Lockout Tagout Training Video [Employee OSHA Training on LOTO]

Поделиться
HTML-код
  • Опубликовано: 24 ноя 2024

Комментарии • 60

  • @JohnDoeRando
    @JohnDoeRando Год назад +24

    Got an interview tomorrow and I'm brushing up on things. Thank you.

  • @thomasbacon
    @thomasbacon 5 лет назад +63

    One addition that should be made is when locking out hydraulic and especially pneumatic machinery. Not only do you have to check to ensure the stored energy is disapated, but it is also good practice to have a plan and procedure to ensure energy is not slowly built back up in the event of a bad valve. One method is to lock it out, disepate the stored energy, waiting a designated period of time, and then recheck to see if energy has leaked into the system. Other methods include gauges that allow visual observation, or installing or cutting in check valves with low pressure settings (ex. 1/10 the required pressure to operate the machinery).

  • @918kickinwing
    @918kickinwing Год назад +38

    I'm watching this video so I can fall asleep

  • @navidneda
    @navidneda Год назад +4

    to be honest, the best info video I have seen in my 13-year-old journey of being a mechanical engineer. Thank you!

  • @carloscasas2662
    @carloscasas2662 4 месяца назад

    Im interpreting a training camp this week and this seriously helped me so much. Idk if im 100% prepared but I sure as hell feel more prepared now than a few days ago. (They didn't provide me with any material to prepare myself)

  • @JJSafetyLLC
    @JJSafetyLLC 8 месяцев назад +1

    excellent training for anyone working with heavy machinery!

  • @AmyWalters-sf2kj
    @AmyWalters-sf2kj 10 месяцев назад +1

    Thank you Amy walters

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +3

    AFTER A LOCKOUT THERE MAY BE ENERGY? 1. HYDRAULIC: MOVE TAKES OR DRAINS, 2. ELECTRIC: GROUND, MOTORIZED: SPRINGS? THE MACHINE MUST BE ACTIVATED IN THE NON-ENERGIZED EQUIPMENT?

  • @chepypermana2425
    @chepypermana2425 4 года назад +2

    thanks for the sharing information.
    also along the pipe require to release vua drains syatem for any liquid and venting line any pressure inside of facility prior to maintenance and do repaire activity to get safe.

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +4

    IN A RESTART THE LOCKOUT PROCEDURE SHOULD BE DONE AGAIN?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +3

    CAPACITORS HAVE TO BE GROUNDED IN ELECTRICAL?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад

    WHEN FINISHED THE LOCKOUT EQUIPMENT SHOULD BE RETURNED TO THE LOCKOUT EQUIP!ENT AREA?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +1

    ELECTRICAL: SWICTHED ON S CAN CAUSE EXPLOSIONS THROUGH ARCS STAND TO THE RIGHT SIDE OF A SWITCH AND THROW IT?

  • @janetcurry1069
    @janetcurry1069 3 месяца назад

    Very informative.

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +1

    TAGGING THE MACHINE TELLS OTHERS THE MACHINE IS BEING WORKED ON?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +3

    THE FACILITY MUST HAVE IN WRITING LOCKOUT PROCEDURES AND TRAINING MARKERS?

  • @KEISHINZAN
    @KEISHINZAN 2 года назад +2

    Thank you so much for your reporting !

  • @overdose956
    @overdose956 2 месяца назад

    Reading about the tragedy at schlitterbahn in 2013 where the company was at fault because they didn’t follow this step after the employee passed. Smh

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад

    THERE MAY BE ENERGY IN ELECTRICAL LOCKOUT LIKE ARC FLASHES LIKE AN ELECTRICAL.EXPLOSION FROM CONNECTION WITH OTHER PARTS OF GROUND?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +2

    WHEN CONTRACTORS ARE WORKING ON MACHINES THEY SHOULD CHECK WITH SUPERVISORS?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +1

    ONCE ELECTRICAL EQUIPMENT IS OFF IT WILL NOT MOVE?

  • @LoneNazgul
    @LoneNazgul 5 лет назад +5

    this is very useful

  • @ronjacksore6361
    @ronjacksore6361 2 года назад

    Thomas Stone, well stated advice!

  • @oyewusivictoroladimeji7023
    @oyewusivictoroladimeji7023 3 года назад +4

    great video. so educative

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад

    HYDRAULIC REQUIRES DOWNSTEAM SWITCHES AND BLIND SPOTS IN THE LINE TO DRAIN DOWNSTREAM?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +1

    NEUMATIC DRAIN THE AIR?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +2

    AFTER THE STOP OF MOVEMENT THE LOCKOUT TAG AND LOCK IS APPLIED?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +1

    THE LOCKOUT TAGOUT EQUIPMENT WILL BE PROVIDED? NOTHING ELSE CAN BE USED?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад +6

    THE TAG SHOULD REMOVED BY THE SAME EMPLOYEE THAT TAGGED THE MACHINE?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад

    TO KEEP EMPLOYEES FROM REENERGIZING A MACHINE THS,AT IS,BEING REPAIRED IS LOCKOUT?

  • @airlinemanagement1676
    @airlinemanagement1676 3 года назад

    GROUPS WORKING ON MACHINES CAN ASSIGN ONE EF MPLOYEE PER GROUP?

  • @Pizzacat345
    @Pizzacat345 2 месяца назад

    Tuesday is my 3rd day

  • @Funkinforevernight
    @Funkinforevernight 4 года назад +12

    0:39

  • @earlmcclain8488
    @earlmcclain8488 Год назад

    One lock one key

  • @Tickey
    @Tickey 3 года назад

    Yo

  • @David-yi2be
    @David-yi2be 3 года назад

    dang

  • @MuhammadRizwan-cw9fe
    @MuhammadRizwan-cw9fe 2 года назад +1

    2:50 lockout taggout devices

  • @Bram45639
    @Bram45639 3 года назад +3

    Wait what did I just watch

    • @connoregan2874
      @connoregan2874 3 года назад

      A workplace training video.

    • @Bram45639
      @Bram45639 3 года назад +6

      @@connoregan2874 bro I freal watched the whole 20 mins of this and I don’t even have a job and never had

    • @mountaindistancestrider6855
      @mountaindistancestrider6855 3 года назад

      lock out tag out typically done on damaged machines or to keep prying hands off so your not going threw fast shock training to free the victims

    • @Bram45639
      @Bram45639 3 года назад +1

      @@mountaindistancestrider6855 lol I accidentally watched the entire thing and I have no need too

  • @JoseBrown-t3k
    @JoseBrown-t3k Месяц назад

    Erling Parkways

  • @KaciBaumgarner-i4d
    @KaciBaumgarner-i4d Месяц назад

    Annamarie Forge

  • @r.coburn3344
    @r.coburn3344 5 лет назад +1

    WWC electric leave a comment to represent.

  • @РодионЧаускин
    @РодионЧаускин 2 месяца назад

    Lee Shirley Williams Shirley Hall Ruth