  • A non-conformance report, or non-conformity report or NCR, is a construction-related document that addresses specification deviation or work that fails to meet quality standards. The report is used as part of quality control processes by detailing the problem, how it occurred, and how to prevent it from happening again. An NCR also is used in determining a resolution with a customer and documenting any corrective changes made.
    #the_complete_engineers
    #علم_ينتفع_به
    #serag_Elrashidy
    #Ahmed_amin
    #civil_engineer
    #Quality_control
    #علم_ينتفع_به

Комментарии • 15

  • @ahmedamin4385
    @ahmedamin4385 5 лет назад +8

    إحنا لازم نعمل NCR على الصوت

  • @zzz9876
    @zzz9876 4 года назад +3

    السلام عليكم ورحمة الله وبركاته
    أولا : نشكركم على المجهود الرائع وطريقة العرض الممتازة فى تقديم معلومات قيمة بأسلوب مبسط
    ثانيا: بخصوص الشرط الثانى لفتح NCR بأنه لا يجوز عمل NCR لعمل غير مكتمل فاسمحا لى بالإختلاف معكما فى ذلك فأرى أنه يجوز فتح NCR لعمل غير مكتمل فى حالات كثيرة جدا أذكر منها على سبيل المثال لا الحصر
    العمل بمادة مخالفة للإعتماد ( حديد تسليح - سيراميك - تربة دفان - رخام - دهانات ---------------------)
    مخالفة الأعمال للرسومات والأبعاد والمناسيب المعتمدة

    • @ahmedamin8962
      @ahmedamin8962 4 года назад +6

      فى هذه الحاله العمل اكتمل بالفعل انت ادخلت الموقع ووردت بالفعل ماده غير مطابقه

  • @Mohsen-zh1dn
    @Mohsen-zh1dn 5 месяцев назад

    السلام عليكم - جزيل الشكر والتقدير لمجهود حضراتكم - ممكن حضرتك ترفق صورة من ال standard اللي بتقول أننا لازم نسيب شيفتين او فتره معينة قبل رفع ال NCR.
    مع الشكر

  • @hebayousry1766
    @hebayousry1766 4 года назад +5

    لو سمحت عايزه ال reference بتاع ال ٤ شروط لاصدار ال NCR

  • @Mohsen-zh1dn
    @Mohsen-zh1dn 5 месяцев назад

    السلام عليكم - جزيل الشكر والتقدير لمجهود حضراتكم - ممكن حضرتك ترفق صورة من ال standard اللي بتقول أننا لازم نسيب شيفتين او فتره معينة قبل رفع ال NCRحاولت أدور عليها في
    ISO 901 ولكن مش لاقيها ، مع الشكر

  • @amradel3909
    @amradel3909 5 лет назад +3

    If there is an activity covered by another activity without being inspected from the consultant and the consultant make NCR, how can i close this NCR knowing that we can't inspect the covered activity.

    • @ahmedamin967
      @ahmedamin967 5 лет назад +4

      1st of all it depends on the level of inspection
      If the inspection level is H or hold point it means tha the consultant has the right to open Ncr
      And regarding to ur question , you can close the Ncr by testing
      For example you poured the concrete without rebars inspection make ultrasonic and so on

    • @hosamhamdy4270
      @hosamhamdy4270 4 года назад

      @@ahmedamin967 Can you kindly provide a reference for your reply?

  • @Mawlana-ns2wr
    @Mawlana-ns2wr Год назад

    كل حاجه في فيديوهاتكم حلو ماعدا الصوت

  • @mohamedabdelaziz6814
    @mohamedabdelaziz6814 6 месяцев назад

    طب لو سيفتى NCR
    ازاى اقفله ب WIR

  • @ahmedamin1267
    @ahmedamin1267 5 лет назад +1

    Use a headphone

  • @mooh115alharbi6
    @mooh115alharbi6 2 года назад

    لو موظف ارتكب مشكلة وانفتح فيها NCR ايه الضرر اللي بيحصل ممكن للموظف ارجو الاجابة ؟

  • @Mohsen-zh1dn
    @Mohsen-zh1dn 5 месяцев назад

    السلام عليكم - جزيل الشكر والتقدير لمجهود حضراتكم - ممكن حضرتك ترفق صورة من ال standard اللي بتقول أننا لازم نسيب شيفتين او فتره معينة قبل رفع ال NCRحاولت أدور عليها في
    ISO 9001 ولكن مش لاقيها ، مع الشكر

  • @Mohsen-zh1dn
    @Mohsen-zh1dn 5 месяцев назад

    السلام عليكم - جزيل الشكر والتقدير لمجهود حضراتكم - ممكن حضرتك ترفق صورة من ال standard اللي بتقول أننا لازم نسيب شيفتين او فتره معينة قبل رفع ال NCRحاولت أدور عليها في
    ISO 9001 ولكن مش لاقيها ، مع الشكر