DRIVE THROUGH MORANT BAY ROUND A BOUT TO YALLAHS BRIDGE|SOUTHERN COASTAL HIGHWAY IMPROVEMENT PROJECT

Поделиться
HTML-код
  • Опубликовано: 18 ноя 2024

Комментарии • 18

  • @TheSberkley
    @TheSberkley Год назад +2

    Beautiful day to video the journey. Always love the scenery.

  • @TheSberkley
    @TheSberkley Год назад +3

    Seaview at Roselle is always breathtaking 😍 ❤️

  • @TheSberkley
    @TheSberkley Год назад +2

    Love the green of the hills before you get to Yallahs. The Sun was shining at just the right angle showing a beautiful shade of green.

  • @cecilewhite3429
    @cecilewhite3429 Год назад +4

    Thanks for the updates and your effort in explaining what is happening. Blessed🙌❤

  • @marciarobinson8200
    @marciarobinson8200 Год назад

    Our leaders are doing well love this thank you for showing us all that is being done🇯🇲☝️🌎💯 how you mean teck care ofwe Jamaica yes❤❤ from Marcia Parris Robinson

  • @anthonystewart7675
    @anthonystewart7675 Год назад +3

    I thoroughly enjoyed this drive through update bro...thanks a lot

  • @anthonyreid9366
    @anthonyreid9366 Год назад +3

    Thank you for the update. The work is trodding along.

  • @tonymurphy1743
    @tonymurphy1743 Год назад +4

    Much respect for keeping us informed of the road situation, progress is getting there blessings from down under 🦘🇦🇺🇯🇲👍🏿👍

  • @kennoybrown3946
    @kennoybrown3946 Год назад +1

    Blessup for the drive through

  • @ordmarshall2213
    @ordmarshall2213 Год назад +2

    It's a pity that only three out on ten local contractors along with CHEC are still involved in this SCHIP. Imagine how farther along they would be if all had done their part. Thanks for this update ma brother.

  • @phillipbeckford7814
    @phillipbeckford7814 Год назад +3

    Thanks for the update sir. Is the entire stretch to Yallahs S&G done by S&G???

  • @mystery5655
    @mystery5655 Год назад +3

    First on the drive through.

  • @julianevans294
    @julianevans294 Год назад +3

    2nd on the drive through

  • @Kimroy-brown.
    @Kimroy-brown. Год назад +3

    i was thinking this side time flame will be shorly

  • @clauderussell6484
    @clauderussell6484 Год назад +1

    Can't understand why so much is still incomplete. Roselle, Roach gully etc are areas where intense work was done & then little or nothing.

  • @Jonson-z1z
    @Jonson-z1z Год назад

    What about the retaining wall for the lift side of the road

  • @ancored
    @ancored Год назад +3

    The curbside, drains etc along most of that segment are sloppy

  • @walee69
    @walee69 Год назад +3

    Em..why is there a gravelled space to.the left side of the paved road and to.the right a lesser one