  • @govardhangujja1653
    @govardhangujja1653 4 года назад +4

    Good explanation 🤙🏾🤙🏾🤙🏾🤙🏾 please upload more videos in detail and show each and every thing how the work is done in actual field

  • @marianahauwanga8258
    @marianahauwanga8258 3 года назад +1

    Very useful lectures.. thank you much Mr. Koundal

  • @harisht45
    @harisht45 5 лет назад +3

    Thanks for the video . In the city of visakhapatnam they started these underground power wires so wanted to know they do it.

  • @AbdulMajeed-hx4jv
    @AbdulMajeed-hx4jv Год назад

    Nice information

  • @michaelwilson4316
    @michaelwilson4316 11 месяцев назад

    Ive nearly 20yrs in cable pulling for f b taylors..ripon north Yorkshire..i am wanting to work for some other firms??

  • @gnesoidomarson1966
    @gnesoidomarson1966 5 лет назад +3

    is the procedure same for 33kv ug cables? can someone confirm if the depth should be 1.5m or 2m

  • @AnilSingh-po3it
    @AnilSingh-po3it 5 лет назад +4

    What is specification of HDPE pipe. Can we have use HDPE
    6KG/CM2 PIPE.?

  • @zeeshanazfar6606
    @zeeshanazfar6606 5 лет назад +2

    Fine..
    But after docketing done..we should put a electric cable below cautionary yellow colored tape just above the soil
    But that yellow tape should be at least 0.2 to 0.3 mtr. Below from top surface...
    It us being used..when and excavation work started..during excavations..firt this yellow tape will appears .and excavator will know ..that there is electric cable is burried here..

  • @nishantgupta365
    @nishantgupta365 3 года назад +2

    You have kept the Cable drum in the wrong position, Cable should come from the upper side.

  • @rajusamprak
    @rajusamprak 5 лет назад +2

    Dear sir please tell me what is bending radius of 300sqm underground cable

  • @constructiontechinfo9237
    @constructiontechinfo9237 5 лет назад +2

    Can anybody say the rate for Ofc cable laying rate per mtr,

  • @luaking84
    @luaking84 6 лет назад +11

    "Laying the cable" in the UK means taking a dump. Rimming means something a bit different.

  • @KanthKing
    @KanthKing 5 лет назад +3

    Can 66KV lines be made underground ?? What is the cost? anyone can provide estimate?

  • @Shaidy106
    @Shaidy106 2 года назад +1

    Sir ,I also want to work in this sector ,i have an experience of 1year. How can I apply for this job sir
    Please reply me sir

  • @alagarsami9683
    @alagarsami9683 4 года назад

    Super

  • @mahevishshaikh3205
    @mahevishshaikh3205 3 года назад

    Lnt andargrund ke liye contrectar Chahiye the Visakhapatnam leliye Kiya aap desakte ho

  • @maintenancetutorialprocedu3417
    @maintenancetutorialprocedu3417 4 года назад +1

    where is the safety marking for the cable. you were very good with you explanation but you missed lot of points and safety standard.

  • @sivakumar-gr3tw
    @sivakumar-gr3tw 6 лет назад +4

    Can you provide the details like how much it would cost to dig a line of 1 meter depth and 0.5 meter wide per meter.

  • @rakeshprajapati-ns7se
    @rakeshprajapati-ns7se 6 лет назад +1

    Sir Kya 33kv line Mai underground cable laying karni hai uska ground level SE kitana ander dalana hoga

  • @koensupriatna
    @koensupriatna 4 года назад

    Thank you for the knowledge let's share together
    Thanks for knowledge. Let sharing together for mv line 20 kv

  • @smrutiranjanbiswal
    @smrutiranjanbiswal 5 лет назад +5

    For Open Trenches Warning Tape Should provides as safety measure

  • @rajelectricalguru6412
    @rajelectricalguru6412 2 года назад

    Sir, how to apply in BSES company?

  • @ShahbazAhmad-mc2bx
    @ShahbazAhmad-mc2bx 7 лет назад +1

    warning tape to dala hi nhi sir jee or brick ki jagah pe tiles use kiye proper size ka

    • @Follow_lslam
      @Follow_lslam 6 лет назад

      han hai lakin warning tap dalty hain pipe k auper 20cm k auper

  • @Veeru4310
    @Veeru4310 5 лет назад +2

    I'm also virendra.. Nd doing electrical engg..

  • @_your.aditya_
    @_your.aditya_ 7 лет назад +2

    Nice

  • @prashanthgaitonde3451
    @prashanthgaitonde3451 2 года назад

    best video

  • @sahils9306
    @sahils9306 7 лет назад +1

    sir underground ke bare me pura video stap by stap kyse milega Hindi me
    plz reply sir

  • @idreeskhan1015
    @idreeskhan1015 5 лет назад +1

    Dear Sir . The cable Drum installed wrong side its type pulling wench matchin take to much kilo nuttin.

  • @showketbhat3200
    @showketbhat3200 2 года назад

    Sir 200 fit chaya

  • @johnresolme2126
    @johnresolme2126 6 лет назад +1

    1. no PPE''s. 2. no lubricant.

  • @shelleygold4923
    @shelleygold4923 3 года назад

    What is the purpose of this

  • @Telugupole
    @Telugupole 4 года назад

    How will be the career in trenching dezine jobs

  • @naturelover1407
    @naturelover1407 5 лет назад +2

    I want that machine

  • @PrahladKumar-bu3tc
    @PrahladKumar-bu3tc 3 года назад +1

    Trancher machine available for lyaning ofc and Telecom wire and railway wire and taar

  • @RohitSharma-rs3dg
    @RohitSharma-rs3dg 3 года назад

    Y in india people dig roads every time to put cables.. And why in abroad they dont need to dig roads for cables ??? Y can we can plan cities the se way so we dont have to dig roads everytime ???.. Y r we so unplanned ???

  • @joychacko1407
    @joychacko1407 Год назад

    No warning tape🤔

  • @AkashAkash-yp2gj
    @AkashAkash-yp2gj 4 года назад

    My name akash g polycab India suppervaisar thamil nadu

  • @rahulgupta-jj9xy
    @rahulgupta-jj9xy 6 лет назад +1

    Molig bolte hai sir

  • @VinodSharma-dj6yv
    @VinodSharma-dj6yv 2 года назад

    Thanks sir

  • @prakasavelraju4027
    @prakasavelraju4027 3 года назад

    Warning tape must for open trench

  • @mitv7139
    @mitv7139 3 года назад

    Hyderabad me royeto bolo work karatahu lebar amarea pass aye apka call no rako mit karatahu