How to check F.F.L (Finish Floor Level) Slab on HELIPAD Structure.

Поделиться
HTML-код
  • Опубликовано: 14 окт 2024
  • How to check for Concrete slab spot height after casting. HELIPAD FFL (Finished Floor Level) Slab Layout to build the perfect Slope as the proposed designed structure.

Комментарии • 8

  • @odarteylamptey4130
    @odarteylamptey4130 2 года назад

    Good job.
    When are u bringing the continuation video

  • @omadafriday2670
    @omadafriday2670 2 года назад +1

    Very nice video. I got all your videos they are really helping me. I am new in construction work.
    I need your help on something though.
    Can you make a video for "how to slope land surface for e.g cut and fill, and how to slope the terrain to drain water in a certain direction?.
    I am presently working on road construction, we don't use formation level or anything from the software we just calculate onsite to determine the cut and fill. I am not actually getting the calculation.
    I would appreciate if you can do a tutorial on that.
    Thanks

    • @arogunreomotoyosi288
      @arogunreomotoyosi288  2 года назад

      Alright.
      Thanks for your nice comment.
      Are you a surveyor?

    • @omadafriday2670
      @omadafriday2670 2 года назад +1

      @@arogunreomotoyosi288 yes i am a surveyor. But not registered yet.

    • @arogunreomotoyosi288
      @arogunreomotoyosi288  2 года назад

      @@omadafriday2670 Okay.
      Good to hear.
      I will work on that as soon as possible

    • @omadafriday2670
      @omadafriday2670 2 года назад

      @@arogunreomotoyosi288 ok thank you so much.

  • @philipebenezeradamilo1830
    @philipebenezeradamilo1830 Год назад

    Thanks for your videos sir, please I need a tutorial video on how to do setting out using dgps