ganda pag tapos na ang subway. halos connected na mga CBDs ng metro manila.. mula vertis north pwede ka sumakay ng subway pag baba mo either Ortigas na or BGC ahaha
Ang contractor dyan: Sumitomo Mitsui Construction company Limited na contractor din ng NSCR Phase 1 hanggang Malolos, Bulacan, so dalawa ang hawak ng Sumitomo Mitsui Construction Company Limited sa NSCR Phase 1 and Subway Line 9 Package CP103
Sana noon pa nila sinimulan after WWII,see Hongkong may 9 Subways train terminal inter connected sa isang Central terminal. see google map Hongkong subways terminal
sana maging full operation ang subway sa 2027 or first quarter ng 2028 kase parang malabong dahil marami pang d naiaward at may row pang problema. sana maging partial operation naman sa 2026 kahit hanggang quezon ave muna.
@@lolzlatoz-ih4vv Yung sinasabi mong 2031 ay sa Cavite Extension Phase 2 at Phase 3 ng LRT 1 mula Dr. Santos to Las Piñas then Las Piñas to Zapote Hanggang Niog sa Cavite
ganda pag tapos na ang subway. halos connected na mga CBDs ng metro manila.. mula vertis north pwede ka sumakay ng subway pag baba mo either Ortigas na or BGC ahaha
Continues to blogged all new infrastructure and development in our country and hopefully more jobs for the Filipino.
Impressive progress. The subway is situated in areas that can potentially reduce traffic congestion. Looking forward to more developments. 🇵🇭👍
Ang contractor dyan: Sumitomo Mitsui Construction company Limited na contractor din ng NSCR Phase 1 hanggang Malolos, Bulacan, so dalawa ang hawak ng Sumitomo Mitsui Construction Company Limited sa NSCR Phase 1 and Subway Line 9 Package CP103
Sana noon pa nila sinimulan after WWII,see Hongkong may 9 Subways train terminal inter connected sa isang Central terminal. see google map Hongkong subways terminal
considered na rin common station
sana maging full operation ang subway sa 2027 or first quarter ng 2028 kase parang malabong dahil marami pang d naiaward at may row pang problema. sana maging partial operation naman sa 2026 kahit hanggang quezon ave muna.
partial operations lang yata. 2031 pa full operations nya. same sa Nscr
2029 pa po ang Opening as per DOTR statement dahil sa pandemic noong 2020 to 2021
@@lolzlatoz-ih4vv Yung sinasabi mong 2031 ay sa Cavite Extension Phase 2 at Phase 3 ng LRT 1 mula Dr. Santos to Las Piñas then Las Piñas to Zapote Hanggang Niog sa Cavite
@@JamesLagutinsir start construction po January 2023 lng kaya 2029 pa full operation o bka abutin na yan 2030
MABUHAY 🤘🇵🇭🤘
yan ang tatak duterte..salamat po tatay digong .makikinabang jn anak ko at mga magiging apo ko .
right of way of is the station locations?
@@marvinsantos2977 yes some parts not secured( right of way ) from kalayaan to bicutan
@@NEONFLIX in btween stations po or the stations itself? binabayaran din ba un in between stations?