    @saugatroy2255 2 дня назад +27

    RERA is toothless tiger, I’ve invested my hard earned money in a famous group “Adhiraj Samyama, Kharghar “ from 2016 and paid 80% of the money. But from last 3 years work is stalled and RERA has been giving extension after extension without checking on ground situation.

    • @phirkesm
      @phirkesm 23 часа назад

      @@saugatroy2255 True

  • @Neo_Chaps
    @Neo_Chaps День назад +16

    Maha Rera is working on behalf of Builders, particularly in metro cities like Mumbai, Pune, Nashik and Sambhaji Nagar etc. I think notices are Only for showoff. Customers should come together and file cases in consumer courts against irresponsible builders and Maha- Rera should make parties in this legal fighting.

  • @csmaurya9816
    @csmaurya9816 2 дня назад +34

    RERA is only for builders not for buyers

  • @subhashbagle8757
    @subhashbagle8757 15 часов назад +3

    ई.डी....सी.बी.आय.....एन.आय.ए.....अब रे.रा.....चलती कि नाम गाडी.....गाडी में बैठे अनाडी....जनता हैं खिलाडी.....अन्याय हुआ अब भारी.....जागे जब जनता बेचारी.....पैसौ का चक्कर पडता है भारी.....फिर भी हम अनाडी.....पडे रहते हैं जैसे भीकारी..... हिंमत हम हारे हैं.....अब राम ही प्यारे दुलारे हैं....पीढी दर पीढी ....हम सरकारी दफ्तरों से हारे हैं.....

  • @threetriangle4880
    @threetriangle4880 2 дня назад +20

    Rera is a joke. Builder has facility to extend project completion date as they want. Project started in 2009 can extend completion date till 2024. Generaly in 10 year the buildings needs inspection for repair but Rera has no issues 15 years construction duration. All flat owners combined also cannot do anything against the builders becauee they have a legal department dedicated to handle such thjngs and maximum Rera can do is ask builder to start the rent which would be few thousand and it will be in form of credit note. Which builder will discount at the time of possession. So go for ready flats avoid under construction projects. Against the credit note builder will add some additional charges and level it up. If Rera wants to be helpful, it should take the project in its custody and start the peoject immediately with some reliable company like L&T etc. There should not be more than 2 years extension period beyond what was promised initially by builder.

  • @sanjayshah7954
    @sanjayshah7954 День назад +7

    इतने नोटिस एक साथ भेजने तक rera ऑफिस किसकी राह देख रहा था.......
    जिनकी जिनकी तारीख निकल गई, उनको समय पर नोटिस क्यों नहीं भेजे गए, इनके खिलाफ कौन एक्शन लेगा......
    पूरे बाजार में चर्चा है, rera के ऑफिसर्स खुद डेवलपर्स के साथ साठ गांठ करके, ये लचर सिस्टम चला रहे हैं

    • @rupaligudhekar9393
      @rupaligudhekar9393 День назад +1

      We r fighting in Rera since last three years but till date rera has not given any verdict on the same. As per rera clases the verdict has to be given in 60 days. Why rera should not be penalised for delaying the judgement. Why Only timeline is being given to builders for completing the project????

    • @rupaligudhekar9393
      @rupaligudhekar9393 День назад

      Many times it is beyond control of the builder also to complete the project like bureaucracy and khabugiri and babugiri in BMC. They do not issue cc or oc without taking bribes which most of the builders do ot like to give them. In that case the buyers only the suferers

    • @rupaligudhekar9393
      @rupaligudhekar9393 День назад

      For updating details quarterly on rera sites CA certificate is required for which CAs also charge about 25000-30000 fees. Why builder unnecessarily pay for the same on quarterly basis

    • @rupaligudhekar9393
      @rupaligudhekar9393 День назад

      Gautam chaerjee - ex chairman was acting arbitrarily he was not even obeying high court orders.

  • @taujikavigyan3222
    @taujikavigyan3222 2 дня назад +9

    यह प्रोजेक्ट करने वाले लोग मिलने नहीं आए होंगे इसीलिए नोटिस भेजे गए हैं ताकि मिल के जो हमारा बनता है वह हिस्सा हमे दे दो और एक्सटेंशन लेलो

    • @narendradandekar9083
      @narendradandekar9083 День назад +1

      Sahi hai

    • @Neo_Chaps
      @Neo_Chaps День назад +1

      आपने बिलकुल सही बात उठाई है, नोटीसेस तो इन लोगो कमाई /उगाही के लिये साधन बनाया गया है l

  • @abdulkhalik759
    @abdulkhalik759 2 дня назад +5

    5:30 OC k bina handover kaise ho gya. ek bar builder office k bahar baitho , fir pata lagega buyers k baare mei.

  • @shekhars6014
    @shekhars6014 2 дня назад +7

    Signature global superbia Gurgaon an affordable project RERA date was Dec2024...There is no status update...there are towers where more than 80% paid a year back n the tower is not even 20% completed...i wonder where the RERA is

  • @MahiSingh-n1z
    @MahiSingh-n1z 5 часов назад +1

    Ye complaint rera mai bhale hi 1700 hai lekin real mai 1700 se bhi jyada hai jismai se ek mera Builder Sanghvi premises private limited bhi hai, jiska Atgaon, shahapur thane district ka project rera ke hisab se 2019 mai Complit hona tha lekin abhi tak es Project ka OC nahi aaya hai.

  • @phirkesm
    @phirkesm 2 дня назад +13

    RERA Bhrast hai, no action on builder. MAHA RERA MAHA FAIL. Collection started

  • @starm5317
    @starm5317 2 дня назад +8

    Maharastra का rera का बंगाली चीफ पुरा corrupt हैं सब बिल्डर्स से पैसे कम रहा है नोटीस देके माल जमा कर ता है

  • @altafajani3132
    @altafajani3132 День назад +3

    जागो ग्राहक जागो।

  • @AshutoshShrivastav-ib4kh
    @AshutoshShrivastav-ib4kh 2 дня назад +12

    RERA = वसुली भाई 👻

  • @kantapatil6568
    @kantapatil6568 22 часа назад +4

    रेरा रेरा नाम जपके . बिल्डर से हफ्ता वसूली करेंगे और उसका बोज घर खरीदने वाले से निकालेंगे कुछ समजमें आ रहा है!!

  • @nationfirst4593
    @nationfirst4593 День назад +3

    Now new ministers will start collecting their part of bounty in their departments!

  • @pawankhurana1345
    @pawankhurana1345 День назад +1

    Sleeping RERA , first time seen doing some action, over the time RERA has failed to meet the objectives for which it was formed, that is save the interest of consumers who are exploited at the hands of real estate developers who are most of the time backed by politicians . RERA even has more responsibility than just protecting the interests of Home buyers as we all know that real estate is the largest sector that gives many employment opportunities from Labour to Engineer and even other sectors like steel cement

  • @shivshankar-tq3xy
    @shivshankar-tq3xy 2 дня назад +4

    उन प्रोजेक्टों का नाम कैसे पता चलेगा

  • @Aicats3345
    @Aicats3345 День назад +5

    Xrabai vangni ka project hai jo builder bankrupt bol raha jab kay bhot si bank paisa liya hai our ab NCLT ko surender ker raha hai jitnay ka flat outna ham nay pricipal interest bhar diya

  • @hemantsonar1186
    @hemantsonar1186 2 дня назад +4

    Xrbia development vangani 2017 me buking ki tha aaj tak nahi mila

  • @vipinkumarasthana6345
    @vipinkumarasthana6345 4 часа назад

    सरोकार से जुड़े कार्यक्रम करने के लिए CNBC का धन्यवाद।

  • @eKapte
    @eKapte 20 часов назад +1

    महारेरा के वारंट ऑर्डर पर गए 4 साल से कुछ नहीं होता, जब पुना रेरा ऑफिस में मिला तो कहते है, हमने ऑर्डर दे दिया है, आगे हमारे हाथ में कुछ नहीं है। अंधा और आधा कानून बनाया ही क्यों, लोगों को मूर्ख बनाने के लिए। I am fighting from last 10 years, paid 100% payment, No possession, Paying EMI. Warrant is pending at Tehsil. Rera dont have any power to execute his order.

  • @mantoshyadav2751
    @mantoshyadav2751 День назад +6

    xrbia vangani taluka karjat ka project hai jo khudko bank crupt batakar khud ka pala jhad raha hai 2016 se project shuru hua hai .. Till date abhi tak project adhura hai maha rera puri tarike se failed hai .

  • @ujs204
    @ujs204 52 минуты назад

    हम ज्येष्ठ नागरिक है. हमने हमारा मकान बेचके नये जगह मे पैसे डाले. हमे दो साल पहले possession देने का बिल्डर ने वादा किया था. Rera date भी दो साल पहले की थी. मगर अभी तक possession नही मिला. क्योकी लोकल authority OC नहीं
    दे रही है. मैं अभी महना Rs ३००००/- देकर भाडे के घर मे रहता हुं. Rera पर विश्वास नहीं है. बिल्डर,municipality,Rera सब मिले हुए है. इनको जनता के परेशानी से कूछ लेना देना नहीं.

  • @chandrashekhardandekar1260
    @chandrashekhardandekar1260 День назад +1

    Rera should act before these buildings are completed .Also the registrar of societies ,municipal officers connected with the job are busy in corruption & relevent delays made by them .Goverment should take nacessary & stricter action on these departments.

  • @dewangmavadia85
    @dewangmavadia85 2 дня назад

    Thank you sir for important information ❤

  • @NazimKhan-iy9xp
    @NazimKhan-iy9xp День назад +1

    Rera is toothless tiger
    Original project 2019 June ko lapse hogaya tha Developer ne 2 time extension liya 2021 apr and 2023 may, ab dec 2024 ko lapes horaha hai lekin Abhi Tak usne 15 saal mein sirf 16 floor construction hua hai
    During the extension developer ne form B ka viaolation kya extension mein consent flat purchaser ke sath rehab compotent ka bi consent lya.
    Lekin rera without verification extension diya jaa raha hai aur flat purchaser ab bi possession nahi mila, recovery warrant issue bi hua lekin abhi tak paise nahi mile aur possession bi nahi

  • @ramdattdesai9745
    @ramdattdesai9745 День назад +4

    How I can check project where I am purchasing flat that Rera had taken action.

    • @propertiesinmiraroad
      @propertiesinmiraroad День назад

      Project main booking karne se pahle builder ke previous project ke baare main zarur pata karen

  • @harijayswal9720
    @harijayswal9720 2 дня назад +1

    Good initiation by RERA

  • @sanjayshah7954
    @sanjayshah7954 День назад

    I agree with the statement of Mr. Venkat Rao

  • @vikaschavan7554
    @vikaschavan7554 День назад +1

    मै डोंबिवली में चक्रपानी कॉम्प्लेक्स में बुकिंग किया है वोह बिल्डर बोल राहा है, रेरा हमसे पैसे पेनल्टी के रूप में जादा मंग राहा है और टाइम्स भी जादा ले रहे update करणे के लिये.

  • @motilalchoudhary6318
    @motilalchoudhary6318 2 дня назад +2

    सब मौसेरे भाई भाई है,विरार का HDIL, और GLOBAL CITY ये प्रोजेक्ट 2012 से RERA नं होकर भी सभी लटकें है

  • @jagdishvyas7943
    @jagdishvyas7943 20 часов назад

    SRA might have utilised buyers money till date and so for the delay caused, buyers should be rewarded with maximum interest @ 21 %

  • @sheetalghodke9017
    @sheetalghodke9017 День назад

    Maharashtra C.M. Shri Devendra Phadanvis has brought this very important role in Maharera. But not observed further developments. So request our CM to personal involvement in this rule. So many many middle class family atleast relaxed.

  • @harijayswal9720
    @harijayswal9720 2 дня назад +1

    Builders/Developers not following the rules and regulations of RERA, they taking lightly cause of no such strong action by RERA on developers.

  • @krishnanandmallya7947
    @krishnanandmallya7947 17 часов назад

    Advisable to buy property after OC don't waste time and money in litigation.

  • @MastersSolution
    @MastersSolution 3 часа назад

    Venkat rao ka sawal ka jawab kisi ne bhi nahi diya
    Only 10% problem is solved after RERA. Baqi developer abhi bhi mai baap hai, queki uske paas Paisa hai.

  • @jyotijain6501
    @jyotijain6501 День назад +2

    २०१९ में महारेरा order दिया है । order तो दिया जाता है लेकिन implement नहीं होता है।हम २०१९से अभी तक २०२४ भी खत्म हो रहा है तब भी सफर कर रहे हैं।
    २०१९से लेकर आजतक हमें महारेरा, कलेक्टर ऑफिस, तहसीलदार,तलाठी यहां से वहां बस हम(ग्राहक)हीं सफर कर रहे हैं लेकिन हमें न्याय नहीं मिल रहा।
    इसलिए शायद लोग complete नहीं कर रहे हैं।

  • @ssrp4560
    @ssrp4560 День назад

    jai shree ram,
    i had booked flat at Highland spring in thane during property expo in 2019, builder that time assured possession in june 2020. After making initial payment and time of regjstration OF agreement i was told that possession date is Dec 22 and not june 20. after that every six months builder used to extend the date by six months. finally possession was given in may 24 that too without completing amenities i.e lift were not installed, electric meter was installed after possession is taken, parking was not provided to individual flat owners, Most important thing is before giving possession builder had forced the individual flat owners to signed undertaking as per specimen provided by builder at flat owners cost of Rs 1500 which says flat owners can not asked for compenstion for delayed possession. also can not asked for details of expenditure of maintenance charges collected by builder for two years etc.
    actually REREA SHOULD NOT have GIVEN EXTENTION FOR PROJECT WITHOUT HEARING THE FLAT OWNERS. REREA IS WORKING FOE BUILDERS LOBBY AND NOT FOR FLAT OWNERS. purpose of RERA FOR WHICH IT IS SET UP ITSELF IS DEFEATED.
    RERA IS toothless agency, for what purpose it is set up god only knows.

  • @ganpatnagupillay4887
    @ganpatnagupillay4887 День назад +1

    Rera must penalize for non compliance project alogwith all amenities mentioned in books issued. Thanks

  • @aliwalaaaa
    @aliwalaaaa День назад

    Home Buyers to never invest or put money as deposit or advance even 1% initial deposit in any new under construction property. Buy property paying a little more money only after construction is completed.

  • @nareshkoli1017
    @nareshkoli1017 19 часов назад

    सरजी बिल्डर एक वर्ष का मेनटनस ओसी मिळणेसे महिने से ले रहे है किंतू रेरा का रूल है की पजेस मिळणे के लेना चाहिए

  • @s.ssingh4132
    @s.ssingh4132 2 дня назад +3

    RERA corrupt

  • @shashigudavalekar8893
    @shashigudavalekar8893 День назад

    😢 it's big fault mistake, careless. Worning time Ishu karnaa chaheay tha. Direct Action lenaa ho sakta hai galat hoga.

  • @ilasingh6781
    @ilasingh6781 2 дня назад +3

    अरे बिल्डर लुट रहा है आप राजन उसी कि तरफ से बोल रहे हैं

  • @NikhilRane-k4c
    @NikhilRane-k4c День назад

    It’s better to avoid buying homes, as real estate is one of the few industries where customers pay large sums of money only to be treated poorly by builders, who often exploit them and misuse their hard-earned money.

  • @rajendra4813
    @rajendra4813 15 часов назад

    Dear all never book any flat .just take ready to mobe resale old flat..

  • @sanjayjadhav3435
    @sanjayjadhav3435 День назад

    In Maharashtra they removed toll plaza so they lost some corruption money,now they try to theft builders money , indirectly they will theft common man.

  • @shreyaspawar5831
    @shreyaspawar5831 5 часов назад

    हमारा प्रोजेक्ट 1997 रिसवी बिर्डरस के पास हुआल लेकीन आजतक एन ओ सी नही हे रहे जो बोले ते ओ नही दिया 2000 झोपडे थे बालवाडी कम्युनिटी हॉल ये सुविधा नहीं दिया कमिटी और बिल्डर मिलके हमको फसाया क्या करे

  • @ansarimukhtar4044
    @ansarimukhtar4044 2 дня назад +1

    sir, very useful,
    Please give rera address to complaint my problems.

  • @Frouddevlopar
    @Frouddevlopar 2 дня назад +3

    Rera scam hai

  • @nmsports3956
    @nmsports3956 22 часа назад

    Kahin na kahin aap customer ko open hand Dene ki socho fir dekho kitne complain aate?

  • @rajendra4813
    @rajendra4813 15 часов назад

    Do not take any home underconst. It's waste of money adhiraj last 2012 still under construction rera is just see.

  • @s.ssingh4132
    @s.ssingh4132 2 дня назад +1

    Project rukega toh bhi grahak ko hi taklif hai

  • @nanhe_shaikh
    @nanhe_shaikh День назад

    A anounce consepiracy of new comming govt through maharera to fool the buyers and make presser on builders who also specialise of this tactics.

  • @rajendra4813
    @rajendra4813 15 часов назад

    Modi sarkar doing any special on this issue??

  • @krishudesu2004
    @krishudesu2004 День назад

    Maharashtra rera ek side bataye jisase ye pata chale ki building kya matter hai

  • @hb-ss1bs
    @hb-ss1bs 2 дня назад +3

    A govt dept issues OC
    RERA does not ask tgat govt to enter data. RERA begs builder only
    Anarchy rule

  • @Abhi-u1u
    @Abhi-u1u День назад

    Wah sara dosh A bhai to rere ko hi dosi sabit karveme lga hai

  • @csmaurya9816
    @csmaurya9816 2 дня назад +2

    Buyer RERA se kamjor hua hai. Aaj completion date 7-8 saal ho gai. Koi home buyers isame uska dukh malum karane ki koi aavshykata nahi. Bakwas program.

  • @ujjwalasathe1368
    @ujjwalasathe1368 2 дня назад +3

    Sab baher k hi log aa rahe hai ....hum marathi logonko ghar bhadese bhi nahi mil rahe ...sab gandahi...paan ki tapri... up..bihar...rajasthani.... assami...kareeb 9 rajonke log aa rahe kyuuuuu

  • @AsliYoutuber-ludhiana
    @AsliYoutuber-ludhiana 19 часов назад

    बस यही तो काम है तभी तो इंडिया बदनाम है।

  • @SatnamSingh-fb9qt
    @SatnamSingh-fb9qt День назад

    Builder,Rera,Politician,IAS officer milley hue hen.

  • @rakeshgaware6203
    @rakeshgaware6203 День назад

    Notice के सिवा रेरा को कुच्छ आधीकार नहीं

  • @beautifulworld_1626
    @beautifulworld_1626 2 дня назад +1

    Don't worry builders r invincible 😂😂😂😂😂

  • @moolsinghrao6646
    @moolsinghrao6646 6 часов назад

    ये सरकार के लिए काली कमाई है रेरा और कुश नहीं 😂 रेरा खुद भ्रष्ट है 😂😂😂

  • @vkhomeproducts517
    @vkhomeproducts517 День назад

    Adani ko dena chahiye, nahi Diya, maharashtra me BJP ka hogaya,
    Re- election in Maharashtra with balate paper

  • @jagdishmahindrakar5356
    @jagdishmahindrakar5356 18 часов назад

    Karrm infrastructure 2012 se chalu hai

  • @pradnyapatil2163
    @pradnyapatil2163 День назад

    Please help us we invested 25 lakh at 2017 but it is not progressing Please stop this corruption 😞 😢

    • @rajendra4813
      @rajendra4813 15 часов назад

      Try to do followup or talk to modi Sarkar or think its donation..

  • @400saar
    @400saar День назад

    RERA only naam ka hai, jaise baki govt. Offices hai waise hi ye kam karta hai. 11k projects me kitne logo ka paisa phansa hoga?? Kitne buildets OC dete hai??? Aur bina OC k municipalties kaise allow karte hai??

  • @sushilkumark5123
    @sushilkumark5123 День назад

    Builder centric rera. Useless notice

  • @hvkadam
    @hvkadam День назад

    RERA is waking up after building is constructed 😂

  • @JAINABANSARI-d1d
    @JAINABANSARI-d1d 13 часов назад

  • @AjayAsher-l7d
    @AjayAsher-l7d День назад

    Sir.
    Mere isaab se.
    Rera ko hi.
    Bhar pai dena chahiye.
    🤣🤣🤣🤣🤣🤣🤣

  • @johndsouza6120
    @johndsouza6120 2 дня назад

    Mhada subhash nagar chembur build number 21 mumbai 71 mhada is not give wording on that plot.

  • @Abhi-u1u
    @Abhi-u1u День назад

    Rera me Ak bhi member bilder bhi nhi hona chahia

  • @cmrafee2177
    @cmrafee2177 День назад +1

    Hafta nahin pohncha!

  • @svdw09
    @svdw09 День назад

    In redevelopment building they gave 10 years only extention that had no limit we complaint in high court & party to RERA also, Very fraud System, Only harrassing Consumer & Supporting Builders.

  • @narendradandekar9083
    @narendradandekar9083 День назад

    REARA ho ya kuch bhi ho Abhi tak so gaya tha kya RERA mein flat searching mein hu sabhi builder bolte hai RERA register hai are but RERA to soya hai kay fayda😢

  • @ilasingh6781
    @ilasingh6781 2 дня назад +1

    लखनऊ में मैने भी बुक किया है बहुत परेशान कर रहा है बिल्डर् दे नहीं रहा है मैं किराये पर रह रही हूं

    • @hb-ss1bs
      @hb-ss1bs 2 дня назад +1

      UP govt gives relief, 2 yrs covid zero period, to builders when accepting Amitabh kant report.
      no relief to home buyers
      UP govt must give relief
      free registry for 3 yrs+ delay
      50% stsmp relief for 1 yr+ delay

    • @hb-ss1bs
      @hb-ss1bs 2 дня назад +1

      Every project is Land Mortgage Scam
      Govt Authority must publish mortgage NOC
      Bank must publish mortgage debt
      land, building, nuts, bolts everything is mortgaged. Debt raised and siphoned off

    • @hb-ss1bs
      @hb-ss1bs 2 дня назад

      never buy under construction flat
      never buy from builder
      only buy a flat already registered
      govt must levy 2,3% stamp duty abd 0.25% transfer charges

    • @hb-ss1bs
      @hb-ss1bs 2 дня назад +1

      home buyer being kicked trampled by all

    • @hb-ss1bs
      @hb-ss1bs 2 дня назад

      publish name of allottee as in Dubai

  • @uniquechetu
    @uniquechetu День назад

    Sufficient water supply nahi hai na drinking na borewell, govt builder aur society ke upar dhakel rahi hai..bina water facilities project ko CC aur OC mil raha hai..bahut sare jagah tanker se water supply ho raha hai..buyers ke sath itna fraud kyu.. permission kyu milta hai aise projects ko..neral me tanker se water supply ho raha hai bahut sari sari projects me

  • @sarfarazqureshi7406
    @sarfarazqureshi7406 День назад +1

    Hi sir mera builder ne 10 mahine se 9 lakh rps liya hai aur de nahi Raha hai kya aap koi help kar payenge

    • @Capricornian76
      @Capricornian76 День назад

      Builder aur Project ka naam bhi batao...

  • @Frouddevlopar
    @Frouddevlopar 2 дня назад +3

    Tera bhi buldar k haath bik gaya hai

  • @omawasthi5191
    @omawasthi5191 День назад

    Rera pura ka pura currupt hai, consumers ke liye hai but kaam builder ke liye karta hai. dala rera

  • @bbcsrefrigerationcompany4708
    @bbcsrefrigerationcompany4708 День назад

    Abhi tak Virar Global city me pani nahi aya, water connection nahi diye.
    Sab chor hai

  • @rajivgaikwad3954
    @rajivgaikwad3954 16 часов назад

    Only debate main bat karte hai real main to kuch aur hota hai. Isme aam aadmi fasta hai

  • @Siddhivinayak_temple
    @Siddhivinayak_temple День назад

    ReRa judgment is joke

  • @gkenterprises9199
    @gkenterprises9199 День назад

    Yeh saare projects adani ko dene hai isliye sab ho raha hai

  • @2009ssharad
    @2009ssharad День назад

    Ye sab officers itne dogale hote hai ki jab project shuru hai tab sote rahenge project handover hone ke bad action project par lenge na ki builder par...

  • @devendrasutrave1869
    @devendrasutrave1869 День назад

    Rera is bull shit no action taken against builders

  • @neeturamnani6706
    @neeturamnani6706 День назад

    We had booked flat in ruparel optima at Kandival west ur flat is registration done buider is fraud, rara is not taking action we book ur flat 2019 still not ready to give we have filed case in supreme court 😢😢 ve r staying on rent help u government is not helping where to go now BJP more tention help us please😢😢

  • @Kalyug550
    @Kalyug550 16 часов назад

    Kuchh nahin Joginder hai vah loot ke ham log ko chala jaega Maharashtra mein hi to chal Raha hai har EK politician BMC khas karke local log nahin hona chahie UN local ko bhi BFC mein job Milana chahie

  • @hafeezshaikh8843
    @hafeezshaikh8843 18 часов назад

    Bilder ko pass karne ke lia bilder ko carodo rera ko dane hoge awr bilder buyer se yah Rahwasyio se wasool kare ga yeh sab kamane ka dhanda ho sakta hai

  • @sandeepdesai1877
    @sandeepdesai1877 День назад

    Sab Chor hai

  • @sandeepdesai1877
    @sandeepdesai1877 День назад

    Chor Chor Frod Hai Sab

    • @rajendra4813
      @rajendra4813 15 часов назад

      Technically smart like Harshad mehata

  • @rahulzawar2219
    @rahulzawar2219 2 дня назад +1

    Vasooli shru , bhaut kharcha hua hai election mai , ladli behena 😂

  • @ShaukhatKhan-nj2ei
    @ShaukhatKhan-nj2ei День назад

    Sab kanoon bakwas hai

  • @DharmeshArtThane
    @DharmeshArtThane День назад +2

    Xrbia development vangani 2017 me buking ki tha aaj tak nahi mila