HS2 Chiltern Tunnel North Portal

Поделиться
HTML-код
  • Опубликовано: 20 дек 2024

Комментарии • 11

  • @mikehindson-evans159
    @mikehindson-evans159 7 часов назад +1

    An excellent update and thanks for the camerawork to capture this important historical document.

  • @KevinPowell-s6q
    @KevinPowell-s6q 12 часов назад

    Very interesting thank you and other peoples comments as well

  • @Jamie92208
    @Jamie92208 17 часов назад +2

    I just noticed in the distance that work on the trackbed to the north seems to have started.

    • @jermainetrainallen6416
      @jermainetrainallen6416 17 часов назад

      Work on the trackbed? Where?

    • @stevetony6876
      @stevetony6876  17 часов назад +2

      Yes, the digging has really started in earnest it seems. They've removed the temporary car park plus a cutting further up which has taken shape i noticed! :)

    • @Jamie92208
      @Jamie92208 16 часов назад +1

      Maybe so where for your next flight,the section from there north.

    • @jermainetrainallen6416
      @jermainetrainallen6416 15 часов назад

      @@Jamie92208 Oh you mean the cutting excavation?

    • @martinsloman6905
      @martinsloman6905 15 часов назад

      If you look at recent videos, there are clearly long stretches where excavation is down to track level. The next stage appears to be installing drainage. The track formation will probably consist of some compacted fill material on which they will lay the concrete slab track. It might not be until 2026 that work on the actual track will commence.

  • @martinsloman6905
    @martinsloman6905 15 часов назад +1

    Still plenty of work to be done here with the construction of the porous portal. All the same, most of the excavation has now been done and the cutting slopes have been grassed so they are well past peak civils.

  • @chrisgreen8803
    @chrisgreen8803 17 часов назад

    I’m going to be dead before I get to see any trains on it 😂