Sir please explain what would the condition prevails if card fails during live environment does it hold the last value/status or it will go offline by showing no readings?
You will lose all signals from this card.. except you have a redundent setup. But in this case there none... also the card was not fully plugged in if it where the power LED is lit up independently from it's process state. You can see it on the clamps above they are not in line... RED mostly means no response... which is another indication of this state...
Hi, You need to build the new graphics page through the HMI web display builder. Instead of doing this kindly make on of the page as a copy then edit it. It is good practice to use the default given data like shapes, popups etc.
Verry good explanation please continue posting video on honywell dcs and safety manager
Gud Job, very informative..keep posting more video about HONEYWELL EPKS... Please make the video for replacing & configure c300 Controller
Nice video , please make video for function block, forcing, i/0 wire tracking through DCS.
Very good video sir
Keep sharing the videos to others also.
Thank you.
Very Well Explained...
@Smart Instru
Thank you & I watched your videos related to centum vp DCS and they are also good. If possible upload the rest videos also.
@@teaminstrumentationcontrol4006 Thanks...
Sir please explain what would the condition prevails if card fails during live environment does it hold the last value/status or it will go offline by showing no readings?
sir...plz make video on replacing & configure c300 Controller...and how to bypass any field instrument in DCS system.
thanks a lot Sir , it's Excellent Videos , would you please explain more about the HMIweb builder and Control Builder configuration.
Sir it was a good video
I want to know that can we replace the module when plant is running?
Please tell me
You will lose all signals from this card.. except you have a redundent setup. But in this case there none... also the card was not fully plugged in if it where the power LED is lit up independently from it's process state. You can see it on the clamps above they are not in line... RED mostly means no response... which is another indication of this state...
Sir please explain gas turbine starting and shutdown sequence
Great
C200 cpu.Control builder and station. Chinese manufacture power plant.
is it honeywell tdc 3000? and are you using Picture editor and command processor?
No. It's EPKS system R400.2 version. Logic interface is through the control builder software.
@@teaminstrumentationcontrol4006 ok, pleas keep uploading videos.
How to make a new graphics page in Honeywell
Hi,
You need to build the new graphics page through the HMI web display builder. Instead of doing this kindly make on of the page as a copy then edit it. It is good practice to use the default given data like shapes, popups etc.
I'm in honeywell
Hi sir is there any vacancy for instrument engineer
Sir, email pliss