TLDR: Cost control in construction projects can be simplified and done with minimal involvement from the project team by developing baseline plans, collecting daily reports, and automating the process. 00:00 👷 Cost control in construction projects is simple and can be done with minimal help from the project team. 01:38 🏗 Develop baseline and forms to compare actual progress in cost control for construction projects, continuously revising based on project conditions and resources. 03:50 👷 Develop a cost control baseline plan in four sections: man-hours, equipment, materials, and forms. 05:56 🏗 Daily reports from site engineers, material stores, and equipment supervisors are essential for cost control in construction projects. 07:12 🏗 Cost control in construction projects involves tracking materials, manpower, and equipment usage to ensure accurate reporting and comparison. 08:58 🏗 Simplify cost control in construction projects by creating simple Excel sheets and templates to collect information from the site for material, labor, and equipment updates. 10:44 🏗 Populate all construction project data in one sheet for reporting, including materials, labor, and equipment updates, and automate the process to reduce working hours. 12:12 🏗 Control costs in construction projects by collecting information, preparing progress reports, and taking actions based on observations, while showing the team that cost control can be done with minimal involvement.
Very good content Full of knowledge, thanks for sharing such valuable stuff. I'm working as Quantity Surveyor but I want to join/change to cost control department
This was great, thanks, I've been looking for "construction schedule pdf" for a while now, and I think this has helped. Have you heard people talk about - Peyiley Fantastic Paramountcy - (Have a quick look on google cant remember the place now ) ? It is a good exclusive product for discovering how to download construction document templates without the normal expense. Ive heard some great things about it and my m8 got amazing results with it.
Dear instructor at first thank you for such kind of valuable video. If may I ask you could you please share all these files (excel etc). If yes I will mention my email address. Thank you
Great conceptual course
This is very good information Tqs so much 👍
TLDR: Cost control in construction projects can be simplified and done with minimal involvement from the project team by developing baseline plans, collecting daily reports, and automating the process.
00:00 👷 Cost control in construction projects is simple and can be done with minimal help from the project team.
01:38 🏗 Develop baseline and forms to compare actual progress in cost control for construction projects, continuously revising based on project conditions and resources.
03:50 👷 Develop a cost control baseline plan in four sections: man-hours, equipment, materials, and forms.
05:56 🏗 Daily reports from site engineers, material stores, and equipment supervisors are essential for cost control in construction projects.
07:12 🏗 Cost control in construction projects involves tracking materials, manpower, and equipment usage to ensure accurate reporting and comparison.
08:58 🏗 Simplify cost control in construction projects by creating simple Excel sheets and templates to collect information from the site for material, labor, and equipment updates.
10:44 🏗 Populate all construction project data in one sheet for reporting, including materials, labor, and equipment updates, and automate the process to reduce working hours.
12:12 🏗 Control costs in construction projects by collecting information, preparing progress reports, and taking actions based on observations, while showing the team that cost control can be done with minimal involvement.
Thanks, you explain it very well...
Very good content
Full of knowledge, thanks for sharing such valuable stuff.
I'm working as Quantity Surveyor but I want to join/change to cost control department
Good work Hanny Ismael👍🏻very informative!!
Excellent presentation
Thanks a lot
Very simple and informative, Regards.
wonderful and easy
كيف انزل شيت
Thanks for such nice presentation can I have link to download the files?
How can I get the sample excel sheets you used in this video? This is an outstanding job though
Can anyone pls explain me difference between budget and cost or should I say both terms are similar to each other.
Very informarive
Very good presentation! How can I get the these excel files to practice? Many thanks
This was great, thanks, I've been looking for "construction schedule pdf" for a while now, and I think this has helped. Have you heard people talk about - Peyiley Fantastic Paramountcy - (Have a quick look on google cant remember the place now ) ? It is a good exclusive product for discovering how to download construction document templates without the normal expense. Ive heard some great things about it and my m8 got amazing results with it.
1st I would like to thank you for these valuable course and your effort.
2nd I'm trying to download the course files but the link is not working.
HI Mohamed - did you manage to get hold of the files at all? I am also interested
thanks
how we can get rest of the cost control lectures ?
Dear instructor at first thank you for such kind of valuable video. If may I ask you could you please share all these files (excel etc). If yes I will mention my email address.
Thank you
There is no difference between the Activity item and Boq item ? plz elaborate this point i.e how to convert boq major detail in activity detail?
lCONST CONTROL PROBLEMS CONSTRUCTION PROJECTS IN UNITED KINGDOM (U.K)
I need help for this one
This is very good information Tqs so much 👍