Overhead Bridge Crane Replacement | 35-Second Project Reel

Поделиться
HTML-код
  • Опубликовано: 8 сен 2024
  • When a power plant was damaged in a fire in northeast Pennsylvania, JGM stepped up to the challenge to get the plant back up and running. The JGM team removed and replaced a 100-ton overhead bridge crane as well as completed all roofing and electrical work in four short weeks. Watch this 35-second project reel to see highlights from the jobsite!
    JGM has mastered every phase of the industrial construction process in several diverse markets, from planning and design to scheduling and ongoing monitoring. Offering comprehensive construction services using state-of-the-art technology, JGM is proud of the reputation they’ve built for relentlessly delivering the highest quality structures on time and on budget, always with uncompromising safety at the forefront. When you need it yesterday, call JGM. In construction, we get it done.
    Connect with us online here:
    Facebook: / jgmconstruct
    LinkedIn: / jgmusa
    Instagram: / jgm.usa
    Website: jgmusa.com/
    Sign up for our newsletter here: jgmusa.com/new...

Комментарии •