Time-Lapse: First Tower Pile Cap Concrete Placement

Поделиться
HTML-код
  • Опубликовано: 13 дек 2024

Комментарии • 9

  • @dirtdawg5969
    @dirtdawg5969 4 года назад

    Got to be apart of this great build from this pour to actually lighting up the bridge put food on the table for 6 whole years. Feel the power!

  • @chennareddyindla2349
    @chennareddyindla2349 3 года назад

    Very very good work.

  • @LeoChiu229
    @LeoChiu229 3 года назад

    Wow, AWESOME! 👍✌️🦉.

  • @thefabulousgreenbean2194
    @thefabulousgreenbean2194 8 лет назад +1

    Thank you for these videos!! Beautiful job!

  • @madymagpile7537
    @madymagpile7537 9 лет назад +2

    Imagine getting all the rebar detailed and ironworkers putting them exactly In place, then culminating with a massive concrete pour. Feel the excitement beginning at the first hour then into the final finish.

  • @TheManny717
    @TheManny717 9 лет назад

    Now that's the true definition of working together. :)

  • @bowenimaginepeace
    @bowenimaginepeace 9 лет назад

    That was amazing!

  • @danokeefe4975
    @danokeefe4975 9 лет назад

    I would love to see the preparation for the foundation itself. How far did they have to go, walls, etc.

    • @LinwoodPowell
      @LinwoodPowell 8 лет назад

      The website said that they had to drill down 190 ft into the ground