Greedy Method Job Sequencing with Deadline

Поделиться
HTML-код
  • Опубликовано: 2 авг 2024
  • Greedy Method Job Sequencing with Deadline
    Watch More Videos at:
    www.tutorialspoint.com/videot...
    Lecture By: Mr. Arnab Chakraborty, Tutorials Point India Private Limited.

Комментарии • 27

  • @joeytribb6208
    @joeytribb6208 6 лет назад +11

    Nicely Explained.
    I hope you've noticed that tutorialspoint is misspelled in the coat.

    • @sindhukannan358
      @sindhukannan358 2 года назад

      @@gayathrib8610feasible solution and optimal solution is different?

  • @gibranfahad6876
    @gibranfahad6876 3 года назад

    thank you sir for clearing my doubts regarding this topic

  • @debanjanaghosh6634
    @debanjanaghosh6634 4 года назад

    Cleared the concept. Thanks:)

  • @plumSlayer
    @plumSlayer Год назад

    One of the best explanations

  • @aryashailesh12
    @aryashailesh12 6 лет назад +3

    Nicely Explained.
    Thank YOu Sir!!

  • @mohitmaithani4192
    @mohitmaithani4192 5 лет назад +4

    No difference between my lecturer and you !

  • @RiyaSingh-ox2dj
    @RiyaSingh-ox2dj 4 года назад +1

    U have explained in a very well mannered way sir. Understood everything. We need more teachers like u

  • @aryancomputer1417
    @aryancomputer1417 2 года назад

    Osum explain

  • @railwayslovergames2378
    @railwayslovergames2378 5 лет назад

    The algorithm is written from sahni book

  • @aryancomputer1417
    @aryancomputer1417 2 года назад

    Osm

  • @bablinechepkirui2499
    @bablinechepkirui2499 2 года назад

    you said no jobs can run in parallel, but why 1,3

    • @plumSlayer
      @plumSlayer Год назад

      because, one job requires only one unit of time. So 1 and 3 can be done in sequence, as max deadline is still 2 ... I think you should watch the video again

  • @rsingh6763
    @rsingh6763 6 лет назад

    sir your name ??

  • @adarshpnair7876
    @adarshpnair7876 5 лет назад

    if 1,3 is possible in parallel then why not 2,4 not possible. You guy's just copy paste and not even explaining anything. IS it true?

    • @ManishKarki
      @ManishKarki 5 лет назад +6

      in case of 1,3: the deadline is 2 for both cases. that means, suppose today is january 1 and both jobs should be completed before january 3(because deadline is 2 so jan 1+jan 2=jan 3). we can do job 1 in january 2 and job 3 in january 3.
      In case of 2,4 : it's saying that we have to complete both jobs in january 2(the deadline is JAN 2) which is not possible because each job takes minimum of 1 day to complete(it is a given).

    • @kusumlatapatiyal4782
      @kusumlatapatiyal4782 Год назад

      @@ManishKarki still not clear

    • @plumSlayer
      @plumSlayer Год назад

      You don't have an understanding nor can u do something for someone, what u can do is bitch about people who r working hard for a cause.

  • @niteeshchaturvedi2754
    @niteeshchaturvedi2754 6 лет назад +1

    why there is not (2,4)

    • @adarshpnair7876
      @adarshpnair7876 5 лет назад

      he will not reply. I think he just copy paste everything

    • @saivinay5652
      @saivinay5652 4 года назад +1

      Bcoz we can't write processing as(1,1)

  • @rsingh6763
    @rsingh6763 6 лет назад +2

    Are you bengali sir ?? rashugolla khaabe ??