40. Well control simulation , Simulator Control

Поделиться
HTML-код
  • Опубликовано: 27 дек 2024

Комментарии • 8

  • @brahimalgeria3208
    @brahimalgeria3208 5 лет назад +1

    شكرا جزيلا أستاذي العزيز على كل هذه المجهودات .

  • @letslearntogether1198
    @letslearntogether1198 5 лет назад

    Great Sir!
    It is really amazing video and I've learned good content from this video

  • @khelifabeddief6980
    @khelifabeddief6980 4 года назад

    Thanks great job we need more sir

  • @rebinsherwany1837
    @rebinsherwany1837 2 года назад

    Hello dear abdelaziz gabr ,i have watched all of your lectures of well control ,and I would like to express my sincere graduated for teaching me this course God protect you inshala. I would be delegated as well if you could share your well control PDF with me .

  • @nidharm3953
    @nidharm3953 5 лет назад

    put some vdo about bottom hole assembly sir.

  • @Noxyy9999
    @Noxyy9999 3 года назад +1

    The hard shut in is wrong . He opened the remote choke which is suppose to be in closed position.
    He should open the HCR not the remote choke
    Step 1 .. space out the drilling string .
    Step 2 stop the pump
    Step 4 : close BOP
    Step 5,: open HCR
    Step 6 record data.
    Note the remote choke is already in closed position in hard shut in.

  • @waqasmehmood9047
    @waqasmehmood9047 4 года назад

    He is nawaz from pakistan