Cable installation for the Gemini Offshore Wind Park

Поделиться
HTML-код
  • Опубликовано: 2 окт 2024
  • Cable installation for the Gemini Offshore Wind Park

Комментарии • 13

  • @lpmj2619
    @lpmj2619 3 года назад +1

    I didn’t think they would be able to explain that in three minutes. Awesome. Thank you. Great break down.

  • @oliversparks1459
    @oliversparks1459 3 года назад +1

    Was the Rov on Port Aft Used or was it Just on Standby

  • @GeoffreyEwen
    @GeoffreyEwen Год назад

    How are each generator connected to the main network

  • @puhnpicker
    @puhnpicker 5 лет назад

    Hier hoort een verhaal bij anders hebben leken geen idee waar dit over gaat. Prachtige beelden !

  • @Hjfrddd
    @Hjfrddd 4 года назад

    About how long is the range for the Van Oord Nexus (greatest distance travelled within the endurance of the vessel)? How long would they be working on laying these cables before heading back to port to refuel and replenish supplies?

  • @nandukumarraj6441
    @nandukumarraj6441 6 лет назад +1

    Great work🌍🌎🌏

  • @tapashchatterjee3512
    @tapashchatterjee3512 7 лет назад

    Installation Of The SubMarine Cable...A MUST WATCH

  • @ela7895
    @ela7895 6 лет назад

    Amazing

  • @mddulal2697
    @mddulal2697 3 года назад

    Bosn

  • @owenshen666
    @owenshen666 5 лет назад

    We are the manufacturer of such submarine cable