First Inaugural Run/ Commercial Run of Burimari Express Train arriving at Dhaka | Bangladesh Railway

Поделиться
HTML-код
  • Опубликовано: 12 сен 2024
  • Lalmonirhat to Dhaka (লালমনিরহাট থেকে ঢাকা ট্রেন) First inaugural run/ commercial run (প্রথম উদ্বোধনী যাত্রা/ প্রথম বাণিজ্যিক যাত্রা) of Intercity (আন্তঃনগর) Burimari Express Train (বুড়িমারী এক্সপ্রেস ট্রেন) powered by EMD 3021 GT38ACL Diesel Locomotive built by Hyundai Rotem, South Korea with PT INKA made air brake coaches crawling through Banani Railway Station, Dhaka || Bangladesh Railway (বাংলাদেশ রেলওয়ে)
    Details Train Information:
    Train Name: Burimari Express Train
    Route: Lalmonirhat Railway Station to Dhaka Railway Station Train
    Code: 810
    Power Distribution: Newly EMD 3021 GT38ACL full A/C Cab Meter Gauge Diesel Locomotive
    Locomotive manufactured by : Hyundai ROTEM, South Korea
    Power type Diesel-Electric
    Designer : Electro Motive Diesel Inc.
    Maximum Speed: 110 Km/h (68 mph)
    Power Output: 2200 HP
    Rake Composition: PT INKA Air Brake Rake built by PT INKA Industri Kereta API, Indonesia
    Type: Intercity Train
    Owner: Bangladesh Railway
    Location: Banani Railway Station, Dhaka District, Bangladesh
    ট্রেনের নাম: বুড়িমারী এক্সপ্রেস ট্রেন
    রুট: লালমনিরহাট রেলওয়ে ষ্টেশন থেকে ঢাকা রেলওয়ে ষ্টেশন ট্রেন
    ট্রেন কোড: ৮১০
    ধরণ: আন্তঃনগর ট্রেন সার্ভিস/ রেলগাড়ি
    কোচ: পিটি ইনকা কোচ
    মালিক: বাংলাদেশ রেলওয়ে
    লোকেশন: বনানী রেলওয়ে স্টেশন, ঢাকা জেলা, বাংলাদেশ
    Video Capturing Date: 13.03.2024 (March 13, 2024)
    #burimari_express
    #deshi_train
    #Bangladesh_Railway
    #train
    #trains
    #bd
    #trainvideo
    #trainvideos
    #expresstrain

Комментарии • 15