 7 месяцев назад

    Service line vi sath me?

  • @NikhilMali0001
    @NikhilMali0001 Год назад +1

    नितीनजी गडकरी जैसा व्हिजन रखने वाला pm भारत को मिले 🔥🙏

  • @paramkumar7078
    @paramkumar7078 11 месяцев назад

    Saath saath location name bhi btate to acha hota

  • @singraimurmu6232
    @singraimurmu6232 Год назад

    Nice🌹🌹👍 video bro👌

  • @ramanline
    @ramanline Год назад

    We eagerly wait for ur videos

  • @dragonballz3749
    @dragonballz3749 Год назад

    Sir jammu section pe bhi video update kro sir 🙃

  • @maneshdev1918
    @maneshdev1918 Год назад

    Excellent update 👍

  • @hirenbariya5235
    @hirenbariya5235 Год назад +2

    What about Amritsar-Jamnagar express way

    • @vdomukeshswami7830
      @vdomukeshswami7830 Год назад +1

      राजस्थान में पुरा बनकर शुरू हों चुका है भाई , अब सिर्फ पंजाब और गुजरात का ही कुछ हिस्सा बाकी हैं जो दीपावली तक एकदम कम्पलीट हो जाएगा

    • @kartoosjat
      @kartoosjat Год назад

      ​@@vdomukeshswami7830rajasthan me bahut kaam bacha hai abhi hanumangarh district me

    • @vdomukeshswami7830
      @vdomukeshswami7830 Год назад

      @@kartoosjat सिर्फ बॉर्डर वाला ही है भाई पंजाब और गुजरात के नजदीक वाला

    • @kartoosjat
      @kartoosjat Год назад

      @@vdomukeshswami7830 सिर्फ़ बोर्डर वाला नही भाई, संगरिया से लेकर पल्लू वाले कट तक 110km के हिस्से में बहोत काम बाकि है

  • @hardiksharma2329
    @hardiksharma2329 Год назад

    Sir please make video on Ujjain Mahakal Phase 2 Corridor

  • @paurushtyagi91
    @paurushtyagi91 Год назад

    Bhai ganga expressway ki video lekar aaao.

  • @NmNandlal
    @NmNandlal Год назад

    Bhai ek International project ground report dikha sakte ho kaladan multimodal transport corridor ke bare mein please please please

  • @nanhikaur3379
    @nanhikaur3379 Год назад

    Delhi walo ko isse kha se connect krna hoga.
    Please share the location name.

    • @kartoosjat
      @kartoosjat Год назад

      Haryana me jhajjar district ke jasor khedi gaon ke paas KMP expressway par aa kar yha se connect Krna hoga Delhi walo ko

  • @narendrasonineemrana6612
    @narendrasonineemrana6612 Год назад

    NH 352B दिल्ली जयपुर गीर्न फिल्ड सुपर एक्सप्रेस वे नया हाईवे पर एक विडियो दिखाओ

  • @SonaFunnyComedy
    @SonaFunnyComedy Год назад +1

    अरे भाई आप हमारे गांव के पास आए हुए चले गए भैया चाय पानी तो पीकेाते

  • @RajuKumar-xw5ul
    @RajuKumar-xw5ul Год назад

    Bhaiya khabhi bihar aa ke bakhtiyarpur to rajoli road ka update de do please

  • @sahilkhan-1999
    @sahilkhan-1999 Год назад

    🎉

  • @SNPABITRA
    @SNPABITRA Год назад

    Vizag express way ki update dekho bhai please

  • @ShivGarg-eu2yg
    @ShivGarg-eu2yg Год назад

    👌👌

  • @amrindergill7942
    @amrindergill7942 Год назад

    Aur bhai kesi chal rahi hai Election Campaign? 😀

  • @palasinghsandhujatsikh9929
    @palasinghsandhujatsikh9929 Год назад

    This Delhi katra express way should be Delhi Jalandhar Katra express way and it should pass near Sura Nasi village near Jalandhar city. Amritsar city is for away from this route. While linking Amritsar with this project not only destroy the importance of this entire project, but also destroy the importance of Jalandhar Amritsar express way. This road is very fine and big importance. So please immediately correct the route of the Delhi Jalandhar Katra express way. Jalandhar city which is the heart ❤ and Golden city of Punjab should not be bypassed and neglected. With very high hopes from you wish you all the best.

    • @kartoosjat
      @kartoosjat Год назад +2

      Ok boss main gadkari ko bol duga ki aapka alignment ek shyane ko psnd nhi aaya, isko change Karo aur apni survey team ki naukri bhi khaa jao jinhone feasibility report bna kar esa proposal bheja

  • @krushnarajput701
    @krushnarajput701 Год назад

    Delhi Mumbai expressway phase 2 open ho gaya hai uspe drive karo

  • @A_for_Amrit
    @A_for_Amrit Год назад

    5:00 how this shadow moving ? Is it drone

    • @dsachan1
      @dsachan1 Год назад

      It is cloud's shadow from above the drone. Cloud was moving in the same direction as the drone.

  • @RaviYadav-ry9zc
    @RaviYadav-ry9zc Год назад

    Sir Delhi to Jaipur super expressway ka update de

  • @ajit6483
    @ajit6483 Год назад

  • @himanshupandit_0
    @himanshupandit_0 Год назад

    pls allow 2 wheelers also.

  • @adityabenwal
    @adityabenwal Год назад +1

    I dont like that this expressway, despite being called Delhi Katra expressway, does not have a single section in Delhi. Not even a few kilometres in the outer parts of Delhi.

  • @luckybarnwal2649
    @luckybarnwal2649 Год назад

    👍👍👍

  • @aakashraja9869
    @aakashraja9869 Год назад

    अच्छा वर्क h

  • @sagarjeevan9434
    @sagarjeevan9434 Год назад

    Waiting

  • @KislayaUpadhyay
    @KislayaUpadhyay Год назад

    Bro please also cover Jammu Kashmir part

  • @ManjeetSingh-lc6wd
    @ManjeetSingh-lc6wd Год назад

    ਆਨੇ-ਬਹਾਨੇ ਲਾ ਕੇ ਕੇਂਦਰ ਪੰਜਾਬ ਦੀ ਉਪਜਾਉ ਜਮੀਨ ਹਥਿਆ ਰਿਹਾ ਹੈ।ਇਸ ਦਾ ਪੰਜਾਬ ਦੀ ਕਿਸਾਨੀ ਨੂੰ ਕੋਈ ਫਾਇਦਾ ਨਹੀ ਹੋਣਾ।

  • @pranjuldwivedi9382
    @pranjuldwivedi9382 Год назад

    Ganga expressway ka update

  • @ad534
    @ad534 Год назад +1

    Just 2 lane expressway how can it called expressway itna to hmare gaav mai bhi itni chaudi road hoti hai it should be 3+3 lane each side even in beginning

    • @kartoosjat
      @kartoosjat Год назад

      Quality ka fark hai bhai isme aur tere gaon Wale me

    • @ad534
      @ad534 Год назад

      @@kartoosjat vo road expressway nahi hai lekin is expressway ki quality to sabko pata hai ek hi baarish mai road dhas jaata hai vo gaav ka road 20 saal se kuch nahi hua

    • @kartoosjat
      @kartoosjat Год назад

      @@ad534 o bawlibuch, isko ban to Jane de tu pehle hi certificate Dene lag gya.
      Bundelkhand wale ki tarh mat smjh liyo isko jo dhans jayga

  • @mahavirsingh1768
    @mahavirsingh1768 Год назад

    Bhai jagah ka naam kon batayega bina on mark ya jagah bina apka video bekar h

  • @harshvardhansinghchauhan4130
    @harshvardhansinghchauhan4130 Год назад

    Music bahot bekar lagaya hay abki baar thoda soothing lagaya karo

  • @yourViveksharda
    @yourViveksharda Год назад

    Mujhe aisa q lag rha h ki desh 2014 me aazad hua h

  • @OmarGrajeola-ve4de
    @OmarGrajeola-ve4de 10 месяцев назад +1

    The 😊 ideas future translation trans sustentablely go India franforme these grant places life all can you want and wish

  • @OmarGrajeola-ve4de
    @OmarGrajeola-ve4de 10 месяцев назад

    Idea when come first 🌧️ rains way water cement destroyed cure not planification laigh bye

  • @vetofficial
    @vetofficial Год назад

    Hlo

  • @tipusingh2893
    @tipusingh2893 Год назад

    Jai bhim

  • @kirankm2050
    @kirankm2050 Год назад

    Ithni saare quantity me mitti kaha se lathi hai NHAI to give elevation to express way?

  • @ashusharma3193
    @ashusharma3193 Год назад

    Bhai ye loksabha election se pehle inaugurated ho jayega... as per transport minister and Spider man Shri Nitin Gadkari ji

  • @rs05041986
    @rs05041986 7 месяцев назад

    Hello sir
    Are you sure that at connecting point of Delhi Amritsar Katra expressway and kMP there is trumpet interchange OR clover leaf junction with toll entry exit
    Please drop your number I have an enquiry

  • @poddarhouse
    @poddarhouse 11 месяцев назад

    Sir your Videos are very informative. Keep up the good work.
    My question is:
    Sir whats the status of NE4 between Lalsot to Jhalwar ?
    Is it operational road from Sohna to Thandla now ? Or else Lalsot to Jhalwar is missing yet to be open?
    If its yet to be open then whats the current status?
    I checked all your videos but this was missing, if you have made any video on this please share link.
    Thanks and once again keep up the good work.
    Dtd 22.10.23

  • @MrVarun11
    @MrVarun11 11 месяцев назад

    Jai mata Di

  • @naitikvishwakarma1816
    @naitikvishwakarma1816 Год назад

    🎉