  • This is one of my learners practicing his live and dead tests as part of a training aid for his classmates. The video will be used to provoke class discussions on best practice. Please remember this learner is working towards his qualification and is not currently registered as a Part P domestic installer. The installation with be tested again by his QS and notified through the correct channels.
    In this video we change a consumer unit sometimes called a fuse box and carry out live and dead testing.
    Videos are training aids for City and Guilds (C and G) and EAL courses Level 1, 2, 3 plus AM2, AM2S and AM2E.
    You can follow me day by day on Facebook, Instagram and Twitter lookout for "GSH Electrical.
    ▶️ FACEBOOK / gshelectrical
    ▶️ INSTAGRAM / brihzmraygdtmjmdb9lunq...
    ▶️ TWITTER / gsh_electrical
    #GSHElectrical #Electricaltrainingvideos #electricaltesting

Комментарии • 136

  • @rusrus29
    @rusrus29 5 лет назад +34

    I could watch GSH Electrical & John Ward Videos, all day long! ..find them so fulfilling and educating .....outstanding stuff ! best on youtube ! Digital Pioneers for online education ..

  • @thomasrowland3682
    @thomasrowland3682 2 года назад +5

    For a visual learner, this is amazing! I appreciate you guys so much. I've got my AM2s in 2 days time , not sure what I would do without your vids

    • @GSHElectrical
      @GSHElectrical  2 года назад

      Good luck Thomas and a massive thanks for watching and the support. Gaz 👍🏻

    • @romi_3lk520
      @romi_3lk520 2 года назад +1

      How'd your AM2 go?

    • @thomasrowland3682
      @thomasrowland3682 Год назад

      @@romi_3lk520 i am now a qualified Electrician. Was not easy, only had to retake fault finding again but everything else first time.

  • @davidroche6973
    @davidroche6973 6 лет назад +16

    Great to see a step by step video in a real world environment

  • @MartiA1973
    @MartiA1973 6 лет назад +6

    One of the best; thank you guys. I'm just completing Level Three and ready to do something similar. Concise and quick. We can always re-watch in RUclips land so the fast presentation to fit in more useful information was appreciated.

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. It’s positive comments like yours that keeps me going... Sadly I get enough negative ones. Thanks for taking the time to message and support my channel Gaz

  • @iansmith1399
    @iansmith1399 2 года назад +2

    Best work working in factory as daytime maintenance. With competent team. Close bond with management. And owner.

  • @georginaking449
    @georginaking449 3 года назад +4

    This is so helpful thank you! I've got my practical exams coming up in the next few weeks and this is exactly what I needed!

  • @aghadimi12345
    @aghadimi12345 6 лет назад +3

    I am a registered Part P and soon going for my NICEIC assessment this was the most helpful video for me to refresh myself prior to assessment day and follow the steps.
    Thank you

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. Thanks for the positive comment And all the best Gaz 👍

  • @daniboy0812
    @daniboy0812 Год назад

    Nice to see it done properly. Try working for a company who wants 3 seperate EICR's per day. Safe to say I informed NIC of their antics and shortcuts after I left

  • @alvinashman6371
    @alvinashman6371 6 лет назад +1

    Great job Marcus, the way in which you've dressed the board would put some electricians to shame. Gaz you should feel very proud.

    • @GSHElectrical
      @GSHElectrical  6 лет назад +2

      Hi. We try hard at my college but we are not always right. Remember this video is not totally perfect but will raise talking points for his fellow classmates as we look to put into practice our training. Marcus was under pressure for 6 hours during the filming of this video and I think he gave a great account of himself. Thanks for the support Gaz

    • @XXxMakDeeZiLxXX
      @XXxMakDeeZiLxXX 6 лет назад +2

      I am making a career leap into this field after 2years of study. Remarkable work guys, I have just finished y lv3..booked in to do 18th edition also. Markus looked impressive in explaining everything he was doing. Top marks to you all...great presentation. I can't even begin to recall those correct sequences/processes as he did...well done.

  • @quadrantheatingelectricspl2907
    @quadrantheatingelectricspl2907 4 года назад +1

    Thank you for all the hard work to make this detailed video. Cheers Gaz

  • @thomasmcclennon9738
    @thomasmcclennon9738 4 года назад +1

    You're a very knowledgeable student. Well done to you.

  • @vhsable
    @vhsable 6 лет назад +2

    This is one of the best vids ive seen so far, well done lads

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi thanks. It will be used to provoke discussions in my classroom on best practice for testing and should we carry out live Zs testing etc. All the best GSH Electrical

  • @cjmillsnun
    @cjmillsnun 5 лет назад +5

    Silly question. When the CPC continuity was done on the cooker circuit, he then went to test polarity by operating the isolator. Isn't that a double pole isolator? Therefore even if the polarity was incorrect and the line was actually the neutral, there would've been a break in continuity by operating the isolator.

  • @keithjohnstone9889
    @keithjohnstone9889 6 лет назад +2

    Fantastic video. Lots of good information throughout. 👍

  • @Clydepatos2001
    @Clydepatos2001 6 лет назад +3

    You are very good teacher greatful job

  • @PlymouthSparky
    @PlymouthSparky 6 лет назад +5

    Nice and neat board, lovely job. Must take a fair bit of time to set up the cameras and do that sort of filming. Churning out some fine apprentices there Gary.

  • @paulmandara232
    @paulmandara232 6 лет назад +4

    Great videos about the testing procedure but could you try and do some fault finding videos using your multi function tester cheers keep the great videos

  • @A.Y.A
    @A.Y.A 2 года назад +1

    Excellent video Thank you very much

  • @paulmorrey733
    @paulmorrey733 5 лет назад +1

    Thanks to both of you

  • @lazzzylouis
    @lazzzylouis 3 года назад +1

    Nice job Marcus

  • @danwatson2495
    @danwatson2495 3 года назад +1

    Great video as always!

  • @albertsteptoe3710
    @albertsteptoe3710 5 лет назад +1

    I am with the you on this , as their was never ‘this much testing in my day and having just bought some new equipment and before my 18th I’m glad it’s something to rack the brains 20 years on .
    However their is a but and mine is theirs no way electricians allow the time to do all that testing when doing a board change as simply the clients do not pay for that time . So not Many are going to do all this .
    Most folk go down the RCBO route and eradicate the RCD Problems.
    Never the less great video and gave me some good pointers . Thank you 👍

    • @GSHElectrical
      @GSHElectrical  5 лет назад +1

      Hi. Thanks for commenting and watching Gaz 👍

    • @albertsteptoe3710
      @albertsteptoe3710 5 лет назад

      GSH Electrical 👍.
      I’m thinking of making a fica type wall in my garage with a some different circuits just to get a grip on all the testing . After work go out with a cuppa and mess about with the tester and do the tests over and over again to get in the habit and getting to grips with them all .
      What’s your thoughts on this for an idea just out if interest ?
      Thanks

  • @daniboy0812
    @daniboy0812 5 лет назад +2

    Great video. Will be using this as a reference video as I’ve been stuck on new installs who had their own dedicated testers and just started with a company who’s main customer is the local councils so lots of testing, remedial work and rewires. What’s everyone’s views on the cooker DP isolator being above the cooker itself? I suppose it’s the RCD protection cop out but I would’ve moved it to somewhere more appropriate . Nonetheless GSH are my go to learning source just to refresh - keep up the great work guys 👍🏻

  • @lawrencer25
    @lawrencer25 5 лет назад +1

    Very very good . Well done boys

  • @Weaselspleen75
    @Weaselspleen75 6 лет назад

    Another Great video, step by step and well explaned

  • @valyardelean
    @valyardelean 4 года назад +11

    This guy is a model student.

  • @MattgutteridgephotographyUk
    @MattgutteridgephotographyUk 4 года назад

    Such a great video, really helpful. Just one things regarding the r2 reading on the ring final. It should have been 0.23 (or very close to). That just got me scratching my head. Thanks!

  • @OthmanAlikhan
    @OthmanAlikhan 3 года назад +1

    Thanks for the video =)

  • @MarniLondon
    @MarniLondon 3 года назад +1

    Great video thank you guys so much appreciated

    • @GSHElectrical
      @GSHElectrical  3 года назад

      Thanks for the great comment 👍🏻

    • @MarniLondon
      @MarniLondon 3 года назад

      @@GSHElectrical Hi I just wanted to know the tool you used for nulling the test leads and plug, what is it called and where can someone purchase one from. Thank you

  • @markdavey7970
    @markdavey7970 6 лет назад +2

    fantastic video

  • @davidstrachan1890
    @davidstrachan1890 6 лет назад +8

    7 mins into video. r1 = 0.15, rn = 0.15 . if 2.5/1.5 (T & E) r2 of 0.45 is bly high? I would expect 0.25

    • @gspeng1
      @gspeng1 4 года назад

      That how I worked it out too r1 = 0.15. r2=1.67× r1
      0.15 × 1.67=0.25

  • @DaC-lt5mk
    @DaC-lt5mk 5 лет назад +7

    Absolutely brilliant knowledge! I wish I'd been taught as well as this chap during my apprenticeship, my boss taught me fantastically but my college tutors didn't even have their 2391, they were useless

  • @HouseSweetHouse1
    @HouseSweetHouse1 Год назад

    Is there a video demonstrating how to carry out an I.R test on a circuit that has an RCBO? Is it a case of disconnecting all conductors before carrying out the test in exam conditions?

  • @Gymreview84
    @Gymreview84 2 года назад

    If you do a board change do you have to bring the whole insulation to to current standard like higher sockets .

  • @Brian-rp6kq
    @Brian-rp6kq 3 года назад

    Great video just out of interest the cooker circuit zs reading seemed very high?

  • @linksone6287
    @linksone6287 6 лет назад +1

    Brilliant video Gaz. Keep up the terrific work and productive lessons for us learners.
    May I also ask you which tester would you recommend to buy for long term use. I’ve almost completed my level 2. Cheers
    Links

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Thanks for the support... my college use Megger testers and I have a great relationship with Lee Baker from Megger... get the best deal you can and read the instructions of the tester you select that’s Gaz

  • @damo3648
    @damo3648 6 лет назад

    The r2 reading on the ring was high, much more than 1.67 x 0.15. It might be old 2.5 + 1 mm2 t+e cable but it would still be a bit high. I think there is a slightly loose cpc somewhere.

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. All good talking points hence the description in the video also can be due to the resistivity of the copper 👍thanks for the comment GSH Electrical

  • @shannonj1000
    @shannonj1000 6 лет назад +2

    Excellent video.. well done to the chap and a good job. Can you advise I am looking to do this course. Do you have a website, and prices.. Thanks John

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. I work for Tresham College part of the Bedford group. Tresham college have a website and you can call them on ‭0845 658 8990‬. If you want to talk directly to me message me through my Facebook page same name GSH Electrical... All the best Gaz

  • @asef698
    @asef698 6 лет назад +1

    When testing ir and continuity if you were to find faults what needed to be addressed but the client wasnt happy with paying the extra money what would be the outcome. Just put the old consumer unit back up?? Or just fit the new consumer unit and state all issues on the certificate that need addressing even if they could be dangerous. maybe do a quick blanket ir before giving the client a quote? Great vid by the way.

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. My learner did pre tests before starting work. With the old consumer unit in place he did continuity, insulation resistance, Ze and a full visual inspection. He found a fault on the ring circuit during these tests. At this stage the old consumer unit is still in place. Pre tests are very important for the reason in your question thanks for your great question GSH Electrical

    • @seandempsey7351
      @seandempsey7351 2 года назад

      What was the reason for the change of CU ? This looks like another CU change for no real reason? Even if there was no RCDs , it was installed to an earlier edition of BS7671 that doesn’t mean it should be replaced or upgraded . HSE note published in BS7671 was and is clear on that. When he found a continuity problem he should have coded it, not fix it and use it as an excuse to replace the CU . No one takes any notice of the regs or the HSE note . Did all the test results comply with BS7671 yes they did so why change the CU he should / could have signed it off as safe for continued service.

  • @donovangreenwood69
    @donovangreenwood69 4 года назад +1

    Hi I'm a big fan of your work but I have a question before you start you insulation resistance you earth your met what is a met???

    • @GSHElectrical
      @GSHElectrical  4 года назад +2

      Donovan Greenwood MET stands for main earthing terminal 👍

  • @sbmorris2k6
    @sbmorris2k6 6 лет назад

    Great video nice to see the real world testing, nice to see that your doing pre tests and not just a straight swap. Also in regards to reconnecting the main earth to the service cut out what was the reason for it being disconnected, did you up the size?? Also I thought that the DNO would have had to connect that in ?? Thanks keep the vids coming

    • @GSHElectrical
      @GSHElectrical  6 лет назад +1

      Hi. He upgraded the tail and earthing conductor added a 100 switch. REC will re-seal the cutout (at a cost).

  • @krishath7085
    @krishath7085 5 лет назад +1

    Many thanks to the great video!

  • @robertasadomaitis1153
    @robertasadomaitis1153 5 лет назад

    When insulation resistance is performed on the lighting circuit, to change strappers you must switch one switch at the time otherwise switch will be in on or off position . Worst case when switch is left in off position ,than switched line conductor will be missed.Also there is no reason to do insulation resistance test twice between cpc and neutral as they permanently connected.

    • @GSHElectrical
      @GSHElectrical  5 лет назад

      Hi. Thanks for commenting and watching
      ruclips.net/video/9AjyWl_2bds/видео.html
      All the best Gaz 👍

  • @shilks8773
    @shilks8773 5 лет назад

    Who keeps a record of all the test results carried out for the CU installation. Are/should they held by they likes of NAPIT Elecsa or NICEIC. If they aren't - then they should be.

  • @simonmonde1537
    @simonmonde1537 3 года назад

    I need to do the online certificate training.

  • @TuanDo-im1ex
    @TuanDo-im1ex 2 года назад

    Hi,
    thank you so much for a video.
    just asking if i do IR testing, the circuit must be turned off then i can start the IR testing isn it? thank you

  • @drunkinpiper
    @drunkinpiper 6 лет назад

    Very good video performed by a very diligent student. Cabling seems to enter the board through the rear knockouts how was the fire integrity preserved? Do you think that it is ok to use an intumenscent fire sealent where the cables use an existing hole that may not meet current fire barrier standards?

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi great question. The wall the metal dis board is fixed to is non combustible brick and plaster surface. Thanks for watching GSH Electrical 👍

  • @ScottMcD91
    @ScottMcD91 6 лет назад +3

    Great video gaz.
    40amp mcb for 6mm cable though? I would have that on a 32?

    • @GSHElectrical
      @GSHElectrical  6 лет назад +1

      Hi. BS7671 states that 6mm cable can carry up to 47 Amps. Thanks for the question Gaz and watching 👍

    • @ScottMcD91
      @ScottMcD91 6 лет назад +1

      So best working practice to use a 40amp? Don’t get me wrong for bigger showers I will use 10mm and 40amp. But I have always been told throughout my apprenticeship if you come across a 6mm on a 40amp to reduce the rating to 32.
      Thanks ur videos are great.
      Scott

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. Will always depend on the correction factors applied to the cable during its run. I commend your best practice of using 10mm cable keep up the great work Gaz

    • @marcusbarritt91
      @marcusbarritt91 6 лет назад

      cooker is on a 32 amp breaker all ready so meets the regulations?

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. Another one of the talking points brought up in this video to discussed in the classroom. As the circuit(s) are protected by and RCD the earth faults will be cleared by this device so no issues you are now required to do a loop test between line and neutral and check that reading again the maximum Zs of the breaker... my class won’t need the lesson that goes with this if you keep going. Thanks as always Gaz

  • @davidmanning5874
    @davidmanning5874 5 лет назад

    WHAT I FIND CONFUSING IS METAL SINKS +DRAINERS AND PLASTIC PIPES
    DO I RUN AN EARTH WIRE FROM SINK TO NEAREST SOCKET OUTLET EARTH TAB ANY IDEAS PLEASE?

  • @wworrell374
    @wworrell374 6 лет назад

    To the usual high standards. Your videos have been a great help. Just passed my 2392-10. Found on several occasions r1+r2 over 4 did not match the socket values as cpc was greater than 1.67 times. How do we deal with this on site?

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. The Quality of copper and it’s resistivity unfortunately changes. Go with the readings you calculate from r1, rn and r2 to find R1 + Rn and R1 + R2 + - 0.05 ohms. All the best GSH Electrical

    • @wworrell374
      @wworrell374 6 лет назад

      Cheers

  • @jamblob3208
    @jamblob3208 4 года назад

    Watch twice to listen once. Education for the masses not the working classes.

  • @PaulWitcombe
    @PaulWitcombe 4 года назад

    Great content, it really helped with exam preparations. I was just wondering what the name/brand that lead null clip is?

  • @supersparks9466
    @supersparks9466 5 лет назад +5

    As depressing as this sounds, I can almost garrantee very few sparks would carry out all the thorough pre testing required and thorough post testing for a cu change. Been doing it 40 years and never seen any other sparks carry out all the required testing.

    • @GSHElectrical
      @GSHElectrical  5 лет назад +1

      Hi all of my learners have to... raising standards one learner at a time 👍. Thanks for commenting and watching GSH Electrical

    • @supersparks9466
      @supersparks9466 5 лет назад +3

      Good luck with that, once they are on there own in the real world doing it in an occupied property with crap everywhere some of those tests will be swerved. I’d like to be more positive about it sorry.

    • @LSF315
      @LSF315 5 лет назад

      Supersparks I’m sure you’re right.

    • @christopherhager5070
      @christopherhager5070 5 лет назад +2

      If they don’t bother with IR testing before a board change.......they soon will after finishing one at 530pm and then realise they have a few earth faults to trace before the RCDs stay in 😂. Been to a few where the RCDs aren’t even connected 😡😡
      Great to see the learners are getting it drummed in, which no doubt become second nature.
      Great vid though GSH

    • @supersparks9466
      @supersparks9466 5 лет назад +5

      Chris, I do hope so. Would have liked to see this vid using a more common scenario of a occupied house with multi dimmers,countless down lights, external power and lighting,shed,loft circuits with crap everywhere etc. Instead of cherry picking a nice empty house with pendants etc.

  • @alvinashman6371
    @alvinashman6371 6 лет назад +2

    Maybe I'm being stupid here, but why retest (insulation resistance) between the neutral and cpc conductor on the two way lighting circuit, both are unswitched so pressing the 2 way switches should have no bearing with regards to your insulation resistance reading between neutral and cpc.

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. Totally correct however during training it’s easy to repeat all 3 again this removes the rick of missing out the ones we need to test between. Thanks for the great question GSH Electrical

  • @explorewithant
    @explorewithant 5 лет назад

    I need to put 2 double sockets for my new cctv setup,,,I’m just wondering if it’s an easy job and could you talk me though it because I’m usually good at most diy jobs around the house 👍

    • @ef7480
      @ef7480 2 года назад

      Brown to brown, green/yellow to green/yellow and blue to bits...

  • @chafford7591
    @chafford7591 2 года назад

    If you T&E is 2.5mm, r1 is 0.15, rn is 0.15, the expected value of r2 should be 0.25 and not 0.45 as its only 1.67 times thinner. 1.67x0.15 is 0.25 not 0.45 except you have extra lenght for the cpc.

    • @GSHElectrical
      @GSHElectrical  2 года назад

      Or is the cpc 1mm2 in this installation 👍🏻

  • @tommcneil8752
    @tommcneil8752 6 лет назад

    Am I missing something here? When he carried out an insulation test between Neutral and CPC he got an infinity reading , yet we saw him connecting the earthing conductor previously into the MET supply cut out. How did he get the infinity reading. Surely the earthing lead should have been disconnected from the supply neutral.
    Or did I miss something here??
    Otherwise a well done video.

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. Was the double switch off...? thanks for the question GSH Electrical

    • @tommcneil8752
      @tommcneil8752 6 лет назад +1

      Yes, it was. I knew I had missed something and it occurred to me later in fact to check that point. Sorry, and thanks again. The video was very informative and well presented.

  • @adiecarr
    @adiecarr 6 лет назад

    Good video but I thought zs of a 6 Mcb b was 5.82 not 5.87 (21:35 ish)

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. Thanks for commenting and watching... Sorry if he gave incorrect information. All the best GSH Electrical

  • @ericdavies1040
    @ericdavies1040 5 лет назад +1

    Im afraid 0.45 ohms is way to high for r2. It should be 0.25 ohms if r1 is 0.15 ohms.

    • @asamitchell7948
      @asamitchell7948 5 лет назад

      Just thinking that myself 0.25 is 0.15x1.67

  • @thomasmcclennon9738
    @thomasmcclennon9738 4 года назад

    Hi Gaz and Marcus. A quick question please. If you're testing a circuit (eg. Lighting circuit) that has being installed by somebody else years ago, how do you work out where the furthest lighting point is? And then do you record the reading from the furthest point in the continuity test as your value for the test sheet?

    • @alexrowbottom58
      @alexrowbottom58 4 года назад +3

      You’ve answered your own question pretty much, the furthest point of the radial circuit will give you the highest R1+R2 reading (lighting, radial sockets etc) as it has the most cable in the run and therefore the highest resistance which is the value you record.
      The way you find it is to test at every point of the circuit (all switch points, all PIR’s (if applicable) all lighting points I.e. ceiling rose and the highest continuity value is your end point

    • @thomasmcclennon9738
      @thomasmcclennon9738 4 года назад

      @@alexrowbottom58 thank you for letting me know.

  • @ifyougetstucklookitup237
    @ifyougetstucklookitup237 3 года назад +1

    Thank you (both of you)

  • @Keith-jj2oh
    @Keith-jj2oh 6 лет назад

    On here you did 1 pfc test on the breaker but should all of them of been tested?

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. You could calculate Fault current by doing voltage/Ze Guide)... you can argue that doing the test on the top of the main switch is always going to be the highest fault current so why bother doing down stream on a breaker where the fault current will be less. Thanks for watching GSH Electrical

    • @Keith-jj2oh
      @Keith-jj2oh 6 лет назад

      GSH Electrical cheers.

  • @gavinjohn-hyde2760
    @gavinjohn-hyde2760 6 лет назад +2

    Interesting you say fuse has been pulled... did you ask the dno permission or just do it? strictly speaking its the dno's property most will say not to pull, more to cover themselves and down to h&S. however in the real world we all know people pull them or have a visit from the seal fairy! each person must make a risk assessment and decide, if its one of the really old ones do not touch as it will possibly fall apart and may contain asbestos. with newer ones make sure there is no load and for extra protection wear the electrical safety gloves and visor like when changing a meter..
    What do you teach your students about this issue?

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. He contacted the REC (I use to work for them) for permission and will be paying for them to re-sealing the cutout. Thanks for watching GSH Electrical

  • @bdawinton
    @bdawinton 5 лет назад +1

    I'm surprised he did not check the correct operation of the RCD before going to do the test on live circuits. other than that love to see how its done in different counties

  • @CjsGfX
    @CjsGfX 5 лет назад

    Can anyone explain what he meant at 13:10 about l-n

    • @seandempsey7351
      @seandempsey7351 2 года назад

      Rated current of the RCBOs and main cutout fuse .

  • @alvinashman6371
    @alvinashman6371 6 лет назад

    I really don't like that torque screwdriver, I didn't even know you could get them uninsulated.

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. That type or torque screwdrivers in general?

    • @alvinashman6371
      @alvinashman6371 6 лет назад

      That particual torque screwdriver, when working in a board, I like to check the incoming tails are tighten to the correct torque at the main switch. I understand the terminations were made with the supply isolated but I'm not a big fan of uninsulated hand tools for electricians.

    • @GSHElectrical
      @GSHElectrical  6 лет назад

      Hi. Another good point. The video is a training aid for my level 3 adults there are many good talking point for me and them to cover in the classroom. Thanks for watching as always Gaz

  • @bigdick6666666
    @bigdick6666666 5 лет назад

    Why did you use 6mm for the shower circuit, it's not going to be suitable, the cable's going to overheat. Should have used 10mm.
    Spend a bit more money and install the correct cable. What's the power rating of the shower? When the householder finds the shower is not heating the water enough and wants to upgrade the shower, will you come back and install the 10mm cable free of charge?

    • @GSHElectrical
      @GSHElectrical  5 лет назад

      Hi. The work in the property was a consumer unit change only. Thanks for commenting and watching GSH Electrical

    • @ef7480
      @ef7480 2 года назад

      Existing circuit. Clue in title.....

  • @callumsimpson7483
    @callumsimpson7483 2 года назад

    Just out of interest why don’t you just do two lead low instead of 3 lead

  • @MH-sf5ml
    @MH-sf5ml 4 года назад

    Meanwhile, back in reality....

  • @JohnDundee-el2ro
    @JohnDundee-el2ro 7 месяцев назад

    Why do you have to connect main earth for insulation resistance test why can't it be left out

  • @hassandehghan9954
    @hassandehghan9954 4 года назад +1

    this video is very good.i have been watch this video several times be cos i learn to many things which is good for my test exam
    many thanks to Gaz and Marcus for this video

  • @justifiedfreelybyhisgrace1779
    @justifiedfreelybyhisgrace1779 6 лет назад +2

    Love the real world videos. Thanks for sharing.
    Also do you have any videos of more faults you may or have come in testing across and how to deal with them. Thanks

  • @adrianJUPANU
    @adrianJUPANU 5 лет назад +1

    Interested about the screwdriver whats the name of that?

    • @GSHElectrical
      @GSHElectrical  5 лет назад

      Hi. We use this one at college 👍😁
      www.screwfix.com/p/wiha-vde-torque-screwdriver-set-11-pieces/2581K?kpid=2581K&ds_kid=92700043549444123&gclsrc=aw.ds&ds_rl=1244066&ds_rl=1241687&ds_rl=1245250&gclid=CjwKCAjwsIbpBRBNEiwAZF8-z3h9jFlERmo0Mk6GK9thJaG9kdYgyiCq4F0ORvEV0atgjkJpjj9H-hoCyqIQAvD_BwE

  • @user_i.d
    @user_i.d 5 лет назад

    Question? Whats the difference between polarity & functionality test. The young man switched the switch and said polarity confirmed but i thought that was a functional test to see that the switch is working.
    Can someone explain the difference between polarity & functionality test please