I would like to know that 1. how can you determine the crane capacity 2. If it is a running river with a single span of 40m, what is the methodology for girder launching on Abutments directly. Pl note no pier at centre of the running river. 3. How can you check the Camber of the Girder when it is supplied to the contractor 4. What are the tests to be done on reemed piles driven for a depth of 14m. 5. What is the layout and arrangements for crossing the running river of 40m wide 6. Crane position to launch girder 7. What is the methodology for placing formwork to cast in situ Deck slab with embedded systems If you cover all these details it will be helpful to the learning personnel. I will appreciate, if I get the information on the above points Thanks
@@harshrohilla4962 Jish iron ma Steel ki matar jada hoti hai us use karte hai steel ma Jang nhi lagat hai or life jada hoti hai kharab jaldi nhi hota bhai is liye steel use karte hai
Sir steel girder me kaun2 se steel structure use kiya jata hai aur kis dimention ka..i mean channel angel section ye sab plz bta dijiye, ek qus aur kya hum ise revet joint krte hai ya nut bolt..
Sir Mujhe puchna tha Jo yah buliding construction aur bridge construction hota hai inmein क्या-क्या difference hota hai aur क्या-क्या difficulty ka samna karna padta hai Hamen aur feature Kya Hai donon mein Kuchh bata sakte hain aap
Building construction ap ka substructure hai aur bridge construction ap ka superstructure hai Bridge construction chalege bahot rahta hai Aur ap ki salary building construction se jada rhti hai but vacancy Kam rahti hai
This is master torque bolting experts We are providing our bolting services in afcon, snc , ITD company in Bengaluru if you have a bolting job please let me know
All workers are not in PPEs at site. The Rigger person is standing unsafe . He should maintain the distance from lifting area They should be in Safety Belt while working at height
This isn't the correct process of lifting...atleast 2 cranes must be used to lift this length of girder...do they have proper lifting plan or not....🤔🤔🤔
Jaha span length ek limit se jyada hoti h waha iron garder lagaya jata h,,, aap ye galat kah rahe h ki pure bharat me iron gurder hi lagaya jata h,, aap jo pull cast kar rahe h uske pass wala hi cement wala h,,
facebook.com/jatinsaini70/
Follow on Facebook
Demolition of bridge me kitna dino ka block lgta hai train ko?
I Bridge ki video dekhna Achcha Lagta Hai Jab Bhi Hoga aise hi video dikhana thank you
Good launching in position of steel girders . Load testing how to possibal .nice pic & clerification .shoe technical points.
Sir trapezoidal footing mai top mesh ka BBS kaise nikalay
Sir ye lounching to humne kri h Ambala site ✌️✌️thanx for it
bhia ye lounching ka kam karte ho to hmare pas kam hai ager kroge to
@@amankamboj646 please sir your contact no
What was the weight of steel girders
Can u explain about various type bearing? And which kind of bearing are you used there? & why?
काशीपुर उत्तराखण्ड में bow string girder bridge को launch कर दिया है और jack द्वारा bearing पर फिक्स करना बाकी है
2hours block ke bad crane ka position change karte hai kya
I would like to know that
1. how can you determine the crane capacity
2. If it is a running river with a single span of 40m, what is the methodology for girder launching on Abutments directly. Pl note no pier at centre of the running river.
3. How can you check the Camber of the Girder when it is supplied to the contractor
4. What are the tests to be done on reemed piles driven for a depth of 14m.
5. What is the layout and arrangements for crossing the running river of 40m wide
6. Crane position to launch girder
7. What is the methodology for placing formwork to cast in situ Deck slab with embedded systems
If you cover all these details it will be helpful to the learning personnel.
I will appreciate, if I get the information on the above points
Thanks
Ak dusre ke saath jornekeliye konsa nambar use karte ho bataye sir 1 2 3 kaise
Why we use steel girders in railway crossing?
Beacuse less chance of accident. Duly train passes throw railway track
steel griders hi kyu iron ka griders kyu nhi use kiya
@@harshrohilla4962 Jish iron ma Steel ki matar jada hoti hai us use karte hai steel ma Jang nhi lagat hai or life jada hoti hai kharab jaldi nhi hota bhai is liye steel use karte hai
Sir, how much time(hours) was taken for launching those 6 girders???? Please tell... Thanks in advance
Nice👍👍👍👍
Where do we get these type of steel girders in Andhra Pradesh and Hyderabad please give me address
Best 👍🏻👍🏻👍🏻
Thanks for Good Information
Good video lakin safty ka khyal nai rakha gya hai aadmi girder ke neche ghum raha hai
Sir steel girder me kaun2 se steel structure use kiya jata hai aur kis dimention ka..i mean channel angel section ye sab plz bta dijiye, ek qus aur kya hum ise revet joint krte hai ya nut bolt..
Bolting ayese nhi ki jati hai according to bs111 code first of all using drift and not using directly HSFG bolt
Bich k part me cross girder kese lagenge
Bearing plate ka link shar kariye sir
Sir Mujhe puchna tha Jo yah buliding construction aur bridge construction hota hai inmein क्या-क्या difference hota hai aur क्या-क्या difficulty ka samna karna padta hai Hamen aur feature Kya Hai donon mein Kuchh bata sakte hain aap
Building construction ap ka substructure hai aur bridge construction ap ka superstructure hai
Bridge construction chalege bahot rahta hai
Aur ap ki salary building construction se jada rhti hai but vacancy Kam rahti hai
Sir steel girder ka wait or length bataiye please
This is master torque bolting experts
We are providing our bolting services in afcon, snc , ITD company in Bengaluru if you have a bolting job please let me know
Psc गार्डर की लम्बाई अधिकतम कितनी फूट तक होती है
Supr ❤
maine ye kaam kiya hai global steel company me
railway gurder bahot kiye hai
Aapke paas steel girders banaane wale worker ha kya
Amazing
Sir please explain staircase assembling for FOB in Railway station.
ব্রেশিং কী ভাবে লাগাবো
Railway overbridge ka beas plate kaise change karte hain
Plise bideo dale
After girder launching caution order can be immediately removed yes or no
nice sir je
All workers are not in PPEs at site.
The Rigger person is standing unsafe .
He should maintain the distance from lifting area
They should be in Safety Belt while working at height
Why steel girders on railway track
Sir mujhe job chahiye
aap gov. engg ho bhai
Railway ke ऊपर कंक्रीट गर्डर क्यों नहीं होता।
Cracking problem & weight problem
isame Kam Kiya hau
BEARING Ka name bhi bta diya Kriye Sir
Elastomeric Barring h ye
This isn't the correct process of lifting...atleast 2 cranes must be used to lift this length of girder...do they have proper lifting plan or not....🤔🤔🤔
Top jio nice very nice Kolkata very good very good 👍👍👍👍,🌉🌉🌉🌉🌉🇮🇳🇮🇳🇮🇳💐💐💐👍🏼👍🏼💓💓💓💓
Thank you very much
No Helth & Safety!
Apna sand kijiye
Jaha span length ek limit se jyada hoti h waha iron garder lagaya jata h,,, aap ye galat kah rahe h ki pure bharat me iron gurder hi lagaya jata h,, aap jo pull cast kar rahe h uske pass wala hi cement wala h,,
rail line ke upar most of the time Steel Girder hi lagaya jata hai
Ambala Bridge
job
mera Desh Badal raha hai, Modiji ki agavaai me.
Abe chutiye modiji kya kia bhadwa?😂
The quality of the work looks so poooooooor
How 🤔
Amazing